{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/15.2-2243.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/15.2-2243.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/15.2-2243.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/15.2-2243.1.html"}],"law_id":69771,"edition_id":1,"section_id":69771,"structure_id":14154,"section_number":"15.2-2243.1","catch_line":"Payment by developer or subdivider","history":"2008, c. 491.","full_text":"A\n\nIf the Department of Conservation and Recreation determines that a plan of development proposed by a developer or subdivider is wholly or partially within a dam break inundation zone and would change the spillway design flood standards of an impounding structure pursuant to &#xA7; 10.1-606.3, a locality shall require, prior to its final approval of a subdivision or development, that a developer or subdivider of land submit an engineering study in conformance with the Virginia Soil and Water Conservation Board&#8217;s standards under the Virginia Dam Safety Act (&#xA7; 10.1-604 et seq.) and the Virginia Impounding Structure Regulations (4VAC50-20). The study shall provide a contract-ready cost estimate for conducting the upgrades. The Department of Conservation and Recreation shall verify that the study conforms to the Board&#8217;s standards. Following receipt of a study, the Department shall have 15 days to determine whether the study is complete. The Department shall notify the developer or subdivider of any specific deficiencies that cause the study to be determined to be incomplete. Following a determination that a submission is complete, the Department shall notify the developer or subdivider of its approval or denial within 45 days. Any decision shall be communicated in writing and shall state the reasons for any disapproval.B\n\nFollowing the completion of the engineering studies in accordance with subsection A, and prior to any development within the dam break inundation zone, a locality shall require that a developer or subdivider of land pay 50 percent of the contract-ready costs for necessary upgrades to an impounding structure attributable to the development or subdivision, together with administrative fees not to exceed one percent of the total amount of payment required or $1,000, whichever is less. Necessary upgrades shall not include costs associated with routine operation, maintenance, and repair, nor shall necessary upgrades include repairs or upgrades to the impounding structure not made necessary by the proposed development or subdivision.C\n\nWhere a payment under subsection B is required, such payment shall be made by the developer or subdivider in accordance with the following provisions:1\n\nA locality may elect to receive such payment. Upon receipt, payments shall be kept in a separate account by the locality for each individual improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The locality may issue an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made to justify the extension and the extension is approved by the Virginia Soil and Water Conservation Board prior to the expiration of the six-year period. Should the locality be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. Any locality maintaining an account in accordance with this section may charge an administrative fee, not to exceed one percent of the total amount of payment received or $1,000, whichever is less.2\n\nIf the locality elects not to receive such payment, any payments shall be made to the Dam Safety, Flood Prevention and Protection Assistance Fund pursuant to &#xA7; 10.1-603.19:1. The funds shall be held by the Virginia Resources Authority for each improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The Board may issue an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made. Should the Department of Conservation and Recreation be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. The Virginia Resources Authority shall not have any liability for the completion of any project associated with the moneys they manage in the Dam Safety, Flood Prevention and Protection Assistance Fund.D\n\nNo locality shall be required to assume financial responsibility for upgrades except as an owner of an impounding structure.E\n\nThe owner of the impounding structure shall retain