{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/2.2-4335.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/2.2-4335.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/2.2-4335.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/2.2-4335.html"}],"law_id":84415,"edition_id":1,"section_id":84415,"structure_id":12805,"section_number":"2.2-4335","catch_line":"Public construction contract provisions barring damages for unreasonable delays declared void","history":"1991, c. 701, \u00a7 11-56.2; 2001, cc. 324, 844.","full_text":"A\n\nAny provision contained in any public construction contract that purports to waive, release, or extinguish the rights of a contractor to recover costs or damages for unreasonable delay in performing such contract, either on his behalf or on behalf of his subcontractor if and to the extent the delay is caused by acts or omissions of the public body, its agents or employees and due to causes within their control shall be void and unenforceable as against public policy.B\n\nSubsection A shall not be construed to render void any provision of a public construction contract that:1\n\nAllows a public body to recover that portion of delay costs caused by the acts or omissions of the contractor, or its subcontractors, agents or employees;2\n\nRequires notice of any delay by the party claiming the delay;3\n\nProvides for liquidated damages for delay; or4\n\nProvides for arbitration or any other procedure designed to settle contract disputes.C\n\nA contractor making a claim against a public body for costs or damages due to the alleged delaying of the contractor in the performance of its work under any public construction contract shall be liable to the public body and shall pay it for a percentage of all costs incurred by the public body in investigating, analyzing, negotiating, litigating and arbitrating the claim, which percentage shall be equal to the percentage of the contractor&#8217;s total delay claim that is determined through litigation or arbitration to be false or to have no basis in law or in fact.D\n\nA public body denying a contractor&#8217;s claim for costs or damages due to the alleged delaying of the contractor in the performance of work under any public construction contract shall be liable to and shall pay such contractor a percentage of all costs incurred by the contractor to investigate, analyze, negotiate, litigate and arbitrate the claim. The percentage paid by the public body shall be equal to the percentage of the contractor&#8217;s total delay claim for which the public body&#8217;s denial is determined through litigation or arbitration to have been made in bad faith.","order_by":null,"text":{"0":{"id":302581,"text":"Any provision contained in any public construction contract that purports to waive, release, or extinguish the rights of a contractor to recover costs or damages for unreasonable delay in performing such contract, either on his behalf or on behalf of his subcontractor if and to the extent the delay is caused by acts or omissions of the public body, its agents or employees and due to causes within their control shall be void and unenforceable as against public policy.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":302582,"text":"Subsection A shall not be construed to render void any provision of a public construction contract that:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"B1"},"2":{"id":302583,"text":"Allows a public body to recover that portion of delay costs caused by the acts or omissions of the contractor, or its subcontractors, agents or employees;","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"3":{"id":302584,"text":"Requires notice of any delay by the party claiming the delay;","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"4":{"id":302585,"text":"Provides for liquidated damages for delay; or","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"B4"},"5":{"id":302586,"text":"Provides for arbitration or any other procedure designed to settle contract disputes.","type":"section","prefixes":["B","4"],"prefix":"4","entire_prefix":"B4","prefix_anchor":"B4","level":2,"prior_prefix":"B3","next_prefix":"C"},"6":{"id":302587,"text":"A contractor making a claim against a public body for costs or damages due to the alleged delaying of the contractor in the performance of its work under any public construction contract shall be liable to the public body and shall pay it for a percentage of all costs incurred by the public body in investigating, analyzing, negotiating, litigating and arbitrating the claim, which percentage shall be equal to the percentage of the contractor&#8217;s total delay claim that is determined through litigation or arbitration to be false or to have no basis in law or in fact.