{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/2.2-4383.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/2.2-4383.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/2.2-4383.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/2.2-4383.html"}],"law_id":74904,"edition_id":1,"section_id":74904,"structure_id":16687,"section_number":"2.2-4383","catch_line":"Reporting requirements","history":"2017, cc. 699, 704; 2024, cc. 469, 490.","full_text":"A\n\nThe Department shall report by December 1 of each year to the Governor and the Chairmen of the House Committee on Appropriations, the House Committee on General Laws, the Senate Committee on Finance and Appropriations, and the Senate Committee on General Laws and Technology the following information: (i) the number of projects reviewed pursuant to Articles 2 (&#xA7; 2.2-4380) and 3 (&#xA7; 2.2-4381) and (ii) for each project (a) the identity of the state public body or covered institution and a description of each such project, (b) the estimated cost of the project at the time of the Department&#8217;s review, (c) the decision made by the Department concerning the proposed procurement method, (d) if such project was a construction management or design-build project, the qualifications that made such project complex, and (e) the final procurement method used by the state public body or covered institution.B\n\nAll public bodies subject to the provisions of this chapter shall report no later than November 1 of each year to the Director of the Department on all completed capital projects in excess of $2 million, which report shall include at a minimum (i) the procurement method utilized, (ii) the project budget, (iii) the actual project cost, (iv) the expected timeline, (v) the actual completion time, (vi) if such project was a construction management or design-build project, the qualifications that made the project complex, and (vii) any post-project issues.\n\t\t\tThe Department shall consolidate received report data and submit the consolidated data to the Governor and Chairmen of the House Committee on Appropriations and the Senate Committee on Finance and Appropriations by December 1 of each year.","order_by":null,"text":{"0":{"id":269085,"text":"The Department shall report by December 1 of each year to the Governor and the Chairmen of the House Committee on Appropriations, the House Committee on General Laws, the Senate Committee on Finance and Appropriations, and the Senate Committee on General Laws and Technology the following information: (i) the number of projects reviewed pursuant to Articles 2 (&#xA7; 2.2-4380) and 3 (&#xA7; 2.2-4381) and (ii) for each project (a) the identity of the state public body or covered institution and a description of each such project, (b) the estimated cost of the project at the time of the Department&#8217;s review, (c) the decision made by the Department concerning the proposed procurement method, (d) if such project was a construction management or design-build project, the qualifications that made such project complex, and (e) the final procurement method used by the state public body or covered institution.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":269086,"text":"All public bodies subject to the provisions of this chapter shall report no later than November 1 of each year to the Director of the Department on all completed capital projects in excess of $2 million, which report shall include at a minimum (i) the procurement method utilized, (ii) the project budget, (iii) the actual project cost, (iv) the expected timeline, (v) the actual completion time, (vi) if such project was a construction management or design-build project, the qualifications that made the project complex, and (vii) any post-project issues.\n\t\t\tThe Department shall consolidate received report data and submit the consolidated data to the Governor and Chairmen of the House Committee on Appropriations and the Senate Committee on Finance and Appropriations by December 1 of each year.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A"}},"ancestry":[{"id":16687,"edition_id":1,"name":"Reporting Requirements for All Public Bodies","identifier":"5","label":"article","depth":5,"order_by":1,"parent_id":15809,"metadata":{},"date_created":"2026-06-26 04:33:00","date_modified":"2026-06-26 04:33:00","permalink":{"id":177449,"object_type":"structure","relational_id":16687,"identifier":"5","token":"2.2\/II\/B\/43.1\/5","url":"\/2.2\/II\/B\/43.1\/5\/","edition_id":1,"permalink":0,"preferred":1}},{"id":15809,"edition_id":1,"name":"Construction Management and Design-Build Contracting","identifier":"43.1","label":"chapter","depth":4,"order_by":1,"parent_id":12751,"metadata":{},"date_created":"2026-06-26 03:59:53","date_modified":"2026-06-26 03:59:53","permalink":{"id":177419,"object_type":"structure","relational_id":15809,"identifier":"43.1","token":"2.2\/II\/B\/43.1","url":"\/2.2\/II\/B\/43.1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12751,"edition_id":1,"name":"Transaction of Public Business","identifier":"B","label":"part","depth":3,"order_by":1,"parent_id":12750,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":176445,"object_type":"structure","relational_id":12751,"identifier":"B","token":"2.2\/II\/B","url":"\/2.2\/II\/B\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12750,"edition_id":1,"name":"Administration of State Government","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12749,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":176253,"object_type":"structure","relational_id":12750,"identifier":"II","token":"2.2\/II","url":"\/2.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12749,"edition_id":1,"name":"Administration of Government","identifier":"2.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:51","date_modified":"2026-06-26 03:43:51","permalink":{"id":171453,"object_type":"structure","relational_id":12749,"identifier":"2.2","token":"2.2","url":"\/2.