{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/28.2-108.2.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/28.2-108.2.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/28.2-108.2.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/28.2-108.2.html"}],"law_id":55455,"edition_id":1,"section_id":55455,"structure_id":14231,"section_number":"28.2-108.2","catch_line":"Virginia Waterway Maintenance Grant Program","history":"2025, c. 78.","full_text":"A\n\nOnce each fiscal year, the Commission shall award a grant of funds to a qualified applicant or applicants to support a dredging project or projects that have been approved by the Commission. The source of the grant funds shall be the Virginia Waterway Maintenance Fund continued pursuant to &#xA7; 28.2-108.1. Applicants shall be limited to political subdivisions and the governing bodies of Virginia localities.B\n\nThe Commission shall develop guidelines establishing an application process, procedures for evaluating the feasibility of a proposed dredging project, and procedures for awarding grants. The guidelines and procedures shall be exempt from the Administrative Process Act (\u00a7 2.2-4000 et seq.). The guidelines and procedures shall provide that:1\n\nThe Commission shall evaluate each application to determine its completeness, the sufficiency of its justification for the proposed project, the status of any necessary permits, the adequacy of its project management organization, and the potential beneficial use of dredged materials for the purpose of mitigation of coastal erosion, flooding, or other purposes for the common good.2\n\nThe Commission shall not require any level of matching contributions from the applicant.3\n\nNo award of a grant shall support any dredging project for a solely privately owned marina or dock. However, the Commission may award a grant to a political subdivision or governing body for the dredging of a waterway channel with a bottom that is privately owned if such political subdivision or governing body holds a lease of such bottom with a term of 25 years or more.4\n\nPrior to receipt of a grant, the applicant shall enter into a memorandum of understanding with the Commission establishing the requirements for the use of the grant funds.C\n\nProjects for which the Commission may award grant funding include (i) feasibility and cost evaluations, pre-project engineering studies, and project permitting and contracting costs for a waterway project conducted by the Commonwealth; (ii) the state portion of a nonfederal sponsor funding requirement for a federal project, which may include the beneficial use of dredged materials that are not covered by federal funding; (iii) the Commonwealth&#8217;s maintenance of shallow-draft navigable waterway channel maintenance dredging and the construction and management of areas for the placement of dredged material; and (iv) the beneficial use, for environmental restoration and the mitigation of coastal erosion or flooding, of dredged materials from waterway projects conducted by the Commonwealth.","order_by":null,"text":{"0":{"id":203272,"text":"Once each fiscal year, the Commission shall award a grant of funds to a qualified applicant or applicants to support a dredging project or projects that have been approved by the Commission. The source of the grant funds shall be the Virginia Waterway Maintenance Fund continued pursuant to &#xA7; 28.2-108.1. Applicants shall be limited to political subdivisions and the governing bodies of Virginia localities.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":203273,"text":"The Commission shall develop guidelines establishing an application process, procedures for evaluating the feasibility of a proposed dredging project, and procedures for awarding grants. The guidelines and procedures shall be exempt from the Administrative Process Act (\u00a7 2.2-4000 et seq.). The guidelines and procedures shall provide that:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"B1"},"2":{"id":203274,"text":"The Commission shall evaluate each application to determine its completeness, the sufficiency of its justification for the proposed project, the status of any necessary permits, the adequacy of its project management organization, and the potential beneficial use of dredged materials for the purpose of mitigation of coastal erosion, flooding, or other purposes for the common good.","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"3":{"id":203275,"text":"The Commission shall not require any level of matching contributions from the applicant.","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"4":{"id":203276,"text":"No award of a grant shall support any dredging project for a solely privately owned marina or dock. However, the Commission may award a grant to a political subdivision or governing body for the dredging of a waterway channel with a bottom that is privately owned if such political subdivision or governing body holds a lease of such bottom with a term of 25 years or more.","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"B4"},"5":{"id":203277,"text":"Prior to receipt of a grant, the applicant shall enter into a memorandum of understanding with the Commission establishing the requirements for the use of the grant funds.","type":"section","prefixes":["B","4"],"prefix":"4","entire_prefix":"B4","prefix_anchor":"B4","level":2,"prior_prefix":"B3","next_prefix":"C"},"6":{"id":203278,"text":"Projects for which the Commission may award grant funding include (i) feasibility and cost evaluations, pre-project engineering studies, and project permitting and contracting costs for a waterway project conducted by the Commonwealth; (ii) the state portion of a nonfederal sponsor funding requirement for a federal project, which may include the beneficial use of dredged materials that are not covered by federal funding; (iii) the Commonwealth&#8217;s maintenance of shallow-draft navigable waterway channel maintenance dredging and the construction and management of areas for the placement of dredged material; and (iv) the beneficial use, for environmental restoration and the mitigation of coastal erosion or flooding, of dredged materials from waterway projects conducted by the Commonwealth.