{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/38.2-5504.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/38.2-5504.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/38.2-5504.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/38.2-5504.html"}],"law_id":86775,"edition_id":1,"section_id":86775,"structure_id":14894,"section_number":"38.2-5504","catch_line":"Regulatory Action Level Event","history":"1995, c. 789; 2000, c. 47.","full_text":"A\n\n&#8220;Regulatory Action Level Event&#8221; means, with respect to any licensee, any of the following events:1\n\nThe filing of an RBC Report by the licensee which indicates that the licensee&#8217;s Total Adjusted Capital is greater than or equal to its Authorized Control Level RBC but less than its Regulatory Action Level RBC;2\n\nThe notification by the Commission to a licensee of an Adjusted RBC Report that indicates the event in subdivision A 1, provided the licensee does not challenge the Adjusted RBC Report under &#xA7; 38.2-5507;3\n\nIf, pursuant to &#xA7; 38.2-5507, the licensee challenges an Adjusted RBC Report that indicates the event in subdivision A 1, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge;4\n\nThe failure of the licensee to file an RBC Report by the filing date, unless the licensee has provided an explanation for such failure which is satisfactory to the Commission and has cured the failure within ten days after the filing date;5\n\nThe failure of the licensee to submit an RBC Plan to the Commission within the time period set forth in subsection C of &#xA7; 38.2-5503;6\n\nNotification by the Commission to the licensee that:\n\t\t\t\ta. The RBC Plan or Revised RBC Plan submitted by the licensee is, in the judgment of the Commission, unsatisfactory; and\n\t\t\t\tb. Such notification constitutes a Regulatory Action Level Event with respect to the licensee, provided the licensee has not challenged the determination under &#xA7; 38.2-5507;7\n\nIf, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination by the Commission under subdivision A 6, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected such challenge;8\n\nNotification by the Commission to the licensee that the licensee has failed to adhere to its RBC Plan or Revised RBC Plan, but only if such failure has a substantial adverse effect on the ability of the licensee to eliminate the Company Action Level Event in accordance with its RBC Plan or Revised RBC Plan and the Commission has so stated in the notification, provided the licensee has not challenged the determination under &#xA7; 38.2-5507; or9\n\nIf, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination by the Commission under subdivision A 8, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected the challenge.B\n\nIn the event of a Regulatory Action Level Event, the Commission shall:1\n\nRequire the licensee to prepare and submit an RBC Plan or, if applicable, a Revised RBC Plan;2\n\nPerform such examination or analysis as the Commission deems necessary of the assets, liabilities and operations of the licensee including a review of its RBC Plan or Revised RBC Plan; and3\n\nSubsequent to the examination or analysis, issue a corrective order specifying such corrective actions as the Commission shall determine are required. In determining corrective actions, the Commission may take into account such factors as are deemed relevant with respect to the licensee based upon the Commission&#8217;s examination or analysis of the assets, liabilities and operations of the licensee, including, but not limited to, the results of any sensitivity tests undertaken pursuant to the RBC Instructions.C\n\nThe RBC Plan or Revised RBC Plan shall be submitted:1\n\nWithin forty-five days after the occurrence of the Regulatory Action Level Event;2\n\nIf the licensee challenges an Adjusted RBC Report pursuant to &#xA7; 38.2-5507 and the challenge is not frivolous in the judgment of the Commission, within forty-five days after the notification to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge; or3\n\nIf the licensee challenges a Revised RBC Plan under &#xA7; 38.2-5507 and the challenge is not frivolous in the judgment of the Commission, within forty-five days after notification to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge.D\n\nThe Commission may retain actuaries and investment experts and other consultants as may be necessary in the judgment of the Commission to review the licensee&#8217;s RBC Plan or Revised RBC Plan, examine or analyze the assets, liabilities and operations, including contractual relationships, of the licensee and formulate the corrective order with respect to the