all liability associated with upgrades in accordance with &#xA7; 10.1-613.4.","order_by":null,"text":{"0":{"id":252164,"text":"If the Department of Conservation and Recreation determines that a plan of development proposed by a developer or subdivider is wholly or partially within a dam break inundation zone and would change the spillway design flood standards of an impounding structure pursuant to &#xA7; 10.1-606.3, a locality shall require, prior to its final approval of a subdivision or development, that a developer or subdivider of land submit an engineering study in conformance with the Virginia Soil and Water Conservation Board&#8217;s standards under the Virginia Dam Safety Act (&#xA7; 10.1-604 et seq.) and the Virginia Impounding Structure Regulations (4VAC50-20). The study shall provide a contract-ready cost estimate for conducting the upgrades. The Department of Conservation and Recreation shall verify that the study conforms to the Board&#8217;s standards. Following receipt of a study, the Department shall have 15 days to determine whether the study is complete. The Department shall notify the developer or subdivider of any specific deficiencies that cause the study to be determined to be incomplete. Following a determination that a submission is complete, the Department shall notify the developer or subdivider of its approval or denial within 45 days. Any decision shall be communicated in writing and shall state the reasons for any disapproval.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":252165,"text":"Following the completion of the engineering studies in accordance with subsection A, and prior to any development within the dam break inundation zone, a locality shall require that a developer or subdivider of land pay 50 percent of the contract-ready costs for necessary upgrades to an impounding structure attributable to the development or subdivision, together with administrative fees not to exceed one percent of the total amount of payment required or $1,000, whichever is less. Necessary upgrades shall not include costs associated with routine operation, maintenance, and repair, nor shall necessary upgrades include repairs or upgrades to the impounding structure not made necessary by the proposed development or subdivision.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":252166,"text":"Where a payment under subsection B is required, such payment shall be made by the developer or subdivider in accordance with the following provisions:","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B","next_prefix":"C1"},"3":{"id":252167,"text":"A locality may elect to receive such payment. Upon receipt, payments shall be kept in a separate account by the locality for each individual improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The locality may issue an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made to justify the extension and the extension is approved by the Virginia Soil and Water Conservation Board prior to the expiration of the six-year period. Should the locality be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. Any locality maintaining an account in accordance with this section may charge an administrative fee, not to exceed one percent of the total amount of payment received or $1,000, whichever is less.","type":"section","prefixes":["C","1"],"prefix":"1","entire_prefix":"C1","prefix_anchor":"C1","level":2,"prior_prefix":"C","next_prefix":"C2"},"4":{"id":252168,"text":"If the locality elects not to receive such payment, any payments shall be made to the Dam Safety, Flood Prevention and Protection Assistance Fund pursuant to &#xA7; 10.1-603.19:1. The funds shall be held by the Virginia Resources Authority for each improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The Board may issue an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made. Should the Department of Conservation and Recreation be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. The Virginia Resources Authority shall not have any liability for the completion of any project associated with the moneys they manage in the Dam Safety, Flood Prevention and Protection Assistance Fund.","type":"section","prefixes":["C","2"],"prefix":"2","entire_prefix":"C2","prefix_anchor":"C2","level":2,"prior_prefix":"C1","next_prefix":"D"},"5":{"id":252169,"text":"No locality shall be required to assume financial responsibility for upgrades except as an owner of an impounding structure.