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B4","next_prefix":"D"},"7":{"id":302588,"text":"A public body denying a contractor&#8217;s claim for costs or damages due to the alleged delaying of the contractor in the performance of work under any public construction contract shall be liable to and shall pay such contractor a percentage of all costs incurred by the contractor to investigate, analyze, negotiate, litigate and arbitrate the claim. The percentage paid by the public body shall be equal to the percentage of the contractor&#8217;s total delay claim for which the public body&#8217;s denial is determined through litigation or arbitration to have been made in bad faith.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C"}},"ancestry":[{"id":12805,"edition_id":1,"name":"Contract Formation and Administration","identifier":"2","label":"article","depth":5,"order_by":1,"parent_id":12752,"metadata":{},"date_created":"2026-06-26 03:43:54","date_modified":"2026-06-26 03:43:54","permalink":{"id":177013,"object_type":"structure","relational_id":12805,"identifier":"2","token":"2.2\/II\/B\/43\/2","url":"\/2.2\/II\/B\/43\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12752,"edition_id":1,"name":"Virginia Public Procurement Act","identifier":"43","label":"chapter","depth":4,"order_by":1,"parent_id":12751,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":176989,"object_type":"structure","relational_id":12752,"identifier":"43","token":"2.2\/II\/B\/43","url":"\/2.2\/II\/B\/43\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12751,"edition_id":1,"name":"Transaction of Public Business","identifier":"B","label":"part","depth":3,"order_by":1,"parent_id":12750,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":176445,"object_type":"structure","relational_id":12751,"identifier":"B","token":"2.2\/II\/B","url":"\/2.2\/II\/B\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12750,"edition_id":1,"name":"Administration of State Government","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12749,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":176253,"object_type":"structure","relational_id":12750,"identifier":"II","token":"2.2\/II","url":"\/2.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12749,"edition_id":1,"name":"Administration of Government","identifier":"2.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":171453,"object_type":"structure","relational_id":12749,"identifier":"2.2","token":"2.2","url":"\/2.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":60713,"structure_id":12805,"section_number":"2.2-4303","catch_line":"Methods of procurement","url":"\/2.2-4303\/","token":"2.2\/II\/B\/43\/2\/2.2-4303","metadata":false},{"id":61675,"structure_id":12805,"section_number":"2.2-4303.01","catch_line":"High-risk contracts; definition; review","url":"\/2.2-4303.01\/","token":"2.2\/II\/B\/43\/2\/2.2-4303.01","metadata":false},{"id":63722,"structure_id":12805,"section_number":"2.2-4303.1","catch_line":"Architectural and professional engineering term contracting; limitations","url":"\/2.2-4303.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4303.1","metadata":false},{"id":54690,"structure_id":12805,"section_number":"2.2-4303.2","catch_line":"Job order contracting; limitations","url":"\/2.2-4303.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4303.2","metadata":false},{"id":60269,"structure_id":12805,"section_number":"2.2-4304","catch_line":"Joint and cooperative procurement","url":"\/2.2-4304\/","token":"2.2\/II\/B\/43\/2\/2.2-4304","metadata":false},{"id":67205,"structure_id":12805,"section_number":"2.2-4305","catch_line":"Competitive procurement by localities on state-aid projects","url":"\/2.2-4305\/","token":"2.2\/II\/B\/43\/2\/2.2-4305","metadata":false},{"id":85651,"structure_id":12805,"section_number":"2.2-4306","catch_line":"Repealed","url":"\/2.2-4306\/","token":"2.2\/II\/B\/43\/2\/2.2-4306","metadata":false},{"id":80442,"structure_id":12805,"section_number":"2.2-4308.1","catch_line":"Purchase of owner-controlled insurance in construction projects","url":"\/2.2-4308.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4308.1","metadata":false},{"id":77240,"structure_id":12805,"section_number":"2.2-4308.2","catch_line":"Registration and use of federal employment eligibility verification program required; debarment","url":"\/2.2-4308.