{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/10.1-104.8.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/10.1-104.8.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/10.1-104.8.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/10.1-104.8.html"}],"law_id":71820,"edition_id":1,"section_id":71820,"structure_id":16232,"section_number":"10.1-104.8","catch_line":"Resource management plans; criteria","history":"2011, c. 781.","full_text":"A\n\nThe Soil and Water Conservation Board shall by regulation, and in consultation with the Department of Agriculture and Consumer Services and the Department of Environmental Quality, specify the criteria to be included in a resource management plan.B\n\nThe regulations shall:1\n\nBe technically achievable and take into consideration the economic impact to the agricultural landowner or operator;2\n\nInclude (i) determinations of persons qualified to develop resource management plans and to perform on-farm best management practice assessments; (ii) plan approval or review procedures if determined necessary; (iii) allowable implementation timelines and schedules; (iv) determinations of the effective life of the resource management plans taking into consideration a change in or a transfer of the ownership or operation of the agricultural land, a material change in the agricultural operations, issuance of a new or modified total maximum daily load (TMDL) implementation plan for the Chesapeake Bay or other local total maximum daily load water quality requirements, and a determination pursuant to Chapter 4 (&#xA7; 3.2-400 et seq.) of Title 3.2 that an agricultural activity on the land is creating or will create pollution; (v) factors that necessitate renewal or new plan development; and (vi) a means to determine full implementation and compliance with the plans including reporting and verification;3\n\nProvide for a process by which an on-farm assessment of all reportable best management practices currently in place, whether as part of a cost-share program or through voluntary implementation, shall be conducted to determine their adequacy in achieving needed on-farm nutrient, sediment, and bacteria reductions;4\n\nInclude agricultural best management practices sufficient to implement the Virginia Chesapeake Bay TMDL Watershed Implementation Plan and other local total maximum daily load water quality requirements of the Commonwealth; and5\n\nSpecify that the required components of each resource management plan shall be based upon an individual on-farm assessment. Such components shall comply with on-farm water quality objectives as set forth in subdivision B 4, including best management practices identified in this subdivision and any other best management practices approved by the Board or identified in the Chesapeake Bay Watershed Model or the Virginia Chesapeake Bay TMDL Watershed Implementation Plan.\n\t\t\t\ta. For all cropland or specialty crops such components shall include the following, as needed and based upon an individual on-farm assessment:1\n\nA nutrient management plan that meets the nutrient management specifications developed by the Department;2\n\nA forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications;3\n\nA soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service; and4\n\nCover crops meeting best management practice specifications as determined by the Natural Resources Conservation Service or the Virginia Agricultural Best Management Practices Cost-Share Program.\n\t\t\t\t\tb. For all hayland, such components shall include the following, as needed and based upon an individual on-farm assessment:1\n\nA nutrient management plan that meets the nutrient management specifications developed by the Department;2\n\nA forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications; and3\n\nA soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.\n\t\t\t\t\tc. For all pasture, such components shall include the following, as needed and based upon an individual on-farm assessment:1\n\nA nutrient management plan that meets the nutrient management specifications developed by the Department;2\n\nA system that limits or prevents livestock access to perennial streams; and3\n\nA pasture management plan or soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.","order_by":null,"text":{"0":{"id":258729,"text":"The Soil and Water Conservation Board shall by regulation, and in consultation with the Department of Agriculture and Consumer Services and the Department of Environmental Quality, specify the criteria to be included in a resource management plan.