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C2","next_prefix":"E"},"6":{"id":252170,"text":"The owner of the impounding structure shall retain all liability associated with upgrades in accordance with &#xA7; 10.1-613.4.","type":"section","prefixes":["E"],"prefix":"E","entire_prefix":"E","prefix_anchor":"E","level":1,"prior_prefix":"D"}},"ancestry":[{"id":14154,"edition_id":1,"name":"Land Subdivision and Development","identifier":"6","label":"article","depth":4,"order_by":1,"parent_id":12774,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":155023,"object_type":"structure","relational_id":14154,"identifier":"6","token":"15.2\/II\/22\/6","url":"\/15.2\/II\/22\/6\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12774,"edition_id":1,"name":"Planning, Subdivision of Land and Zoning","identifier":"22","label":"chapter","depth":3,"order_by":1,"parent_id":12733,"metadata":{},"date_created":"2026-06-26 03:43:52","date_modified":"2026-06-26 03:43:52","permalink":{"id":154795,"object_type":"structure","relational_id":12774,"identifier":"22","token":"15.2\/II\/22","url":"\/15.2\/II\/22\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12733,"edition_id":1,"name":"Powers of Local Government","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12720,"metadata":{},"date_created":"2026-06-26 03:43:50","date_modified":"2026-06-26 03:43:50","permalink":{"id":152369,"object_type":"structure","relational_id":12733,"identifier":"II","token":"15.2\/II","url":"\/15.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12720,"edition_id":1,"name":"Counties, Cities and Towns","identifier":"15.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":151279,"object_type":"structure","relational_id":12720,"identifier":"15.2","token":"15.2","url":"\/15.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":83925,"structure_id":14154,"section_number":"15.2-2240","catch_line":"Localities to adopt ordinances regulating subdivision and development of land","url":"\/15.2-2240\/","token":"15.2\/II\/22\/6\/15.2-2240","metadata":false},{"id":81439,"structure_id":14154,"section_number":"15.2-2241","catch_line":"Mandatory provisions of a subdivision ordinance","url":"\/15.2-2241\/","token":"15.2\/II\/22\/6\/15.2-2241","metadata":false},{"id":69877,"structure_id":14154,"section_number":"15.2-2241.1","catch_line":"Bonding requirements for the acceptance of dedication for public use of certain facilities","url":"\/15.2-2241.1\/","token":"15.2\/II\/22\/6\/15.2-2241.1","metadata":false},{"id":62783,"structure_id":14154,"section_number":"15.2-2241.2","catch_line":"Bonding provisions for decommissioning of solar energy equipment, facilities, or devices","url":"\/15.2-2241.2\/","token":"15.2\/II\/22\/6\/15.2-2241.2","metadata":false},{"id":55314,"structure_id":14154,"section_number":"15.2-2242","catch_line":"Optional provisions of a subdivision ordinance","url":"\/15.2-2242\/","token":"15.2\/II\/22\/6\/15.2-2242","metadata":false},{"id":74283,"structure_id":14154,"section_number":"15.2-2243","catch_line":"Payment by subdivider of the pro rata share of the cost of certain facilities","url":"\/15.2-2243\/","token":"15.2\/II\/22\/6\/15.2-2243","metadata":false},{"id":69771,"structure_id":14154,"section_number":"15.2-2243.1","catch_line":"Payment by developer or subdivider","url":"\/15.2-2243.1\/","token":"15.2\/II\/22\/6\/15.2-2243.1","metadata":false},{"id":79464,"structure_id":14154,"section_number":"15.2-2244","catch_line":"Provisions for subdivision of a lot for conveyance to a family member","url":"\/15.2-2244\/","token":"15.2\/II\/22\/6\/15.2-2244","metadata":false},{"id":81830,"structure_id":14154,"section_number":"15.2-2244.1","catch_line":"Additional method for subdivision of a lot for conveyance to a family member","url":"\/15.2-2244.1\/","token":"15.2\/II\/22\/6\/15.2-2244.1","metadata":false},{"id":73711,"structure_id":14154,"section_number":"15.2-2244.2","catch_line":"Subdivision of a lot of property held in trust for a family member","url":"\/15.2-2244.2\/","token":"15.2\/II\/22\/6\/15.2-2244.2","metadata":false},{"id":61355,"structure_id":14154,"section_number":"15.2-2245","catch_line":"Provisions