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4308.2","metadata":false},{"id":76051,"structure_id":12805,"section_number":"2.2-4309","catch_line":"Modification of the contract","url":"\/2.2-4309\/","token":"2.2\/II\/B\/43\/2\/2.2-4309","metadata":false},{"id":59798,"structure_id":12805,"section_number":"2.2-4310","catch_line":"Discrimination prohibited; participation of small, women-owned, minority-owned, military family-owned, and service disabled veteran-owned businesses and employment services organizations","url":"\/2.2-4310\/","token":"2.2\/II\/B\/43\/2\/2.2-4310","metadata":false},{"id":83482,"structure_id":12805,"section_number":"2.2-4310.1","catch_line":"Awards as a result of any authorized enhancement or remedial measure; requirements","url":"\/2.2-4310.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4310.1","metadata":false},{"id":70958,"structure_id":12805,"section_number":"2.2-4310.2","catch_line":"Executive branch agency's goals for participation by small businesses; requirements","url":"\/2.2-4310.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4310.2","metadata":false},{"id":77101,"structure_id":12805,"section_number":"2.2-4310.3","catch_line":"Fiscal data pertaining to certain enhancement or remedial measures","url":"\/2.2-4310.3\/","token":"2.2\/II\/B\/43\/2\/2.2-4310.3","metadata":false},{"id":62578,"structure_id":12805,"section_number":"2.2-4311","catch_line":"Employment discrimination by contractor prohibited; required contract provisions","url":"\/2.2-4311\/","token":"2.2\/II\/B\/43\/2\/2.2-4311","metadata":false},{"id":67743,"structure_id":12805,"section_number":"2.2-4311.1","catch_line":"Compliance with federal, state, and local laws and federal immigration law; required contract provisions","url":"\/2.2-4311.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4311.1","metadata":false},{"id":82121,"structure_id":12805,"section_number":"2.2-4311.2","catch_line":"Compliance with state law; foreign and domestic businesses authorized to transact business in the Commonwealth","url":"\/2.2-4311.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4311.2","metadata":false},{"id":70336,"structure_id":12805,"section_number":"2.2-4311.3","catch_line":"Compliance with state law; contract terms inconsistent with state law","url":"\/2.2-4311.3\/","token":"2.2\/II\/B\/43\/2\/2.2-4311.3","metadata":false},{"id":62129,"structure_id":12805,"section_number":"2.2-4311.4","catch_line":"Procurement of imported goods; forced and indentured child labor prohibition","url":"\/2.2-4311.4\/","token":"2.2\/II\/B\/43\/2\/2.2-4311.4","metadata":false},{"id":79415,"structure_id":12805,"section_number":"2.2-4312","catch_line":"Drug-free workplace to be maintained by contractor; required contract provisions","url":"\/2.2-4312\/","token":"2.2\/II\/B\/43\/2\/2.2-4312","metadata":false},{"id":75321,"structure_id":12805,"section_number":"2.2-4313","catch_line":"Petition for recycled goods and products; periodic review of procurement standards","url":"\/2.2-4313\/","token":"2.2\/II\/B\/43\/2\/2.2-4313","metadata":false},{"id":87067,"structure_id":12805,"section_number":"2.2-4314","catch_line":"Petition for procurement of less toxic goods and products; periodic review of procurement standards","url":"\/2.2-4314\/","token":"2.2\/II\/B\/43\/2\/2.2-4314","metadata":false},{"id":58266,"structure_id":12805,"section_number":"2.2-4315","catch_line":"Use of brand names","url":"\/2.2-4315\/","token":"2.2\/II\/B\/43\/2\/2.2-4315","metadata":false},{"id":59468,"structure_id":12805,"section_number":"2.2-4316","catch_line":"Comments concerning specifications","url":"\/2.2-4316\/","token":"2.2\/II\/B\/43\/2\/2.2-4316","metadata":false},{"id":84046,"structure_id":12805,"section_number":"2.2-4317","catch_line":"Prequalification generally; prequalification for construction","url":"\/2.2-4317\/","token":"2.2\/II\/B\/43\/2\/2.2-4317","metadata":false},{"id":64926,"structure_id":12805,"section_number":"2.2-4318","catch_line":"Negotiation with lowest responsible bidder","url":"\/2.2-4318\/","token":"2.2\/II\/B\/43\/2\/2.2-4318","metadata":false},{"id":64505,"structure_id":12805,"section_number":"2.2-4319","catch_line":"Cancellation, rejection of bids; waiver of informalities","url":"\/2.2-4319\/","token":"2.2\/II\/B\/43\/2\/2.2-4319","metadata":false},{"id":76824,"structure_id":12805,"section_number":"2.2-4320","catch_line":"Exclusion of insurance bids prohibited","url":"\/2.2-4320\/","token":"2.2\/II\/B\/43\/2\/2.2-4320","metadata":false},{"id":59483,"structure_id":12805,"section_number":"2.2-4321","catch_line":"Debarment","url":"\/2.2-4321\/","token":"2.2\/II\/B\/43\/2\/2.2-4321","metadata":false},{"id":62909,"structure_id":12805,"section_number":"2.2-4321.1","catch_line":"Prohibited contracts; exceptions; determination by Department of Taxation; appeal; remedies","url":"\/2.2-4321.