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":258730,"text":"The regulations shall:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"B1"},"2":{"id":258731,"text":"Be technically achievable and take into consideration the economic impact to the agricultural landowner or operator;","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"3":{"id":258732,"text":"Include (i) determinations of persons qualified to develop resource management plans and to perform on-farm best management practice assessments; (ii) plan approval or review procedures if determined necessary; (iii) allowable implementation timelines and schedules; (iv) determinations of the effective life of the resource management plans taking into consideration a change in or a transfer of the ownership or operation of the agricultural land, a material change in the agricultural operations, issuance of a new or modified total maximum daily load (TMDL) implementation plan for the Chesapeake Bay or other local total maximum daily load water quality requirements, and a determination pursuant to Chapter 4 (&#xA7; 3.2-400 et seq.) of Title 3.2 that an agricultural activity on the land is creating or will create pollution; (v) factors that necessitate renewal or new plan development; and (vi) a means to determine full implementation and compliance with the plans including reporting and verification;","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"4":{"id":258733,"text":"Provide for a process by which an on-farm assessment of all reportable best management practices currently in place, whether as part of a cost-share program or through voluntary implementation, shall be conducted to determine their adequacy in achieving needed on-farm nutrient, sediment, and bacteria reductions;","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"B4"},"5":{"id":258734,"text":"Include agricultural best management practices sufficient to implement the Virginia Chesapeake Bay TMDL Watershed Implementation Plan and other local total maximum daily load water quality requirements of the Commonwealth; and","type":"section","prefixes":["B","4"],"prefix":"4","entire_prefix":"B4","prefix_anchor":"B4","level":2,"prior_prefix":"B3","next_prefix":"B5"},"6":{"id":258735,"text":"Specify that the required components of each resource management plan shall be based upon an individual on-farm assessment. Such components shall comply with on-farm water quality objectives as set forth in subdivision B 4, including best management practices identified in this subdivision and any other best management practices approved by the Board or identified in the Chesapeake Bay Watershed Model or the Virginia Chesapeake Bay TMDL Watershed Implementation Plan.\n\t\t\t\ta. For all cropland or specialty crops such components shall include the following, as needed and based upon an individual on-farm assessment:","type":"section","prefixes":["B","5"],"prefix":"5","entire_prefix":"B5","prefix_anchor":"B5","level":2,"prior_prefix":"B4","next_prefix":"B51"},"7":{"id":258736,"text":"A nutrient management plan that meets the nutrient management specifications developed by the Department;","type":"section","prefixes":["B","5","1"],"prefix":"1","entire_prefix":"B51","prefix_anchor":"B51","level":3,"prior_prefix":"B5","next_prefix":"B52"},"8":{"id":258737,"text":"A forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications;","type":"section","prefixes":["B","5","2"],"prefix":"2","entire_prefix":"B52","prefix_anchor":"B52","level":3,"prior_prefix":"B51","next_prefix":"B53"},"9":{"id":258738,"text":"A soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service; and","type":"section","prefixes":["B","5","3"],"prefix":"3","entire_prefix":"B53","prefix_anchor":"B53","level":3,"prior_prefix":"B52","next_prefix":"B54"},"10":{"id":258739,"text":"Cover crops meeting best management practice specifications as determined by the Natural Resources Conservation Service or the Virginia Agricultural Best Management Practices Cost-Share Program.\n\t\t\t\t\tb. For all hayland, such components shall include the following, as needed and based upon an individual on-farm assessment:","type":"section","prefixes":["B","5","4"],"prefix":"4","entire_prefix":"B54","prefix_anchor":"B54","level":3,"prior_prefix":"B53","next_prefix":"B51"},"11":{"id":258740,"text":"A nutrient management plan that meets the nutrient management specifications developed by the Department;","type":"section","prefixes":["B","5","1"],"prefix":"1","entire_prefix":"B51","prefix_anchor":"B51","level":3,"prior_prefix":"B54","next_prefix":"B52"},"12":{"id":258741,"text":"A forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications; and","type":"section","prefixes":["B","5","2"],"prefix":"2","entire_prefix":"B52","prefix_anchor":"B52","level":3,"prior_prefix":"B51","next_prefix":"B53"},"13":{"id":258742,"text":"A soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.\n\t\t\t\t\tc. For all pasture, such components shall include the following, as needed and based upon an individual on-farm assessment:","type":"section","prefixes":["B","5","3"],"prefix":"3","entire_prefix":"B53","prefix_anchor":"B53","level":3,"prior_prefix":"B52","next_prefix":"B51"},"14":{"id":258743,"text":"A nutrient management plan that meets the nutrient management specifications developed by the Department;","type":"section","prefixes":["B","5","1"],"prefix":"1","entire_prefix":"B51","prefix_anchor":"B51","level":3,"prior_prefix":"B53","next_prefix":"B52"},"15":{"id":258744,"text":"A system that limits or prevents livestock access to perennial streams; and","type":"section","prefixes":["B","5","2"],"prefix":"2","entire_prefix":"B52","prefix_anchor":"B52","level":3,"prior_prefix":"B51","next_prefix":"B53"},"16":{"id":258745,"text":"A pasture management plan or soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.","type":"section","prefixes":["B","5","3"],"prefix":"3","entire_prefix":"B53","prefix_anchor":"B53","level":3,"prior_prefix":"B52"}},"ancestry":[{"id":16232,"edition_id":1,"name":"Resource Management Plans","identifier":"1.1","label":"article","depth":4,"order_by":1,"parent_id":13383,"metadata":{},"date_created":"2026-06-26 04:10:22","date_modified":"2026-06-26 04:10:22","permalink":{"id":143385,"object_type":"structure","relational_id":16232,"identifier":"1.1","token":"10.1\/I\/1\/1.1","url":"\/10.1\/I\/1\/1.1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13383,"edition_id":1,"name":"General Provisions","identifier":"1","label":"chapter","depth":3,"order_by":1,"parent_id":12893,"metadata":{},"date_created":"2026-06-26 03:44:45","date_modified":"2026-06-26 03:44:45","permalink":{"id":143317,"object_type":"structure","relational_id":13383,"identifier":"1","token":"10.1\/I\/1","url":"\/10.1\/I\/1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12893,"edition_id":1,"name":"Activities Administered by the Department of Conservation and Recreation","identifier":"I","label":"subtitle","depth":2,"order_by":1,"parent_id":12740,"metadata":{},"date_created":"2026-06-26 03:43:59","date_modified":"2026-06-26 03:43:59","permalink":{"id":143315,"object_type":"structure","relational_id":12893,"identifier":"I","token":"10.1\/I","url":"\/10.1\/I\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12740,"edition_id":1,"name":"Conservation","identifier":"10.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":143313,"object_type":"structure","relational_id":12740,"identifier":"10.1","token":"10.1","url":"\/10.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":76236,"structure_id":16232,"section_number":"10.1-104.7","catch_line":"Resource management plans; effect of implementation; exclusions","url":"\/10.1-104.7\/","token":"10.1\/I\/1\/1.1\/10.1-104.7","metadata":false},{"id":71820,"structure_id":16232,"section_number":"10.1-104.8","catch_line":"Resource management plans; criteria","url":"\/10.1-104.8\/","token":"10.1\/I\/1\/1.1\/10.1-104.8","metadata":false},{"id":65304,"structure_id":16232,"section_number":"10.1-104.9","catch_line":"Regulations under this article","url":"\/10.1-104.9\/","token":"10.1\/I\/1\/1.1\/10.1-104.9","metadata":false}],"previous_section":{"id":76236,"structure_id":16232,"section_number":"10.1-104.7","catch_line":"Resource management plans; effect of implementation; exclusions","url":"\/10.1-104.7\/","token":"10.1\/I\/1\/1.1\/10.1-104.7","metadata":false},"next_section":{"id":65304,"structure_id":16232,"section_number":"10.1-104.9","catch_line":"Regulations under this article","url":"\/10.1-104.9\/","token":"10.1\/I\/1\/1.1\/10.1-104.9","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/10.1-104.8\/","history_text":"<p>This law was first created in 2011. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?111+ful+CHAP0781\">781<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":76236,"section_number":"10.1-104.7","catch_line":"Resource management plans; effect of implementation; exclusions","order_by":null,"url":"\/10.1-104.7\/"},{"id":59772,"section_number":"2.2-3705.6","catch_line":"Exclusions to application of chapter; proprietary records and trade secrets","order_by":null,"url":"\/2.2-3705.6\/"}],"refers_to":[{"id":55834,"section_number":"3.2-400","catch_line":"Definitions","order_by":null,"url":"\/3.2-400\/"}],"permalink":{"id":143391,"object_type":"law","relational_id":71820,"identifier":"10.1-104.8","token":"10.1\/I\/1\/1.1\/10.1-104.8","url":"\/10.1-104.8\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/10.1-104.8\/","token":"10.1\/I\/1\/1.1\/10.1-104.8","dublin_core":{"Title":"Resource management plans; criteria","Type":"Text","Format":"text\/html","Identifier":"\u00a7 10.1-104.8","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The Soil and Water Conservation Board shall by regulation, and in consultation with the <span class=\"dictionary\">Department<\/span> of Agriculture and Consumer Services and the <span class=\"dictionary\">Department<\/span> of Environmental Quality, specify the criteria to be included in a resource management plan. <a id=\"paragraph-258729\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The regulations shall: <a id=\"paragraph-258730\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Be technically achievable and take into consideration the economic impact to the agricultural landowner or operator; <a id=\"paragraph-258731\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> Include (i) determinations of persons qualified to develop resource management plans and to perform on-farm best management practice assessments; (ii) plan approval or review procedures if determined necessary; (iii) allowable implementation timelines and <span class=\"dictionary\">schedules<\/span>; (iv) determinations of the effective life of the resource management plans taking into consideration a change in or a transfer of the ownership or operation of the agricultural land, a <span class=\"dictionary\">material<\/span> change in the agricultural operations, issuance of a new or modified total maximum daily load (TMDL) implementation plan for the Chesapeake Bay or other local total maximum daily