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B4"}},"ancestry":[{"id":14231,"edition_id":1,"name":"Support Activities","identifier":"2","label":"article","depth":4,"order_by":1,"parent_id":12820,"metadata":{},"date_created":"2026-06-26 03:47:23","date_modified":"2026-06-26 03:47:23","permalink":{"id":190629,"object_type":"structure","relational_id":14231,"identifier":"2","token":"28.2\/I\/1\/2","url":"\/28.2\/I\/1\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12820,"edition_id":1,"name":"Administration","identifier":"1","label":"chapter","depth":3,"order_by":1,"parent_id":12819,"metadata":{},"date_created":"2026-06-26 03:43:54","date_modified":"2026-06-26 03:43:54","permalink":{"id":190593,"object_type":"structure","relational_id":12820,"identifier":"1","token":"28.2\/I\/1","url":"\/28.2\/I\/1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12819,"edition_id":1,"name":"General Provisions Relating to Marine Resources Commission","identifier":"I","label":"subtitle","depth":2,"order_by":1,"parent_id":12813,"metadata":{},"date_created":"2026-06-26 03:43:54","date_modified":"2026-06-26 03:43:54","permalink":{"id":190591,"object_type":"structure","relational_id":12819,"identifier":"I","token":"28.2\/I","url":"\/28.2\/I\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12813,"edition_id":1,"name":"Fisheries and Habitat of the Tidal Waters","identifier":"28.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:54","date_modified":"2026-06-26 03:43:54","permalink":{"id":190589,"object_type":"structure","relational_id":12813,"identifier":"28.2","token":"28.2","url":"\/28.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":79876,"structure_id":14231,"section_number":"28.2-106","catch_line":"Virginia Marine Police; law-enforcement responsibilities; qualifications; oath","url":"\/28.2-106\/","token":"28.2\/I\/1\/2\/28.2-106","metadata":false},{"id":72614,"structure_id":14231,"section_number":"28.2-106.1","catch_line":"Patrol and enforcement of federal safety zones and restricted areas","url":"\/28.2-106.1\/","token":"28.2\/I\/1\/2\/28.2-106.1","metadata":false},{"id":75953,"structure_id":14231,"section_number":"28.2-106.2","catch_line":"Establishment, patrol, and enforcement of state water safety zones and restricted areas; penalty","url":"\/28.2-106.2\/","token":"28.2\/I\/1\/2\/28.2-106.2","metadata":false},{"id":62540,"structure_id":14231,"section_number":"28.2-107","catch_line":"Commission to implement radio system","url":"\/28.2-107\/","token":"28.2\/I\/1\/2\/28.2-107","metadata":false},{"id":78925,"structure_id":14231,"section_number":"28.2-108","catch_line":"Marine Patrols Fund continued","url":"\/28.2-108\/","token":"28.2\/I\/1\/2\/28.2-108","metadata":false},{"id":65360,"structure_id":14231,"section_number":"28.2-108.1","catch_line":"Virginia Waterway Maintenance Fund continued","url":"\/28.2-108.1\/","token":"28.2\/I\/1\/2\/28.2-108.1","metadata":false},{"id":55455,"structure_id":14231,"section_number":"28.2-108.2","catch_line":"Virginia Waterway Maintenance Grant Program","url":"\/28.2-108.2\/","token":"28.2\/I\/1\/2\/28.2-108.2","metadata":false}],"previous_section":{"id":65360,"structure_id":14231,"section_number":"28.2-108.1","catch_line":"Virginia Waterway Maintenance Fund continued","url":"\/28.2-108.1\/","token":"28.2\/I\/1\/2\/28.2-108.1","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/28.2-108.2\/","history_text":"<p>This law was first created in 2025. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?251+ful+CHAP0078\">78<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":65360,"section_number":"28.2-108.1","catch_line":"Virginia Waterway Maintenance Fund continued","order_by":null,"url":"\/28.2-108.1\/"}],"refers_to":[{"id":86911,"section_number":"2.2-4000","catch_line":"Short title; purpose","order_by":null,"url":"\/2.2-4000\/"},{"id":65360,"section_number":"28.2-108.1","catch_line":"Virginia Waterway Maintenance Fund continued","order_by":null,"url":"\/28.2-108.1\/"}],"permalink":{"id":190655,"object_type":"law","relational_id":55455,"identifier":"28.2-108.2","token":"28.2\/I\/1\/2\/28.2-108.2","url":"\/28.2-108.2\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/28.2-108.2\/","token":"28.2\/I\/1\/2\/28.2-108.2","dublin_core":{"Title":"Virginia Waterway Maintenance Grant Program","Type":"Text","Format":"text\/html","Identifier":"\u00a7 28.2-108.2","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Once each fiscal year, the <span class=\"dictionary\">Commission<\/span> shall award a grant of funds to a qualified applicant or applicants to support a dredging project or projects that have been approved by the <span class=\"dictionary\">Commission<\/span>. The source of the grant funds shall be the Virginia Waterway Maintenance Fund continued pursuant to &#xA7; <a class=\"law\" title=\"Virginia Waterway Maintenance Fund continued\" href=\"\/28.2-108.1\/\">28.2-108.1<\/a>. Applicants shall be limited to political subdivisions and the governing bodies of Virginia localities. <a id=\"paragraph-203272\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The <span class=\"dictionary\">Commission<\/span> shall develop guidelines establishing an application process, procedures for evaluating the feasibility of a proposed dredging project, and procedures for awarding grants. The guidelines and procedures shall be