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":74904,"structure_id":16687,"section_number":"2.2-4383","catch_line":"Reporting requirements","url":"\/2.2-4383\/","token":"2.2\/II\/B\/43.1\/5\/2.2-4383","metadata":false}],"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/2.2-4383\/","history_text":"<p>This law was first created in 2017. The record of its establishment is cataloged in chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?171+ful+CHAP0699\">699<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?171+ful+CHAP0704\">704<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2024, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?241+ful+CHAP0469\">469<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?241+ful+CHAP0490\">490<\/a>.<\/p>","references":false,"refers_to":[{"id":83894,"section_number":"2.2-4380","catch_line":"Construction management or design-build contracts for state public bodies authorized","order_by":null,"url":"\/2.2-4380\/"},{"id":62351,"section_number":"2.2-4381","catch_line":"Construction management or design-build contracts for covered institutions authorized","order_by":null,"url":"\/2.2-4381\/"}],"permalink":{"id":177451,"object_type":"law","relational_id":74904,"identifier":"2.2-4383","token":"2.2\/II\/B\/43.1\/5\/2.2-4383","url":"\/2.2-4383\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/2.2-4383\/","token":"2.2\/II\/B\/43.1\/5\/2.2-4383","dublin_core":{"Title":"Reporting requirements","Type":"Text","Format":"text\/html","Identifier":"\u00a7 2.2-4383","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The <span class=\"dictionary\">Department<\/span> shall report by December 1 of each year to the Governor and the Chairmen of the House Committee on Appropriations, the House Committee on General <span class=\"dictionary\">Laws<\/span>, the Senate Committee on Finance and Appropriations, and the Senate Committee on General <span class=\"dictionary\">Laws<\/span> and Technology the following information: (i) the number of projects reviewed pursuant to Articles 2 (&#xA7; <a class=\"law\" title=\"Construction management or design-build contracts for state public bodies authorized\" href=\"\/2.2-4380\/\">2.2-4380<\/a>) and 3 (&#xA7; <a class=\"law\" title=\"Construction management or design-build contracts for covered institutions authorized\" href=\"\/2.2-4381\/\">2.2-4381<\/a>) and (ii) for each project (a) the identity of the <span class=\"dictionary\">state public body<\/span> or <span class=\"dictionary\">covered institution<\/span> and a description of each such project, (b) the estimated cost of the project at the time of the <span class=\"dictionary\">Department<\/span>&#8217;s review, (c) the decision made by the <span class=\"dictionary\">Department<\/span> concerning the proposed procurement method, (d) if such project was a construction management or design-build project, the qualifications that made such project complex, and (e) the final procurement method used by the <span class=\"dictionary\">state public body<\/span> or <span class=\"dictionary\">covered institution<\/span>. <a id=\"paragraph-269085\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4383\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> All public bodies subject to the provisions of this chapter shall report no later than November 1 of each year to the Director of the <span class=\"dictionary\">Department<\/span> on all completed capital projects in excess of $2 million, which report shall include at a minimum (i) the procurement method utilized, (ii) the project budget, (iii) the actual project cost, (iv) the expected timeline, (v) the actual completion time, (vi) if such project was a construction management or design-build project, the qualifications that made the project complex, and (vii) any post-project <span class=\"dictionary\">issues<\/span>.\n\t\t\tThe <span class=\"dictionary\">Department<\/span> shall consolidate received report data and submit the consolidated data to the Governor and Chairmen of the House Committee on Appropriations and the Senate Committee on Finance and Appropriations by December 1 of each year. <a id=\"paragraph-269086\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/2.2-4383\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nREPORTING REQUIREMENTS (\u00a7 2.2-4383)\n\nA. The Department shall report by December 1 of each year to the Governor and\nthe Chairmen of the House Committee on Appropriations, the House Committee on\nGeneral Laws, the Senate Committee on Finance and Appropriations, and the Senate\nCommittee on General Laws and Technology the following information: (i) the\nnumber of projects reviewed pursuant to Articles 2 (&#xA7; 2.2-4380) and 3\n(&#xA7; 2.2-4381) and (ii) for each project (a) the identity of the state public\nbody or covered institution and a description of each such project, (b) the\nestimated cost of the project at the time of the Department&#8217;s review, (c)\nthe decision made by the Department concerning the proposed procurement method,\n(d) if such project was a construction management or design-build project, the\nqualifications that made such project complex, and (e) the final procurement\nmethod used by the state public body or covered institution.\n\nB. All public bodies subject to the provisions of this chapter shall report no\nlater than November 1 of each year to the Director of the Department on all\ncompleted capital projects in excess of $2 million, which report shall include\nat a minimum (i) the procurement method utilized, (ii) the project budget, (iii)\nthe actual project cost, (iv) the expected timeline, (v) the actual completion\ntime, (vi) if such project was a construction management or design-build\nproject, the qualifications that made the project complex, and (vii) any\npost-project issues.\n\t\t\tThe Department shall consolidate received report data and submit the\nconsolidated data to the Governor and Chairmen of the House Committee on\nAppropriations and the Senate Committee on Finance and Appropriations by\nDecember 1 of each year.\n\nHISTORY: 2017, cc. 699, 704; 2024, cc. 469, 490.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}