load water quality requirements, and a determination pursuant to Chapter 4 (&#xA7; <a class=\"law\" title=\"Definitions\" href=\"\/3.2-400\/\">3.2-400<\/a> et seq.) of Title 3.2 that an agricultural activity on the land is creating or will create pollution; (v) factors that necessitate renewal or new plan development; and (vi) a means to determine full implementation and compliance with the plans including reporting and verification; <a id=\"paragraph-258732\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Provide for a process by which an on-farm assessment of all reportable best management practices currently in place, whether as part of a cost-share program or through voluntary implementation, shall be conducted to determine their adequacy in achieving needed on-farm nutrient, sediment, and bacteria reductions; <a id=\"paragraph-258733\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> Include agricultural best management practices sufficient to implement the Virginia Chesapeake Bay TMDL Watershed Implementation Plan and other local total maximum daily load water quality requirements of the Commonwealth; and <a id=\"paragraph-258734\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B5\" class=\"indent-1\"><p><span class=\"prefix-number\">5.<\/span> Specify that the required components of each resource management plan shall be based upon an individual on-farm assessment. Such components shall comply with on-farm water quality objectives as set forth in subdivision B 4, including best management practices identified in this subdivision and any other best management practices approved by the Board or identified in the Chesapeake Bay Watershed Model or the Virginia Chesapeake Bay TMDL Watershed Implementation Plan.\n\t\t\t\ta. For all cropland or specialty crops such components shall include the following, as needed and based upon an individual on-farm assessment: <a id=\"paragraph-258735\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B5\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B51\" class=\"indent-2\"><p><span class=\"prefix-number\">1.<\/span> A nutrient management plan that meets the nutrient management specifications developed by the <span class=\"dictionary\">Department<\/span>; <a id=\"paragraph-258736\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B51\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B52\" class=\"indent-2\"><p><span class=\"prefix-number\">2.<\/span> A forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications; <a id=\"paragraph-258737\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B52\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B53\" class=\"indent-2\"><p><span class=\"prefix-number\">3.<\/span> A soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service; and <a id=\"paragraph-258738\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B53\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B54\" class=\"indent-2\"><p><span class=\"prefix-number\">4.<\/span> Cover crops meeting best management practice specifications as determined by the Natural Resources Conservation Service or the Virginia Agricultural Best Management Practices Cost-Share Program.\n\t\t\t\t\tb. For all hayland, such components shall include the following, as needed and based upon an individual on-farm assessment: <a id=\"paragraph-258739\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B54\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B51\" class=\"indent-2\"><p><span class=\"prefix-number\">1.<\/span> A nutrient management plan that meets the nutrient management specifications developed by the <span class=\"dictionary\">Department<\/span>; <a id=\"paragraph-258740\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B51\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B52\" class=\"indent-2\"><p><span class=\"prefix-number\">2.<\/span> A forest or grass buffer between cropland and perennial streams of sufficient width to meet water quality objectives and consistent with Natural Resources Conservation Service standards and specifications; and <a id=\"paragraph-258741\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B52\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B53\" class=\"indent-2\"><p><span class=\"prefix-number\">3.<\/span> A soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.\n\t\t\t\t\tc. For all pasture, such components shall include the following, as needed and based upon an individual on-farm assessment: <a id=\"paragraph-258742\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B53\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B51\" class=\"indent-2\"><p><span class=\"prefix-number\">1.<\/span> A nutrient management plan that meets the nutrient management specifications developed by the <span class=\"dictionary\">Department<\/span>; <a id=\"paragraph-258743\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B51\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B52\" class=\"indent-2\"><p><span class=\"prefix-number\">2.<\/span> A system that limits or prevents livestock access to perennial streams; and <a id=\"paragraph-258744\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B52\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B53\" class=\"indent-2\"><p><span class=\"prefix-number\">3.