{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/43-11.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/43-11.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/43-11.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/43-11.html"}],"law_id":55337,"edition_id":1,"section_id":55337,"structure_id":14160,"section_number":"43-11","catch_line":"How owner or general contractor made personally liable to subcontractor, laborer or materialman","history":"1924, p. 658; Michie Code 1942, \u00a7 6429a; 1968, c. 568; 2002, c. 772.","full_text":"1\n\nAny subcontractor or person furnishing labor or material to the general contractor or subcontractor, may give a preliminary notice in writing to the owner or his agent or the general contractor, stating the nature and character of his contract and the probable amount of his claim.2\n\nAdditionally, if such subcontractor, or person furnishing labor or material shall at any time after the work is done or material furnished by him and before the expiration of thirty days from the time such building or structure is completed or the work thereon otherwise terminated furnish the owner thereof or his agent and also the general contractor, or the general contractor alone in case he is the only one notified, with a second notice stating a correct account, verified by affidavit, of his actual claim against the general contractor or subcontractor, for work done or materials furnished and of the amount due, then the owner, or the general contractor, if he alone was notified, shall be personally liable to the claimant for the actual amount due to the subcontractor or persons furnishing labor or material by the general contractor or subcontractor, provided the same does not exceed the sum in which the owner is indebted to the general contractor at the time the second notice is given or may thereafter become indebted by virtue of his contract with the general contractor, or in case the general contractor alone is notified the sum in which he is indebted to the subcontractor at the time the second notice is given or may thereafter become indebted by virtue of his contract with the general contractor. But the amount which a person supplying labor or material to a subcontractor can claim shall not exceed the amount for which such subcontractor could file his claim.3\n\nAny bona fide agreement for deductions by the owner because of the failure or refusal of the general contractor to comply with his contract shall be binding upon such subcontractor, laborer or materialman.4\n\nThe provisions of this section are subject to the qualification that before any such personal liability of the owner or general contractor herein provided for shall be binding the two notices herein required, with such returns thereon as is sufficient under &#xA7; 8.01-325, shall be recorded and indexed as provided in &#xA7; 43-4.1 in the appropriate clerk&#8217;s office; or the two notices herein required shall be mailed by registered or certified mail to and received by the owner or general contractor upon whom personal liability is sought to be imposed, and a return receipt therefor showing delivery to the addressee shall be prima facie evidence of receipt.","order_by":null,"text":{"0":{"id":202915,"text":"Any subcontractor or person furnishing labor or material to the general contractor or subcontractor, may give a preliminary notice in writing to the owner or his agent or the general contractor, stating the nature and character of his contract and the probable amount of his claim.","type":"section","prefixes":["1"],"prefix":"1","entire_prefix":"1","prefix_anchor":"1","level":1,"next_prefix":"2"},"1":{"id":202916,"text":"Additionally, if such subcontractor, or person furnishing labor or material shall at any time after the work is done or material furnished by him and before the expiration of thirty days from the time such building or structure is completed or the work thereon otherwise terminated furnish the owner thereof or his agent and also the general contractor, or the general contractor alone in case he is the only one notified, with a second notice stating a correct account, verified by affidavit, of his actual claim against the general contractor or subcontractor, for