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4321.1","metadata":false},{"id":74446,"structure_id":12805,"section_number":"2.2-4321.2","catch_line":"Public works contracts; project labor agreements authorized","url":"\/2.2-4321.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4321.2","metadata":false},{"id":56761,"structure_id":12805,"section_number":"2.2-4321.3","catch_line":"Payment of prevailing wage for work performed on public works contracts; penalty","url":"\/2.2-4321.3\/","token":"2.2\/II\/B\/43\/2\/2.2-4321.3","metadata":false},{"id":79921,"structure_id":12805,"section_number":"2.2-4322","catch_line":"Acceptance of bids submitted to the Department of Transportation","url":"\/2.2-4322\/","token":"2.2\/II\/B\/43\/2\/2.2-4322","metadata":false},{"id":86146,"structure_id":12805,"section_number":"2.2-4323","catch_line":"Purchase programs for recycled goods; agency responsibilities","url":"\/2.2-4323\/","token":"2.2\/II\/B\/43\/2\/2.2-4323","metadata":false},{"id":66033,"structure_id":12805,"section_number":"2.2-4323.1","catch_line":"Purchase of flags of the United States and the Commonwealth by public bodies","url":"\/2.2-4323.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4323.1","metadata":false},{"id":60604,"structure_id":12805,"section_number":"2.2-4324","catch_line":"(Effective July 1, 2027) Preference for Virginia products with recycled content and for Virginia firms","url":"\/2.2-4324\/","token":"2.2\/II\/B\/43\/2\/2.2-4324","metadata":false},{"id":76844,"structure_id":12805,"section_number":"2.2-4325","catch_line":"Preference for Virginia coal used in state facilities","url":"\/2.2-4325\/","token":"2.2\/II\/B\/43\/2\/2.2-4325","metadata":false},{"id":75140,"structure_id":12805,"section_number":"2.2-4326","catch_line":"Preference for recycled paper and paper products used by state agencies","url":"\/2.2-4326\/","token":"2.2\/II\/B\/43\/2\/2.2-4326","metadata":false},{"id":82739,"structure_id":12805,"section_number":"2.2-4327","catch_line":"Preference for community reinvestment activities in contracts for investment of funds","url":"\/2.2-4327\/","token":"2.2\/II\/B\/43\/2\/2.2-4327","metadata":false},{"id":62013,"structure_id":12805,"section_number":"2.2-4328","catch_line":"Preference for local products and firms; applicability","url":"\/2.2-4328\/","token":"2.2\/II\/B\/43\/2\/2.2-4328","metadata":false},{"id":73628,"structure_id":12805,"section_number":"2.2-4328.1","catch_line":"Preference for energy-efficient and water-efficient goods","url":"\/2.2-4328.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4328.1","metadata":false},{"id":63397,"structure_id":12805,"section_number":"2.2-4328.2","catch_line":"Purchase of personal protective equipment by state agencies","url":"\/2.2-4328.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4328.2","metadata":false},{"id":81072,"structure_id":12805,"section_number":"2.2-4328.3","catch_line":"Solar photovoltaic equipment and facilities","url":"\/2.2-4328.3\/","token":"2.2\/II\/B\/43\/2\/2.2-4328.3","metadata":false},{"id":64067,"structure_id":12805,"section_number":"2.2-4329","catch_line":"Expired","url":"\/2.2-4329\/","token":"2.2\/II\/B\/43\/2\/2.2-4329","metadata":false},{"id":72432,"structure_id":12805,"section_number":"2.2-4329.1","catch_line":"Energy forward pricing mechanisms","url":"\/2.2-4329.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4329.1","metadata":false},{"id":73315,"structure_id":12805,"section_number":"2.2-4330","catch_line":"Withdrawal of bid due to error","url":"\/2.2-4330\/","token":"2.2\/II\/B\/43\/2\/2.2-4330","metadata":false},{"id":66024,"structure_id":12805,"section_number":"2.2-4331","catch_line":"Contract pricing arrangements","url":"\/2.2-4331\/","token":"2.2\/II\/B\/43\/2\/2.2-4331","metadata":false},{"id":86314,"structure_id":12805,"section_number":"2.2-4332","catch_line":"Workers' compensation requirements for construction contractors and subcontractors","url":"\/2.2-4332\/","token":"2.2\/II\/B\/43\/2\/2.2-4332","metadata":false},{"id":53971,"structure_id":12805,"section_number":"2.2-4333","catch_line":"Retainage on construction contracts","url":"\/2.2-4333\/","token":"2.2\/II\/B\/43\/2\/2.2-4333","metadata":false},{"id":68826,"structure_id":12805,"section_number":"2.2-4334","catch_line":"Deposit of certain retained funds on certain contracts with local governments; penalty for failure to timely complete","url":"\/2.2-4334\/","token":"2.2\/II\/B\/43\/2\/2.2-4334","metadata":false},{"id":84415,"structure_id":12805,"section_number":"2.2-4335","catch_line":"Public construction contract provisions barring damages for unreasonable delays declared void","url":"\/2.2-4335\/","token":"2.2\/II\/B\/43\/2\/2.2-4335","metadata":false},{"id":55647,"structure_id":12805,"section_number":"2.2-4336","catch_line":"Bid