for periodic partial and final release of certain performance guarantees","url":"\/15.2-2245\/","token":"15.2\/II\/22\/6\/15.2-2245","metadata":false},{"id":60263,"structure_id":14154,"section_number":"15.2-2245.1","catch_line":"Stormwater management ponds; removal of trees","url":"\/15.2-2245.1\/","token":"15.2\/II\/22\/6\/15.2-2245.1","metadata":false},{"id":84876,"structure_id":14154,"section_number":"15.2-2246","catch_line":"Site plans submitted in accordance with zoning ordinance","url":"\/15.2-2246\/","token":"15.2\/II\/22\/6\/15.2-2246","metadata":false},{"id":66691,"structure_id":14154,"section_number":"15.2-2247","catch_line":"Applicability of subdivision ordinance to manufactured homes","url":"\/15.2-2247\/","token":"15.2\/II\/22\/6\/15.2-2247","metadata":false},{"id":81106,"structure_id":14154,"section_number":"15.2-2248","catch_line":"Application of certain municipal subdivision regulations beyond corporate limits of municipality","url":"\/15.2-2248\/","token":"15.2\/II\/22\/6\/15.2-2248","metadata":false},{"id":73098,"structure_id":14154,"section_number":"15.2-2249","catch_line":"Application of county subdivision regulations in area subject to municipal jurisdiction","url":"\/15.2-2249\/","token":"15.2\/II\/22\/6\/15.2-2249","metadata":false},{"id":74890,"structure_id":14154,"section_number":"15.2-2250","catch_line":"Disagreement between county and municipality as to regulations","url":"\/15.2-2250\/","token":"15.2\/II\/22\/6\/15.2-2250","metadata":false},{"id":61768,"structure_id":14154,"section_number":"15.2-2251","catch_line":"Local planning commission shall prepare and recommend ordinance; notice and hearing on ordinance","url":"\/15.2-2251\/","token":"15.2\/II\/22\/6\/15.2-2251","metadata":false},{"id":81391,"structure_id":14154,"section_number":"15.2-2252","catch_line":"Filing and recording of ordinance and amendments thereto","url":"\/15.2-2252\/","token":"15.2\/II\/22\/6\/15.2-2252","metadata":false},{"id":56433,"structure_id":14154,"section_number":"15.2-2253","catch_line":"Preparation and adoption of amendments to ordinance","url":"\/15.2-2253\/","token":"15.2\/II\/22\/6\/15.2-2253","metadata":false},{"id":71129,"structure_id":14154,"section_number":"15.2-2254","catch_line":"Statutory provisions effective after ordinance adopted","url":"\/15.2-2254\/","token":"15.2\/II\/22\/6\/15.2-2254","metadata":false},{"id":87454,"structure_id":14154,"section_number":"15.2-2255","catch_line":"Administration and enforcement of regulations","url":"\/15.2-2255\/","token":"15.2\/II\/22\/6\/15.2-2255","metadata":false},{"id":82493,"structure_id":14154,"section_number":"15.2-2256","catch_line":"Procedure to account for fees for common improvements","url":"\/15.2-2256\/","token":"15.2\/II\/22\/6\/15.2-2256","metadata":false},{"id":63483,"structure_id":14154,"section_number":"15.2-2257","catch_line":"Procedure to modify certain covenants in Shenandoah County","url":"\/15.2-2257\/","token":"15.2\/II\/22\/6\/15.2-2257","metadata":false},{"id":76956,"structure_id":14154,"section_number":"15.2-2258","catch_line":"Plat of proposed subdivision and site plans to be submitted for approval","url":"\/15.2-2258\/","token":"15.2\/II\/22\/6\/15.2-2258","metadata":false},{"id":57717,"structure_id":14154,"section_number":"15.2-2259","catch_line":"Designated agent to act on proposed final plat","url":"\/15.2-2259\/","token":"15.2\/II\/22\/6\/15.2-2259","metadata":false},{"id":66152,"structure_id":14154,"section_number":"15.2-2260","catch_line":"Localities may provide for submission of preliminary subdivision plats; how long valid","url":"\/15.2-2260\/","token":"15.2\/II\/22\/6\/15.2-2260","metadata":false},{"id":87205,"structure_id":14154,"section_number":"15.2-2261","catch_line":"Recorded plats or final site plans to be valid for not less than five years","url":"\/15.2-2261\/","token":"15.2\/II\/22\/6\/15.2-2261","metadata":false},{"id":70475,"structure_id":14154,"section_number":"15.2-2261.1","catch_line":"Recorded plat or final site plans; conflicting zoning conditions","url":"\/15.2-2261.1\/","token":"15.2\/II\/22\/6\/15.2-2261.1","metadata":false},{"id":62994,"structure_id":14154,"section_number":"15.2-2262","catch_line":"Requisites of plat","url":"\/15.2-2262\/","token":"15.2\/II\/22\/6\/15.2-2262","metadata":false},{"id":62496,"structure_id":14154,"section_number":"15.2-2263","catch_line":"Expedited