work done or materials furnished and of the amount due, then the owner, or the general contractor, if he alone was notified, shall be personally liable to the claimant for the actual amount due to the subcontractor or persons furnishing labor or material by the general contractor or subcontractor, provided the same does not exceed the sum in which the owner is indebted to the general contractor at the time the second notice is given or may thereafter become indebted by virtue of his contract with the general contractor, or in case the general contractor alone is notified the sum in which he is indebted to the subcontractor at the time the second notice is given or may thereafter become indebted by virtue of his contract with the general contractor. But the amount which a person supplying labor or material to a subcontractor can claim shall not exceed the amount for which such subcontractor could file his claim.","type":"section","prefixes":["2"],"prefix":"2","entire_prefix":"2","prefix_anchor":"2","level":1,"prior_prefix":"1","next_prefix":"3"},"2":{"id":202917,"text":"Any bona fide agreement for deductions by the owner because of the failure or refusal of the general contractor to comply with his contract shall be binding upon such subcontractor, laborer or materialman.","type":"section","prefixes":["3"],"prefix":"3","entire_prefix":"3","prefix_anchor":"3","level":1,"prior_prefix":"2","next_prefix":"4"},"3":{"id":202918,"text":"The provisions of this section are subject to the qualification that before any such personal liability of the owner or general contractor herein provided for shall be binding the two notices herein required, with such returns thereon as is sufficient under &#xA7; 8.01-325, shall be recorded and indexed as provided in &#xA7; 43-4.1 in the appropriate clerk&#8217;s office; or the two notices herein required shall be mailed by registered or certified mail to and received by the owner or general contractor upon whom personal liability is sought to be imposed, and a return receipt therefor showing delivery to the addressee shall be prima facie evidence of receipt.","type":"section","prefixes":["4"],"prefix":"4","entire_prefix":"4","prefix_anchor":"4","level":1,"prior_prefix":"3"}},"ancestry":[{"id":14160,"edition_id":1,"name":"Mechanics' and Materialmen's Liens","identifier":"1","label":"chapter","depth":2,"order_by":1,"parent_id":14159,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221267,"object_type":"structure","relational_id":14160,"identifier":"1","token":"43\/1","url":"\/43\/1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":14159,"edition_id":1,"name":"Mechanics' and Certain Other Liens","identifier":"43","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221265,"object_type":"structure","relational_id":14159,"identifier":"43","token":"43","url":"\/43\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":81902,"structure_id":14160,"section_number":"43-1","catch_line":"Definitions","url":"\/43-1\/","token":"43\/1\/43-1","metadata":false},{"id":72410,"structure_id":14160,"section_number":"43-10","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-9","url":"\/43-10\/","token":"43\/1\/43-10","metadata":false},{"id":55337,"structure_id":14160,"section_number":"43-11","catch_line":"How owner or general contractor made personally liable to subcontractor, laborer or materialman","url":"\/43-11\/","token":"43\/1\/43-11","metadata":false},{"id":79868,"structure_id":14160,"section_number":"43-12","catch_line":"Repealed","url":"\/43-12\/","token":"43\/1\/43-12","metadata":false},{"id":64540,"structure_id":14160,"section_number":"43-13","catch_line":"Funds paid to general contractor or subcontractor must be used to pay persons performing labor or furnishing material","url":"\/43-13\/","token":"43\/1\/43-13","metadata":false},{"id":69845,"structure_id":14160,"section_number":"43-13.1","catch_line":"Use of lien waiver form; forgery or signing without authority","url":"\/43-13.1\/","token":"43\/1\/43-13.1","metadata":false},{"id":86055,"structure_id":14160,"section_number":"43-13.2","catch_line":"When an affidavit or a signed statement of payment required of owner prior to