licensee. The fees, costs and expenses relating to consultants shall be borne by the affected licensee or such other party as directed by the Commission.","order_by":null,"text":{"0":{"id":310728,"text":"&#8220;Regulatory Action Level Event&#8221; means, with respect to any licensee, any of the following events:","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"A1"},"1":{"id":310729,"text":"The filing of an RBC Report by the licensee which indicates that the licensee&#8217;s Total Adjusted Capital is greater than or equal to its Authorized Control Level RBC but less than its Regulatory Action Level RBC;","type":"section","prefixes":["A","1"],"prefix":"1","entire_prefix":"A1","prefix_anchor":"A1","level":2,"prior_prefix":"A","next_prefix":"A2"},"2":{"id":310730,"text":"The notification by the Commission to a licensee of an Adjusted RBC Report that indicates the event in subdivision A 1, provided the licensee does not challenge the Adjusted RBC Report under &#xA7; 38.2-5507;","type":"section","prefixes":["A","2"],"prefix":"2","entire_prefix":"A2","prefix_anchor":"A2","level":2,"prior_prefix":"A1","next_prefix":"A3"},"3":{"id":310731,"text":"If, pursuant to &#xA7; 38.2-5507, the licensee challenges an Adjusted RBC Report that indicates the event in subdivision A 1, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge;","type":"section","prefixes":["A","3"],"prefix":"3","entire_prefix":"A3","prefix_anchor":"A3","level":2,"prior_prefix":"A2","next_prefix":"A4"},"4":{"id":310732,"text":"The failure of the licensee to file an RBC Report by the filing date, unless the licensee has provided an explanation for such failure which is satisfactory to the Commission and has cured the failure within ten days after the filing date;","type":"section","prefixes":["A","4"],"prefix":"4","entire_prefix":"A4","prefix_anchor":"A4","level":2,"prior_prefix":"A3","next_prefix":"A5"},"5":{"id":310733,"text":"The failure of the licensee to submit an RBC Plan to the Commission within the time period set forth in subsection C of &#xA7; 38.2-5503;","type":"section","prefixes":["A","5"],"prefix":"5","entire_prefix":"A5","prefix_anchor":"A5","level":2,"prior_prefix":"A4","next_prefix":"A6"},"6":{"id":310734,"text":"Notification by the Commission to the licensee that:\n\t\t\t\ta. The RBC Plan or Revised RBC Plan submitted by the licensee is, in the judgment of the Commission, unsatisfactory; and\n\t\t\t\tb. Such notification constitutes a Regulatory Action Level Event with respect to the licensee, provided the licensee has not challenged the determination under &#xA7; 38.2-5507;","type":"section","prefixes":["A","6"],"prefix":"6","entire_prefix":"A6","prefix_anchor":"A6","level":2,"prior_prefix":"A5","next_prefix":"A7"},"7":{"id":310735,"text":"If, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination by the Commission under subdivision A 6, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected such challenge;","type":"section","prefixes":["A","7"],"prefix":"7","entire_prefix":"A7","prefix_anchor":"A7","level":2,"prior_prefix":"A6","next_prefix":"A8"},"8":{"id":310736,"text":"Notification by the Commission to the licensee that the licensee has failed to adhere to its RBC Plan or Revised RBC Plan, but only if such failure has a substantial adverse effect on the ability of the licensee to eliminate the Company Action Level Event in accordance with its RBC Plan or Revised RBC Plan and the Commission has so stated in the notification, provided the licensee has not challenged the determination under &#xA7; 38.2-5507; or","type":"section","prefixes":["A","8"],"prefix":"8","entire_prefix":"A8","prefix_anchor":"A8","level":2,"prior_prefix":"A7","next_prefix":"A9"},"9":{"id":310737,"text":"If, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination by the Commission under subdivision A 8, the notification by the Commission to the licensee that the Commission has, after a hearing, rejected the challenge.","type":"section","prefixes":["A","9"],"prefix":"9","entire_prefix":"A9","prefix_anchor":"A9","level":2,"prior_prefix":"A8","next_prefix":"B"},"10":{"id":310738,"text":"In the event of a Regulatory Action Level Event, the Commission shall:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A9","next_prefix":"B1"},"11":{"id":310739,"text":"Require the licensee to prepare and submit an RBC Plan or, if applicable, a Revised RBC Plan;","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"12":{"id":310740,"text":"Perform such examination or analysis as the Commission deems necessary of the assets, liabilities and operations of the licensee including a review of its RBC Plan or Revised RBC