<\/span> A pasture management plan or soil conservation plan that achieves a maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural Resources Conservation Service. <a id=\"paragraph-258745\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/10.1-104.8\/#B53\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nRESOURCE MANAGEMENT PLANS; CRITERIA (\u00a7 10.1-104.8)\n\nA. The Soil and Water Conservation Board shall by regulation, and in\nconsultation with the Department of Agriculture and Consumer Services and the\nDepartment of Environmental Quality, specify the criteria to be included in a\nresource management plan.\n\nB. The regulations shall:\n\n   1. Be technically achievable and take into consideration the economic impact\n   to the agricultural landowner or operator;\n\n   2. Include (i) determinations of persons qualified to develop resource\n   management plans and to perform on-farm best management practice assessments;\n   (ii) plan approval or review procedures if determined necessary; (iii)\n   allowable implementation timelines and schedules; (iv) determinations of the\n   effective life of the resource management plans taking into consideration a\n   change in or a transfer of the ownership or operation of the agricultural\n   land, a material change in the agricultural operations, issuance of a new or\n   modified total maximum daily load (TMDL) implementation plan for the\n   Chesapeake Bay or other local total maximum daily load water quality\n   requirements, and a determination pursuant to Chapter 4 (&#xA7; 3.2-400 et\n   seq.) of Title 3.2 that an agricultural activity on the land is creating or\n   will create pollution; (v) factors that necessitate renewal or new plan\n   development; and (vi) a means to determine full implementation and compliance\n   with the plans including reporting and verification;\n\n   3. Provide for a process by which an on-farm assessment of all reportable best\n   management practices currently in place, whether as part of a cost-share\n   program or through voluntary implementation, shall be conducted to determine\n   their adequacy in achieving needed on-farm nutrient, sediment, and bacteria\n   reductions;\n\n   4. Include agricultural best management practices sufficient to implement the\n   Virginia Chesapeake Bay TMDL Watershed Implementation Plan and other local\n   total maximum daily load water quality requirements of the Commonwealth; and\n\n   5. Specify that the required components of each resource management plan shall\n   be based upon an individual on-farm assessment. Such components shall comply\n   with on-farm water quality objectives as set forth in subdivision B 4,\n   including best management practices identified in this subdivision and any\n   other best management practices approved by the Board or identified in the\n   Chesapeake Bay Watershed Model or the Virginia Chesapeake Bay TMDL Watershed\n   Implementation Plan.\n   \t\t\t\ta. For all cropland or specialty crops such components shall include the\n   following, as needed and based upon an individual on-farm assessment:\n\n      1. A nutrient management plan that meets the nutrient management\n      specifications developed by the Department;\n\n      2. A forest or grass buffer between cropland and perennial streams of\n      sufficient width to meet water quality objectives and consistent with\n      Natural Resources Conservation Service standards and specifications;\n\n      3. A soil conservation plan that achieves a maximum soil loss rate of\n      &#8220;T,&#8221; as defined by the Natural Resources Conservation Service;\n      and\n\n      4. Cover crops meeting best management practice specifications as determined\n      by the Natural Resources Conservation Service or the Virginia Agricultural\n      Best Management Practices Cost-Share Program.\n      \t\t\t\t\tb. For all hayland, such components shall include the following, as\n      needed and based upon an individual on-farm assessment:\n\n      1. A nutrient management plan that meets the nutrient management\n      specifications developed by the Department;\n\n      2. A forest or grass buffer between cropland and perennial streams of\n      sufficient width to meet water quality objectives and consistent with\n      Natural Resources Conservation Service standards and specifications; and\n\n      3. A soil conservation plan that achieves a maximum soil loss rate of\n      &#8220;T,&#8221; as defined by the Natural Resources Conservation Service.\n      \t\t\t\t\tc. For all pasture, such components shall include the following, as\n      needed and based upon an individual on-farm assessment:\n\n      1. A nutrient management plan that meets the nutrient management\n      specifications developed by the Department;\n\n      2. A system that limits or prevents livestock access to perennial streams;\n      and\n\n      3. A pasture management plan or soil conservation plan that achieves a\n      maximum soil loss rate of &#8220;T,&#8221; as defined by the Natural\n      Resources Conservation Service.\n\nHISTORY: 2011, c. 781.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}