land development review procedure","url":"\/15.2-2263\/","token":"15.2\/II\/22\/6\/15.2-2263","metadata":false},{"id":59776,"structure_id":14154,"section_number":"15.2-2264","catch_line":"Statement of consent to subdivision; execution; acknowledgment and recordation; notice to commissioner of the revenue or board of real estate assessors","url":"\/15.2-2264\/","token":"15.2\/II\/22\/6\/15.2-2264","metadata":false},{"id":62030,"structure_id":14154,"section_number":"15.2-2265","catch_line":"Recordation of approved plat as transfer of streets, termination of easements and rights-of-way, etc","url":"\/15.2-2265\/","token":"15.2\/II\/22\/6\/15.2-2265","metadata":false},{"id":76484,"structure_id":14154,"section_number":"15.2-2266","catch_line":"Validation of certain plats recorded before January 1, 1975","url":"\/15.2-2266\/","token":"15.2\/II\/22\/6\/15.2-2266","metadata":false},{"id":60990,"structure_id":14154,"section_number":"15.2-2267","catch_line":"Petition to restrict access to certain public streets","url":"\/15.2-2267\/","token":"15.2\/II\/22\/6\/15.2-2267","metadata":false},{"id":75430,"structure_id":14154,"section_number":"15.2-2268","catch_line":"Localities not obligated to pay for grading, paving, etc","url":"\/15.2-2268\/","token":"15.2\/II\/22\/6\/15.2-2268","metadata":false},{"id":63270,"structure_id":14154,"section_number":"15.2-2269","catch_line":"Plans and specifications for utility fixtures and systems to be submitted for approval","url":"\/15.2-2269\/","token":"15.2\/II\/22\/6\/15.2-2269","metadata":false},{"id":69505,"structure_id":14154,"section_number":"15.2-2270","catch_line":"Vacation of interests granted to a locality as a condition of site plan approval","url":"\/15.2-2270\/","token":"15.2\/II\/22\/6\/15.2-2270","metadata":false},{"id":60575,"structure_id":14154,"section_number":"15.2-2271","catch_line":"Vacation of plat before sale of lot therein; ordinance of vacation","url":"\/15.2-2271\/","token":"15.2\/II\/22\/6\/15.2-2271","metadata":false},{"id":74652,"structure_id":14154,"section_number":"15.2-2272","catch_line":"Vacation of plat after sale of lot","url":"\/15.2-2272\/","token":"15.2\/II\/22\/6\/15.2-2272","metadata":false},{"id":78526,"structure_id":14154,"section_number":"15.2-2273","catch_line":"Fee for processing application under \u00a7 15.2-2271 or \u00a7 15.2-2272","url":"\/15.2-2273\/","token":"15.2\/II\/22\/6\/15.2-2273","metadata":false},{"id":63615,"structure_id":14154,"section_number":"15.2-2274","catch_line":"Effect of vacation under \u00a7 15.2-2272","url":"\/15.2-2274\/","token":"15.2\/II\/22\/6\/15.2-2274","metadata":false},{"id":76597,"structure_id":14154,"section_number":"15.2-2275","catch_line":"Relocation or vacation of boundary lines","url":"\/15.2-2275\/","token":"15.2\/II\/22\/6\/15.2-2275","metadata":false},{"id":71806,"structure_id":14154,"section_number":"15.2-2276","catch_line":"Duty of clerk when plat vacated","url":"\/15.2-2276\/","token":"15.2\/II\/22\/6\/15.2-2276","metadata":false},{"id":87419,"structure_id":14154,"section_number":"15.2-2277","catch_line":"Franklin County may require that notice be given to deed grantees of certain disclaimers regarding responsibility for roads; county eligible to have certain streets taken into secondary system","url":"\/15.2-2277\/","token":"15.2\/II\/22\/6\/15.2-2277","metadata":false},{"id":67221,"structure_id":14154,"section_number":"15.2-2278","catch_line":"Vacating plat of subdivision","url":"\/15.2-2278\/","token":"15.2\/II\/22\/6\/15.2-2278","metadata":false},{"id":77000,"structure_id":14154,"section_number":"15.2-2279","catch_line":"Ordinances regulating the building of houses and establishing setback lines","url":"\/15.2-2279\/","token":"15.2\/II\/22\/6\/15.2-2279","metadata":false}],"previous_section":{"id":74283,"structure_id":14154,"section_number":"15.2-2243","catch_line":"Payment by subdivider of the pro rata share of the cost of certain facilities","url":"\/15.2-2243\/","token":"15.2\/II\/22\/6\/15.2-2243","metadata":false},"next_section":{"id":79464,"structure_id":14154,"section_number":"15.2-2244","catch_line":"Provisions for subdivision of a lot for conveyance to a family member","url":"\/15.2-2244\/","token":"15.2\/II\/22\/6\/15.2-2244","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/15.2-2243.1\/","history_text":"<p>This law was first created in 2008. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?081+ful+CHAP0491\">491<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":81027,"section_number":"10.1-603.17","catch_line":"Dam Safety, Flood Prevention and Protection Assistance Fund established","order_by":null,"url":"\/10.1-603.17\/"},{"id":86256,"section_number":"10.1-603.19:1","catch_line":"Payments from a developer or subdivider","order_by":null,"url":"\/10.1-603.19_1\/"},{"id":81394,"section_number":"10.1-606.3","catch_line":"Requirement for development in dam break inundation zones","order_by":null,"url":"\/10.1-606.3\/"}],"refers_to":[{"id":86256,"section_number":"10.1-603.19:1","catch_line":"Payments from a developer or subdivider","order_by":null,"url":"\/10.1-603.19_1\/"},{"id":58286,"section_number":"10.1-604","catch_line":" Definitions","order_by":null,"url":"\/10.1-604\/"},{"id":81394,"section_number":"10.1-606.3","catch_line":"Requirement for development in dam break inundation zones","order_by":null,"url":"\/10.1-606.3\/"},{"id":58273,"section_number":"10.1-613.4","catch_line":"Liability of owner or operator","order_by":null,"url":"\/10.1-613.4\/"}],"permalink":{"id":155049,"object_type":"law","relational_id":69771,"identifier":"15.2-2243.1","token":"15.2\/II\/22\/6\/15.2-2243.1","url":"\/15.2-2243.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/15.2-2243.1\/","token":"15.2\/II\/22\/6\/15.2-2243.1","dublin_core":{"Title":"Payment by developer or subdivider","Type":"Text","Format":"text\/html","Identifier":"\u00a7 15.2-2243.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> If the Department of Conservation and Recreation determines that a plan of <span class=\"dictionary\">development<\/span> proposed by a developer or subdivider is wholly or partially within a dam break inundation zone and would change the spillway design flood standards of an impounding structure pursuant to &#xA7; <a class=\"law\" title=\"Requirement for development in dam break inundation zones\" href=\"\/10.1-606.3\/\">10.1-606.3<\/a>, a <span class=\"dictionary\">locality<\/span> shall require, prior to its final approval of a subdivision or <span class=\"dictionary\">development<\/span>, that a developer or subdivider of land submit an engineering study in conformance with the Virginia Soil and Water Conservation Board&#8217;s standards under the Virginia Dam Safety Act (&#xA7; <a class=\"law\" title=\" Definitions\" href=\"\/10.1-604\/\">10.1-604<\/a> et seq.) and the Virginia Impounding Structure Regulations (4VAC50-20). The study shall provide a <span class=\"dictionary\">contract<\/span>-ready cost estimate for conducting the upgrades. The Department of Conservation and Recreation shall verify that the study conforms to the Board&#8217;s standards. Following receipt of a study, the Department shall have 15 days to determine whether the study is complete. The Department shall notify the developer or subdivider of any specific deficiencies that cause the study to be determined to be incomplete. Following a determination that a submission is complete, the Department shall notify the developer or subdivider of its approval or denial within 45 days. Any decision shall be communicated in writing and shall state the reasons for any disapproval. <a id=\"paragraph-252164\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Following the completion of the engineering studies in accordance with subsection A, and prior to any <span class=\"dictionary\">development<\/span> within the dam break inundation zone, a <span class=\"dictionary\">locality<\/span> shall require that a developer or subdivider of land pay 50 percent of the <span class=\"dictionary\">contract<\/span>-ready costs for necessary upgrades to an impounding structure attributable to the <span class=\"dictionary\">development<\/span> or subdivision, together with administrative fees not to exceed one percent of the total amount of payment required or $1,000, whichever is less. Necessary upgrades shall not include costs associated with routine operation, maintenance, and repair, nor shall necessary upgrades include repairs or upgrades to the impounding structure not made necessary by the proposed <span