Plan; and","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"13":{"id":310741,"text":"Subsequent to the examination or analysis, issue a corrective order specifying such corrective actions as the Commission shall determine are required. In determining corrective actions, the Commission may take into account such factors as are deemed relevant with respect to the licensee based upon the Commission&#8217;s examination or analysis of the assets, liabilities and operations of the licensee, including, but not limited to, the results of any sensitivity tests undertaken pursuant to the RBC Instructions.","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"C"},"14":{"id":310742,"text":"The RBC Plan or Revised RBC Plan shall be submitted:","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B3","next_prefix":"C1"},"15":{"id":310743,"text":"Within forty-five days after the occurrence of the Regulatory Action Level Event;","type":"section","prefixes":["C","1"],"prefix":"1","entire_prefix":"C1","prefix_anchor":"C1","level":2,"prior_prefix":"C","next_prefix":"C2"},"16":{"id":310744,"text":"If the licensee challenges an Adjusted RBC Report pursuant to &#xA7; 38.2-5507 and the challenge is not frivolous in the judgment of the Commission, within forty-five days after the notification to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge; or","type":"section","prefixes":["C","2"],"prefix":"2","entire_prefix":"C2","prefix_anchor":"C2","level":2,"prior_prefix":"C1","next_prefix":"C3"},"17":{"id":310745,"text":"If the licensee challenges a Revised RBC Plan under &#xA7; 38.2-5507 and the challenge is not frivolous in the judgment of the Commission, within forty-five days after notification to the licensee that the Commission has, after a hearing, rejected the licensee&#8217;s challenge.","type":"section","prefixes":["C","3"],"prefix":"3","entire_prefix":"C3","prefix_anchor":"C3","level":2,"prior_prefix":"C2","next_prefix":"D"},"18":{"id":310746,"text":"The Commission may retain actuaries and investment experts and other consultants as may be necessary in the judgment of the Commission to review the licensee&#8217;s RBC Plan or Revised RBC Plan, examine or analyze the assets, liabilities and operations, including contractual relationships, of the licensee and formulate the corrective order with respect to the licensee. The fees, costs and expenses relating to consultants shall be borne by the affected licensee or such other party as directed by the Commission.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C3"}},"ancestry":[{"id":14894,"edition_id":1,"name":"Risk-Based Capital Act","identifier":"55","label":"chapter","depth":2,"order_by":1,"parent_id":12698,"metadata":{},"date_created":"2026-06-26 03:50:37","date_modified":"2026-06-26 03:50:37","permalink":{"id":217847,"object_type":"structure","relational_id":14894,"identifier":"55","token":"38.2\/55","url":"\/38.2\/55\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12698,"edition_id":1,"name":"Insurance","identifier":"38.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":210661,"object_type":"structure","relational_id":12698,"identifier":"38.2","token":"38.2","url":"\/38.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":68244,"structure_id":14894,"section_number":"38.2-5500","catch_line":"Applicability","url":"\/38.2-5500\/","token":"38.2\/55\/38.2-5500","metadata":false},{"id":67232,"structure_id":14894,"section_number":"38.2-5501","catch_line":"Definitions","url":"\/38.2-5501\/","token":"38.2\/55\/38.2-5501","metadata":false},{"id":68713,"structure_id":14894,"section_number":"38.2-5502","catch_line":"RBC Reports","url":"\/38.2-5502\/","token":"38.2\/55\/38.2-5502","metadata":false},{"id":72298,"structure_id":14894,"section_number":"38.2-5503","catch_line":"Company Action Level Event","url":"\/38.2-5503\/","token":"38.2\/55\/38.2-5503","metadata":false},{"id":86775,"structure_id":14894,"section_number":"38.2-5504","catch_line":"Regulatory Action Level Event","url":"\/38.2-5504\/","token":"38.2\/55\/38.2-5504","metadata":false},{"id":85425,"structure_id":14894,"section_number":"38.2-5505","catch_line":"Authorized Control Level Event","url":"\/38.2-5505\/","token":"38.2\/55\/38.2-5505","metadata":false},{"id":69962,"structure_id":14894,"section_number":"38.2-5506","catch_line":"Mandatory Control Level Event","url":"\/38.2-5506\/","token":"38.2\/55\/38.2-5506","metadata":false},{"id":81704,"structure_id":14894,"section_number":"38.2-5507","catch_line":"Hearings","url":"\/38.2-5507\/","token":"38.2\/55\/38.2-5507","metadata":false},{"id":61072,"structure_id":14894,"section_number":"38.2-5508","catch_line":"Confidentiality; prohibition on announcements; prohibition