bonds; construction contracts","url":"\/2.2-4336\/","token":"2.2\/II\/B\/43\/2\/2.2-4336","metadata":false},{"id":79610,"structure_id":12805,"section_number":"2.2-4337","catch_line":"Performance and payment bonds","url":"\/2.2-4337\/","token":"2.2\/II\/B\/43\/2\/2.2-4337","metadata":false},{"id":86516,"structure_id":12805,"section_number":"2.2-4338","catch_line":"Alternative forms of security","url":"\/2.2-4338\/","token":"2.2\/II\/B\/43\/2\/2.2-4338","metadata":false},{"id":66839,"structure_id":12805,"section_number":"2.2-4339","catch_line":"Bonds on other than construction contracts","url":"\/2.2-4339\/","token":"2.2\/II\/B\/43\/2\/2.2-4339","metadata":false},{"id":54251,"structure_id":12805,"section_number":"2.2-4340","catch_line":"Action on performance bond","url":"\/2.2-4340\/","token":"2.2\/II\/B\/43\/2\/2.2-4340","metadata":false},{"id":65780,"structure_id":12805,"section_number":"2.2-4340.1","catch_line":"Statute of limitations on construction contracts","url":"\/2.2-4340.1\/","token":"2.2\/II\/B\/43\/2\/2.2-4340.1","metadata":false},{"id":85767,"structure_id":12805,"section_number":"2.2-4340.2","catch_line":"Statute of limitations on architectural and engineering contracts","url":"\/2.2-4340.2\/","token":"2.2\/II\/B\/43\/2\/2.2-4340.2","metadata":false},{"id":56940,"structure_id":12805,"section_number":"2.2-4341","catch_line":"Actions on payment bonds; waiver of right to sue","url":"\/2.2-4341\/","token":"2.2\/II\/B\/43\/2\/2.2-4341","metadata":false},{"id":71233,"structure_id":12805,"section_number":"2.2-4342","catch_line":"Public inspection of certain records","url":"\/2.2-4342\/","token":"2.2\/II\/B\/43\/2\/2.2-4342","metadata":false}],"previous_section":{"id":68826,"structure_id":12805,"section_number":"2.2-4334","catch_line":"Deposit of certain retained funds on certain contracts with local governments; penalty for failure to timely complete","url":"\/2.2-4334\/","token":"2.2\/II\/B\/43\/2\/2.2-4334","metadata":false},"next_section":{"id":55647,"structure_id":12805,"section_number":"2.2-4336","catch_line":"Bid bonds; construction contracts","url":"\/2.2-4336\/","token":"2.2\/II\/B\/43\/2\/2.2-4336","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/2.2-4335\/","history_text":"<p>This law was first created in 1991. The record of its establishment is cataloged in chapter 701 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1991 \u201cActs\u201d aren\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2001, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?011+ful+CHAP0324\">324<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?011+ful+CHAP0844\">844<\/a>.<\/p>","references":false,"refers_to":false,"permalink":{"id":177215,"object_type":"law","relational_id":84415,"identifier":"2.2-4335","token":"2.2\/II\/B\/43\/2\/2.2-4335","url":"\/2.2-4335\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/2.2-4335\/","token":"2.2\/II\/B\/43\/2\/2.2-4335","dublin_core":{"Title":"Public construction contract provisions barring damages for unreasonable delays declared void","Type":"Text","Format":"text\/html","Identifier":"\u00a7 2.2-4335","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Any provision contained in any public <span class=\"dictionary\">construction<\/span> <span class=\"dictionary\">contract<\/span> that purports to <span class=\"dictionary\">waive<\/span>, release, or extinguish the rights of a contractor to recover costs or <span class=\"dictionary\">damages<\/span> for unreasonable delay in performing such <span class=\"dictionary\">contract<\/span>, either on his behalf or on behalf of his subcontractor if and to the extent the delay is caused by acts or omissions of the <span class=\"dictionary\">public body<\/span>, its agents or employees and due to causes within their control shall be void and unenforceable as against public policy. <a id=\"paragraph-302581\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Subsection A shall not be construed to render void any provision of a public <span class=\"dictionary\">construction<\/span> <span class=\"dictionary\">contract<\/span> that: <a id=\"paragraph-302582\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Allows a <span class=\"dictionary\">public body<\/span> to recover that portion of delay costs caused by the acts or omissions of the contractor, or its subcontractors, agents or employees; <a id=\"paragraph-302583\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> Requires notice of any delay by the <span class=\"dictionary\">party<\/span> claiming the delay; <a id=\"paragraph-302584\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Provides for liquidated <span class=\"dictionary\">damages<\/span> for