class=\"dictionary\">development<\/span> or subdivision. <a id=\"paragraph-252165\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> Where a payment under subsection B is required, such payment shall be made by the developer or subdivider in accordance with the following provisions: <a id=\"paragraph-252166\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> A <span class=\"dictionary\">locality<\/span> may elect to receive such payment. Upon receipt, payments shall be kept in a separate account by the <span class=\"dictionary\">locality<\/span> for each individual improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The <span class=\"dictionary\">locality<\/span> may <span class=\"dictionary\">issue<\/span> an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made to justify the extension and the extension is approved by the Virginia Soil and Water Conservation Board prior to the expiration of the six-year period. Should the <span class=\"dictionary\">locality<\/span> be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. Any <span class=\"dictionary\">locality<\/span> maintaining an account in accordance with this section may charge an administrative fee, not to exceed one percent of the total amount of payment received or $1,000, whichever is less. <a id=\"paragraph-252167\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#C1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> If the <span class=\"dictionary\">locality<\/span> elects not to receive such payment, any payments shall be made to the Dam Safety, Flood Prevention and Protection Assistance Fund pursuant to &#xA7; <a class=\"law\" title=\"Payments from a developer or subdivider\" href=\"\/10.1-603.19_1\/\">10.1-603.19:1<\/a>. The funds shall be held by the Virginia Resources Authority for each improvement project until such time as they are expended for the improvement project; however, any funds not committed by the dam owner within six years of the time of deposit shall be refunded to the developer or subdivider. The Board may <span class=\"dictionary\">issue<\/span> an extension of up to an additional four years for the use of the funds if the dam owner shows that sufficient progress is being made. Should the Department of Conservation and Recreation be unable to locate the developer or subdivider following a period of 12 months and the exercise of due diligence, the funds shall be deposited in the Dam Safety, Flood Prevention and Protection Assistance Fund for the provision of grants and loans. The Virginia Resources Authority shall not have any liability for the completion of any project associated with the moneys they manage in the Dam Safety, Flood Prevention and Protection Assistance Fund. <a id=\"paragraph-252168\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#C2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> No <span class=\"dictionary\">locality<\/span> shall be required to assume financial responsibility for upgrades except as an owner of an impounding structure. <a id=\"paragraph-252169\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"E\"><p><span class=\"prefix-number\">E.<\/span> The owner of the impounding structure shall retain all liability associated with upgrades in accordance with &#xA7; <a class=\"law\" title=\"Liability of owner or operator\" href=\"\/10.1-613.4\/\">10.1-613.4<\/a>. <a id=\"paragraph-252170\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/15.2-2243.1\/#E\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nPAYMENT BY DEVELOPER OR SUBDIVIDER (\u00a7 15.2-2243.1)\n\nA. If the Department of Conservation and Recreation determines that a plan of\ndevelopment proposed by a developer or subdivider is wholly or partially within\na dam break inundation zone and would change the spillway design flood standards\nof an impounding structure pursuant to &#xA7; 10.1-606.3, a locality shall\nrequire, prior to its final approval of a subdivision or development, that a\ndeveloper or subdivider of land submit an engineering study in conformance with\nthe Virginia Soil and Water Conservation Board&#8217;s standards under the\nVirginia Dam Safety Act (&#xA7; 10.1-604 et seq.) and the Virginia Impounding\nStructure Regulations (4VAC50-20). The study shall provide a contract-ready cost\nestimate for conducting the upgrades. The Department of Conservation and\nRecreation shall verify that the study conforms to the Board&#8217;s standards.