on use in ratemaking","url":"\/38.2-5508\/","token":"38.2\/55\/38.2-5508","metadata":false},{"id":67266,"structure_id":14894,"section_number":"38.2-5509","catch_line":"Supplemental provisions; rules; exemption","url":"\/38.2-5509\/","token":"38.2\/55\/38.2-5509","metadata":false},{"id":80850,"structure_id":14894,"section_number":"38.2-5510","catch_line":"Foreign licensees","url":"\/38.2-5510\/","token":"38.2\/55\/38.2-5510","metadata":false},{"id":61601,"structure_id":14894,"section_number":"38.2-5511","catch_line":"Immunity","url":"\/38.2-5511\/","token":"38.2\/55\/38.2-5511","metadata":false},{"id":56865,"structure_id":14894,"section_number":"38.2-5512","catch_line":"Repealed","url":"\/38.2-5512\/","token":"38.2\/55\/38.2-5512","metadata":false},{"id":83503,"structure_id":14894,"section_number":"38.2-5513","catch_line":"Notices","url":"\/38.2-5513\/","token":"38.2\/55\/38.2-5513","metadata":false},{"id":69834,"structure_id":14894,"section_number":"38.2-5514","catch_line":"Phase-in provision","url":"\/38.2-5514\/","token":"38.2\/55\/38.2-5514","metadata":false},{"id":67792,"structure_id":14894,"section_number":"38.2-5515","catch_line":"Expired","url":"\/38.2-5515\/","token":"38.2\/55\/38.2-5515","metadata":false}],"previous_section":{"id":72298,"structure_id":14894,"section_number":"38.2-5503","catch_line":"Company Action Level Event","url":"\/38.2-5503\/","token":"38.2\/55\/38.2-5503","metadata":false},"next_section":{"id":85425,"structure_id":14894,"section_number":"38.2-5505","catch_line":"Authorized Control Level Event","url":"\/38.2-5505\/","token":"38.2\/55\/38.2-5505","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/38.2-5504\/","history_text":"<p>This law was first created in 1995. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?951+ful+CHAP0789\">789<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2000, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?001+ful+CHAP0047\">47<\/a>.<\/p>","references":[{"id":72298,"section_number":"38.2-5503","catch_line":"Company Action Level Event","order_by":null,"url":"\/38.2-5503\/"},{"id":85425,"section_number":"38.2-5505","catch_line":"Authorized Control Level Event","order_by":null,"url":"\/38.2-5505\/"},{"id":69834,"section_number":"38.2-5514","catch_line":"Phase-in provision","order_by":null,"url":"\/38.2-5514\/"}],"refers_to":[{"id":72298,"section_number":"38.2-5503","catch_line":"Company Action Level Event","order_by":null,"url":"\/38.2-5503\/"},{"id":81704,"section_number":"38.2-5507","catch_line":"Hearings","order_by":null,"url":"\/38.2-5507\/"}],"permalink":{"id":217865,"object_type":"law","relational_id":86775,"identifier":"38.2-5504","token":"38.2\/55\/38.2-5504","url":"\/38.2-5504\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/38.2-5504\/","token":"38.2\/55\/38.2-5504","dublin_core":{"Title":"Regulatory Action Level Event","Type":"Text","Format":"text\/html","Identifier":"\u00a7 38.2-5504","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> &#8220;Regulatory Action Level Event&#8221; means, with respect to any <span class=\"dictionary\">licensee<\/span>, any of the following events: <a id=\"paragraph-310728\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> The filing of an <span class=\"dictionary\">RBC Report<\/span> by the <span class=\"dictionary\">licensee<\/span> which indicates that the <span class=\"dictionary\">licensee<\/span>&#8217;s <span class=\"dictionary\">Total Adjusted Capital<\/span> is greater than or equal to its <span class=\"dictionary\">Authorized Control Level RBC<\/span> but less than its <span class=\"dictionary\">Regulatory Action Level RBC<\/span>; <a id=\"paragraph-310729\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> The notification by the <span class=\"dictionary\">Commission<\/span> to a <span class=\"dictionary\">licensee<\/span> of an <span class=\"dictionary\">Adjusted RBC Report<\/span> that indicates the event in subdivision A 1, provided the <span class=\"dictionary\">licensee<\/span> does not challenge the <span class=\"dictionary\">Adjusted RBC Report<\/span> under &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>; <a id=\"paragraph-310730\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> If, pursuant to &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>, the <span class=\"dictionary\">licensee<\/span> challenges an <span class=\"dictionary\">Adjusted RBC Report<\/span> that indicates the event in subdivision A 1, the notification by the <span class=\"dictionary\">Commission<\/span> to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">Commission<\/span> has, after a <span class=\"dictionary\">hearing<\/span>, rejected the <span class=\"dictionary\">licensee<\/span>&#8217;s challenge; <a id=\"paragraph-310731\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> The failure of the <span class=\"dictionary\">licensee<\/span> to file an RBC Report by the filing date, unless the <span class=\"dictionary\">licensee<\/span> has provided an explanation for such failure which is satisfactory to the <span class=\"dictionary\">Commission<\/span> and has cured the failure within ten days after the filing date; <a id=\"paragraph-310732\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A5\" class=\"indent-1\"><p><span class=\"prefix-number\">5.