exempt from the Administrative Process Act (\u00a7&nbsp;<a class=\"law\" title=\"Short title; purpose\" href=\"\/2.2-4000\/\">2.2-4000<\/a> et seq.). The guidelines and procedures shall provide that: <a id=\"paragraph-203273\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> The <span class=\"dictionary\">Commission<\/span> shall evaluate each application to determine its completeness, the sufficiency of its justification for the proposed project, the status of any necessary permits, the adequacy of its project management organization, and the potential beneficial use of dredged <span class=\"dictionary\">materials<\/span> for the purpose of mitigation of coastal erosion, flooding, or other purposes for the common good. <a id=\"paragraph-203274\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> The <span class=\"dictionary\">Commission<\/span> shall not require any level of matching contributions from the applicant. <a id=\"paragraph-203275\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> No award of a grant shall support any dredging project for a solely privately owned marina or dock. However, the <span class=\"dictionary\">Commission<\/span> may award a grant to a political subdivision or governing body for the dredging of a waterway channel with a bottom that is privately owned if such political subdivision or governing body holds a lease of such bottom with a term of 25 years or more. <a id=\"paragraph-203276\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> Prior to receipt of a grant, the applicant shall enter into a <span class=\"dictionary\">memorandum<\/span> of understanding with the <span class=\"dictionary\">Commission<\/span> establishing the requirements for the use of the grant funds. <a id=\"paragraph-203277\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#B4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> Projects for which the <span class=\"dictionary\">Commission<\/span> may award grant funding include (i) feasibility and cost evaluations, pre-project engineering studies, and project permitting and contracting costs for a waterway project conducted by the Commonwealth; (ii) the state portion of a nonfederal sponsor funding requirement for a federal project, which may include the beneficial use of dredged <span class=\"dictionary\">materials<\/span> that are not covered by federal funding; (iii) the Commonwealth&#8217;s maintenance of shallow-draft navigable waterway channel maintenance dredging and the construction and management of areas for the placement of dredged <span class=\"dictionary\">material<\/span>; and (iv) the beneficial use, for environmental restoration and the mitigation of coastal erosion or flooding, of dredged <span class=\"dictionary\">materials<\/span> from waterway projects conducted by the Commonwealth. <a id=\"paragraph-203278\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/28.2-108.2\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nVIRGINIA WATERWAY MAINTENANCE GRANT PROGRAM (\u00a7 28.2-108.2)\n\nA. Once each fiscal year, the Commission shall award a grant of funds to a\nqualified applicant or applicants to support a dredging project or projects that\nhave been approved by the Commission. The source of the grant funds shall be the\nVirginia Waterway Maintenance Fund continued pursuant to &#xA7; 28.2-108.1.\nApplicants shall be limited to political subdivisions and the governing bodies\nof Virginia localities.\n\nB. The Commission shall develop guidelines establishing an application process,\nprocedures for evaluating the feasibility of a proposed dredging project, and\nprocedures for awarding grants. The guidelines and procedures shall be exempt\nfrom the Administrative Process Act (\u00a7 2.2-4000 et seq.). The guidelines and\nprocedures shall provide that:\n\n   1. The Commission shall evaluate each application to determine its\n   completeness, the sufficiency of its justification for the proposed project,\n   the status of any necessary permits, the adequacy of its project management\n   organization, and the potential beneficial use of dredged materials for the\n   purpose of mitigation of coastal erosion, flooding, or other purposes for the\n   common good.\n\n   2. The Commission shall not require any level of matching contributions from\n   the applicant.\n\n   3. No award of a grant shall support any dredging project for a solely\n   privately owned marina or dock. However, the Commission may award a grant to a\n   political subdivision or governing body for the dredging of a waterway channel\n   with a bottom that is privately owned if such political subdivision or\n   governing body holds a lease of such bottom with a term of 25 years or more.\n\n   4. Prior to receipt of a grant, the applicant shall enter into a memorandum of\n   understanding with the Commission establishing the requirements for the use of\n   the grant funds.\n\nC. Projects for which the Commission may award grant funding include (i)\nfeasibility and cost evaluations, pre-project engineering studies, and project\npermitting and contracting costs for a waterway project conducted by the\nCommonwealth; (ii) the state portion of a nonfederal sponsor funding requirement\nfor a federal project, which may include the beneficial use of dredged materials\nthat are not covered by federal funding; (iii) the Commonwealth&#8217;s\nmaintenance of shallow-draft navigable waterway channel maintenance dredging and\nthe construction and management of areas for the placement of dredged material;\nand (iv) the beneficial use, for environmental restoration and the mitigation of\ncoastal erosion or flooding, of dredged materials from waterway projects\nconducted by the Commonwealth.\n\nHISTORY: 2025, c. 78.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}