\nFollowing receipt of a study, the Department shall have 15 days to determine\nwhether the study is complete. The Department shall notify the developer or\nsubdivider of any specific deficiencies that cause the study to be determined to\nbe incomplete. Following a determination that a submission is complete, the\nDepartment shall notify the developer or subdivider of its approval or denial\nwithin 45 days. Any decision shall be communicated in writing and shall state\nthe reasons for any disapproval.\n\nB. Following the completion of the engineering studies in accordance with\nsubsection A, and prior to any development within the dam break inundation zone,\na locality shall require that a developer or subdivider of land pay 50 percent\nof the contract-ready costs for necessary upgrades to an impounding structure\nattributable to the development or subdivision, together with administrative\nfees not to exceed one percent of the total amount of payment required or\n$1,000, whichever is less. Necessary upgrades shall not include costs associated\nwith routine operation, maintenance, and repair, nor shall necessary upgrades\ninclude repairs or upgrades to the impounding structure not made necessary by\nthe proposed development or subdivision.\n\nC. Where a payment under subsection B is required, such payment shall be made by\nthe developer or subdivider in accordance with the following provisions:\n\n   1. A locality may elect to receive such payment. Upon receipt, payments shall\n   be kept in a separate account by the locality for each individual improvement\n   project until such time as they are expended for the improvement project;\n   however, any funds not committed by the dam owner within six years of the time\n   of deposit shall be refunded to the developer or subdivider. The locality may\n   issue an extension of up to an additional four years for the use of the funds\n   if the dam owner shows that sufficient progress is being made to justify the\n   extension and the extension is approved by the Virginia Soil and Water\n   Conservation Board prior to the expiration of the six-year period. Should the\n   locality be unable to locate the developer or subdivider following a period of\n   12 months and the exercise of due diligence, the funds shall be deposited in\n   the Dam Safety, Flood Prevention and Protection Assistance Fund for the\n   provision of grants and loans. Any locality maintaining an account in\n   accordance with this section may charge an administrative fee, not to exceed\n   one percent of the total amount of payment received or $1,000, whichever is\n   less.\n\n   2. If the locality elects not to receive such payment, any payments shall be\n   made to the Dam Safety, Flood Prevention and Protection Assistance Fund\n   pursuant to &#xA7; 10.1-603.19:1. The funds shall be held by the Virginia\n   Resources Authority for each improvement project until such time as they are\n   expended for the improvement project; however, any funds not committed by the\n   dam owner within six years of the time of deposit shall be refunded to the\n   developer or subdivider. The Board may issue an extension of up to an\n   additional four years for the use of the funds if the dam owner shows that\n   sufficient progress is being made. Should the Department of Conservation and\n   Recreation be unable to locate the developer or subdivider following a period\n   of 12 months and the exercise of due diligence, the funds shall be deposited\n   in the Dam Safety, Flood Prevention and Protection Assistance Fund for the\n   provision of grants and loans. The Virginia Resources Authority shall not have\n   any liability for the completion of any project associated with the moneys\n   they manage in the Dam Safety, Flood Prevention and Protection Assistance\n   Fund.\n\nD. No locality shall be required to assume financial responsibility for upgrades\nexcept as an owner of an impounding structure.\n\nE. The owner of the impounding structure shall retain all liability associated\nwith upgrades in accordance with &#xA7; 10.1-613.4.\n\nHISTORY: 2008, c. 491.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}