<\/span> The failure of the <span class=\"dictionary\">licensee<\/span> to submit an <span class=\"dictionary\">RBC Plan<\/span> to the <span class=\"dictionary\">Commission<\/span> within the time period set forth in subsection C of &#xA7; <a class=\"law\" title=\"Company Action Level Event\" href=\"\/38.2-5503\/\">38.2-5503<\/a>; <a id=\"paragraph-310733\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A5\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A6\" class=\"indent-1\"><p><span class=\"prefix-number\">6.<\/span> Notification by the <span class=\"dictionary\">Commission<\/span> to the <span class=\"dictionary\">licensee<\/span> that:\n\t\t\t\ta. The <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span> submitted by the <span class=\"dictionary\">licensee<\/span> is, in the <span class=\"dictionary\">judgment<\/span> of the <span class=\"dictionary\">Commission<\/span>, unsatisfactory; and\n\t\t\t\tb. Such notification constitutes a Regulatory Action Level Event with respect to the <span class=\"dictionary\">licensee<\/span>, provided the <span class=\"dictionary\">licensee<\/span> has not challenged the determination under &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>; <a id=\"paragraph-310734\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A6\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A7\" class=\"indent-1\"><p><span class=\"prefix-number\">7.<\/span> If, pursuant to &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>, the <span class=\"dictionary\">licensee<\/span> challenges a determination by the <span class=\"dictionary\">Commission<\/span> under subdivision A 6, the notification by the <span class=\"dictionary\">Commission<\/span> to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">Commission<\/span> has, after a <span class=\"dictionary\">hearing<\/span>, rejected such challenge; <a id=\"paragraph-310735\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A7\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A8\" class=\"indent-1\"><p><span class=\"prefix-number\">8.<\/span> Notification by the <span class=\"dictionary\">Commission<\/span> to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">licensee<\/span> has failed to adhere to its <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span>, but only if such failure has a substantial adverse effect on the ability of the <span class=\"dictionary\">licensee<\/span> to eliminate the <span class=\"dictionary\">Company<\/span> Action Level Event in accordance with its <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span> and the <span class=\"dictionary\">Commission<\/span> has so stated in the notification, provided the <span class=\"dictionary\">licensee<\/span> has not challenged the determination under &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>; or <a id=\"paragraph-310736\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A8\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A9\" class=\"indent-1\"><p><span class=\"prefix-number\">9.<\/span> If, pursuant to &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a>, the <span class=\"dictionary\">licensee<\/span> challenges a determination by the <span class=\"dictionary\">Commission<\/span> under subdivision A 8, the notification by the <span class=\"dictionary\">Commission<\/span> to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">Commission<\/span> has, after a <span class=\"dictionary\">hearing<\/span>, rejected the challenge. <a id=\"paragraph-310737\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#A9\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> In the event of a Regulatory Action Level Event, the <span class=\"dictionary\">Commission<\/span> shall: <a id=\"paragraph-310738\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Require the <span class=\"dictionary\">licensee<\/span> to prepare and submit an <span class=\"dictionary\">RBC Plan<\/span> or, if applicable, a Revised <span class=\"dictionary\">RBC Plan<\/span>; <a