delay; or <a id=\"paragraph-302585\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> Provides for arbitration or any other procedure designed to settle <span class=\"dictionary\">contract<\/span> disputes. <a id=\"paragraph-302586\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#B4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> A contractor making a claim against a <span class=\"dictionary\">public body<\/span> for costs or <span class=\"dictionary\">damages<\/span> due to the alleged delaying of the contractor in the performance of its work under any public <span class=\"dictionary\">construction<\/span> <span class=\"dictionary\">contract<\/span> shall be liable to the <span class=\"dictionary\">public body<\/span> and shall pay it for a percentage of all costs incurred by the <span class=\"dictionary\">public body<\/span> in investigating, analyzing, negotiating, litigating and arbitrating the claim, which percentage shall be equal to the percentage of the contractor&#8217;s total delay claim that is determined through <span class=\"dictionary\">litigation<\/span> or arbitration to be false or to have no basis in <span class=\"dictionary\">law<\/span> or in <span class=\"dictionary\">fact<\/span>. <a id=\"paragraph-302587\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> A <span class=\"dictionary\">public body<\/span> denying a contractor&#8217;s claim for costs or <span class=\"dictionary\">damages<\/span> due to the alleged delaying of the contractor in the performance of work under any public <span class=\"dictionary\">construction<\/span> <span class=\"dictionary\">contract<\/span> shall be liable to and shall pay such contractor a percentage of all costs incurred by the contractor to investigate, analyze, negotiate, litigate and arbitrate the claim. The percentage paid by the <span class=\"dictionary\">public body<\/span> shall be equal to the percentage of the contractor&#8217;s total delay claim for which the <span class=\"dictionary\">public body<\/span>&#8217;s denial is determined through <span class=\"dictionary\">litigation<\/span> or arbitration to have been made in bad faith. <a id=\"paragraph-302588\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4335\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nPUBLIC CONSTRUCTION CONTRACT PROVISIONS BARRING DAMAGES FOR UNREASONABLE DELAYS\nDECLARED VOID (\u00a7 2.2-4335)\n\nA. Any provision contained in any public construction contract that purports to\nwaive, release, or extinguish the rights of a contractor to recover costs or\ndamages for unreasonable delay in performing such contract, either on his behalf\nor on behalf of his subcontractor if and to the extent the delay is caused by\nacts or omissions of the public body, its agents or employees and due to causes\nwithin their control shall be void and unenforceable as against public policy.\n\nB. Subsection A shall not be construed to render void any provision of a public\nconstruction contract that:\n\n   1. Allows a public body to recover that portion of delay costs caused by the\n   acts or omissions of the contractor, or its subcontractors, agents or\n   employees;\n\n   2. Requires notice of any delay by the party claiming the delay;\n\n   3. Provides for liquidated damages for delay; or\n\n   4. Provides for arbitration or any other procedure designed to settle contract\n   disputes.\n\nC. A contractor making a claim against a public body for costs or damages due to\nthe alleged delaying of the contractor in the performance of its work under any\npublic construction contract shall be liable to the public body and shall pay it\nfor a percentage of all costs incurred by the public body in investigating,\nanalyzing, negotiating, litigating and arbitrating the claim, which percentage\nshall be equal to the percentage of the contractor&#8217;s total delay claim\nthat is determined through litigation or arbitration to be false or to have no\nbasis in law or in fact.\n\nD. A public body denying a contractor&#8217;s claim for costs or damages due to\nthe alleged delaying of the contractor in the performance of work under any\npublic construction contract shall be liable to and shall pay such contractor a\npercentage of all costs incurred by the contractor to investigate, analyze,\nnegotiate, litigate and arbitrate the claim. The percentage paid by the public\nbody shall be equal to the percentage of the contractor&#8217;s total delay\nclaim for which the public body&#8217;s denial is determined through litigation\nor arbitration to have been made in bad faith.\n\nHISTORY: 1991, c. 701, \u00a7 11-56.2; 2001, cc. 324, 844.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}