id=\"paragraph-310739\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> Perform such examination or analysis as the <span class=\"dictionary\">Commission<\/span> deems necessary of the <span class=\"dictionary\">assets<\/span>, liabilities and operations of the <span class=\"dictionary\">licensee<\/span> including a review of its <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span>; and <a id=\"paragraph-310740\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Subsequent to the examination or analysis, <span class=\"dictionary\">issue<\/span> a <span class=\"dictionary\">corrective order<\/span> specifying such corrective actions as the <span class=\"dictionary\">Commission<\/span> shall determine are required. In determining corrective actions, the <span class=\"dictionary\">Commission<\/span> may take into account such factors as are deemed relevant with respect to the <span class=\"dictionary\">licensee<\/span> based upon the <span class=\"dictionary\">Commission<\/span>&#8217;s examination or analysis of the <span class=\"dictionary\">assets<\/span>, liabilities and operations of the <span class=\"dictionary\">licensee<\/span>, including, but not limited to, the results of any sensitivity tests undertaken pursuant to the <span class=\"dictionary\">RBC Instructions<\/span>. <a id=\"paragraph-310741\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> The <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span> shall be submitted: <a id=\"paragraph-310742\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Within forty-five days after the occurrence of the Regulatory Action Level Event; <a id=\"paragraph-310743\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#C1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> If the <span class=\"dictionary\">licensee<\/span> challenges an <span class=\"dictionary\">Adjusted RBC Report<\/span> pursuant to &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a> and the challenge is not frivolous in the <span class=\"dictionary\">judgment<\/span> of the <span class=\"dictionary\">Commission<\/span>, within forty-five days after the notification to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">Commission<\/span> has, after a <span class=\"dictionary\">hearing<\/span>, rejected the <span class=\"dictionary\">licensee<\/span>&#8217;s challenge; or <a id=\"paragraph-310744\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#C2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> If the <span class=\"dictionary\">licensee<\/span> challenges a Revised <span class=\"dictionary\">RBC Plan<\/span> under &#xA7; <a class=\"law\" title=\"Hearings\" href=\"\/38.2-5507\/\">38.2-5507<\/a> and the challenge is not frivolous in the <span class=\"dictionary\">judgment<\/span> of the <span class=\"dictionary\">Commission<\/span>, within forty-five days after notification to the <span class=\"dictionary\">licensee<\/span> that the <span class=\"dictionary\">Commission<\/span> has, after a <span class=\"dictionary\">hearing<\/span>, rejected the <span class=\"dictionary\">licensee<\/span>&#8217;s challenge. <a id=\"paragraph-310745\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#C3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> The <span class=\"dictionary\">Commission<\/span> may retain actuaries and investment experts and other consultants as may be necessary in the <span class=\"dictionary\">judgment<\/span> of the <span class=\"dictionary\">Commission<\/span> to review the <span class=\"dictionary\">licensee<\/span>&#8217;s <span class=\"dictionary\">RBC Plan<\/span> or Revised <span class=\"dictionary\">RBC Plan<\/span>, examine or analyze the <span class=\"dictionary\">assets<\/span>, liabilities and operations, including contractual relationships, of the <span class=\"dictionary\">licensee<\/span> and formulate the <span class=\"dictionary\">corrective order<\/span> with respect to the <span class=\"dictionary\">licensee<\/span>. The fees, costs and expenses relating to consultants shall be borne by the affected <span class=\"dictionary\">licensee<\/span> or such other <span class=\"dictionary\">party<\/span> as directed by the <span class=\"dictionary\">Commission<\/span>. <a id=\"paragraph-310746\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/38.2-5504\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nREGULATORY ACTION LEVEL EVENT (\u00a7 38.2-5504)\n\nA. &#8220;Regulatory Action Level Event&#8221; means, with respect to any\nlicensee, any of the following events:\n\n   1. The filing of an RBC Report by the licensee which indicates that the\n   licensee&#8217;s Total Adjusted Capital is greater than or equal to its\n   Authorized Control Level RBC but less than its Regulatory Action Level RBC;\n\n   2. The notification by the Commission to a licensee of an Adjusted RBC Report\n   that indicates the event in subdivision A 1, provided the licensee does not\n   challenge the Adjusted RBC Report under &#xA7; 38.2-5507;\n\n   3. If, pursuant to &#xA7; 38.2-5507, the licensee challenges an Adjusted RBC\n   Report that indicates the event in subdivision A 1, the notification by the\n   Commission to the licensee that the Commission has, after a hearing, rejected\n   the licensee&#8217;s challenge;\n\n   4. The failure of the licensee to file an RBC Report by the filing date,\n   unless the licensee has provided an explanation for such failure which is\n   satisfactory to the Commission and has cured the failure within ten days after\n   the filing date;\n\n   5. The failure of the licensee to submit an RBC Plan to the Commission within\n   the time period set forth in subsection C of &#xA7; 38.2-5503;\n\n   6. Notification by the Commission to the licensee that:\n   \t\t\t\ta. The RBC Plan or Revised RBC Plan submitted by the licensee is, in the\n   judgment of the Commission, unsatisfactory; and\n   \t\t\t\tb. Such notification constitutes a Regulatory Action Level Event with\n   respect to the licensee, provided the licensee has not challenged the\n   determination under &#xA7; 38.2-5507;\n\n   7. If, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination\n   by the Commission under subdivision A 6, the notification by the Commission to\n   the licensee that the Commission has, after a hearing, rejected such\n   challenge;\n\n   8. Notification by the Commission to the licensee that the licensee has failed\n   to adhere to its RBC Plan or Revised RBC Plan, but only if such failure has a\n   substantial adverse effect on the ability of the licensee to eliminate the\n   Company Action Level Event in accordance with its RBC Plan or Revised RBC Plan\n   and the Commission has so stated in the notification, provided the licensee\n   has not challenged the determination under &#xA7; 38.2-5507; or\n\n   9. If, pursuant to &#xA7; 38.2-5507, the licensee challenges a determination\n   by the Commission under subdivision A 8, the notification by the Commission to\n   the licensee that the Commission has, after a hearing, rejected the challenge.\n\nB. In the event of a Regulatory Action Level Event, the Commission shall:\n\n   1. Require the licensee to prepare and submit an RBC Plan or, if applicable, a\n   Revised RBC Plan;\n\n   2. Perform such examination or analysis as the Commission deems necessary of\n   the assets, liabilities and operations of the licensee including a review of\n   its RBC Plan or Revised RBC Plan; and\n\n   3. Subsequent to the examination or analysis, issue a corrective order\n   specifying such corrective actions as the Commission shall determine are\n   required. In determining corrective actions, the Commission may take into\n   account such factors as are deemed relevant with respect to the licensee based\n   upon the Commission&#8217;s examination or analysis of the assets, liabilities\n   and operations of the licensee, including, but not limited to, the results of\n   any sensitivity tests undertaken pursuant to the RBC Instructions.\n\nC. The RBC Plan or Revised RBC Plan shall be submitted:\n\n   1. Within forty-five days after the occurrence of the Regulatory Action Level\n   Event;\n\n   2. If the licensee challenges an Adjusted RBC Report pursuant to &#xA7;\n   38.2-5507 and the challenge is not frivolous in the judgment of the\n   Commission, within forty-five days after the notification to the licensee that\n   the Commission has, after a hearing, rejected the licensee&#8217;s challenge;\n   or\n\n   3. If the licensee challenges a Revised RBC Plan under &#xA7; 38.2-5507 and\n   the challenge is not frivolous in the judgment of the Commission, within\n   forty-five days after notification to the licensee that the Commission has,\n   after a hearing, rejected the licensee&#8217;s challenge.\n\nD. The Commission may retain actuaries and investment experts and other\nconsultants as may be necessary in the judgment of the Commission to review the\nlicensee&#8217;s RBC Plan or Revised RBC Plan, examine or analyze the assets,\nliabilities and operations, including contractual relationships, of the licensee\nand formulate the corrective order with respect to the licensee. The fees, costs\nand expenses relating to consultants shall be borne by the affected licensee or\nsuch other party as directed by the Commission.\n\nHISTORY: 1995, c. 789; 2000, c. 47.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}