sale","url":"\/43-13.2\/","token":"43\/1\/43-13.2","metadata":false},{"id":80570,"structure_id":14160,"section_number":"43-13.3","catch_line":"An affidavit or a signed statement of payment required of owner prior to sale or refinance; penalty","url":"\/43-13.3\/","token":"43\/1\/43-13.3","metadata":false},{"id":79181,"structure_id":14160,"section_number":"43-14","catch_line":"Repealed","url":"\/43-14\/","token":"43\/1\/43-14","metadata":false},{"id":71794,"structure_id":14160,"section_number":"43-14.1","catch_line":"Service of notices","url":"\/43-14.1\/","token":"43\/1\/43-14.1","metadata":false},{"id":66035,"structure_id":14160,"section_number":"43-15","catch_line":"Inaccuracies in memorandum or description not affecting lien","url":"\/43-15\/","token":"43\/1\/43-15","metadata":false},{"id":55414,"structure_id":14160,"section_number":"43-16","catch_line":"What owner may do when contractor fails or refuses to complete building, etc","url":"\/43-16\/","token":"43\/1\/43-16","metadata":false},{"id":68827,"structure_id":14160,"section_number":"43-17","catch_line":"Limitation on suit to enforce lien","url":"\/43-17\/","token":"43\/1\/43-17","metadata":false},{"id":71472,"structure_id":14160,"section_number":"43-17.1","catch_line":"Hearing on validity of lien","url":"\/43-17.1\/","token":"43\/1\/43-17.1","metadata":false},{"id":57819,"structure_id":14160,"section_number":"43-18","catch_line":"Lien of general contractor to inure to benefit of subcontractor","url":"\/43-18\/","token":"43\/1\/43-18","metadata":false},{"id":58965,"structure_id":14160,"section_number":"43-19","catch_line":"Validity and priority of lien not affected by assignments","url":"\/43-19\/","token":"43\/1\/43-19","metadata":false},{"id":61935,"structure_id":14160,"section_number":"43-2","catch_line":"Structures, materials, etc., deemed permanently annexed to freehold","url":"\/43-2\/","token":"43\/1\/43-2","metadata":false},{"id":66681,"structure_id":14160,"section_number":"43-20","catch_line":"Extent of lien where owner has less than fee in land","url":"\/43-20\/","token":"43\/1\/43-20","metadata":false},{"id":66928,"structure_id":14160,"section_number":"43-21","catch_line":"Priorities between mechanics' and other liens","url":"\/43-21\/","token":"43\/1\/43-21","metadata":false},{"id":68364,"structure_id":14160,"section_number":"43-22","catch_line":"How liens enforced","url":"\/43-22\/","token":"43\/1\/43-22","metadata":false},{"id":72370,"structure_id":14160,"section_number":"43-23","catch_line":"Priority among liens perfected under this chapter","url":"\/43-23\/","token":"43\/1\/43-23","metadata":false},{"id":67717,"structure_id":14160,"section_number":"43-23.1","catch_line":"Forfeiture of lien","url":"\/43-23.1\/","token":"43\/1\/43-23.1","metadata":false},{"id":55321,"structure_id":14160,"section_number":"43-23.2","catch_line":"Remedies cumulative","url":"\/43-23.2\/","token":"43\/1\/43-23.2","metadata":false},{"id":75637,"structure_id":14160,"section_number":"43-3","catch_line":"Lien for work done and materials furnished; waiver of right to file or enforce lien","url":"\/43-3\/","token":"43\/1\/43-3","metadata":false},{"id":75853,"structure_id":14160,"section_number":"43-4","catch_line":"Perfection of lien by general contractor; recordation and notice","url":"\/43-4\/","token":"43\/1\/43-4","metadata":false},{"id":73387,"structure_id":14160,"section_number":"43-4.01","catch_line":"Posting of building permit; identification of mechanics' lien agent in building permit; notice to mechanics' lien agent; effect of notice","url":"\/43-4.01\/","token":"43\/1\/43-4.01","metadata":false},{"id":66257,"structure_id":14160,"section_number":"43-4.1","catch_line":"Liens to be recorded in deed books and indexed in general index of deeds","url":"\/43-4.1\/","token":"43\/1\/43-4.1","metadata":false},{"id":83985,"structure_id":14160,"section_number":"43-5","catch_line":"Sufficiency of memorandum and affidavit required by \u00a7 43-4","url":"\/43-5\/","token":"43\/1\/43-5","metadata":false},{"id":61637,"structure_id":14160,"section_number":"43-6","catch_line":"Repealed","url":"\/43-6\/","token":"43\/1\/43-6","metadata":false},{"id":79054,"structure_id":14160,"section_number":"43-7","catch_line":"Perfection of lien by subcontractor; extent of lien; affirmative defense; provisions relating to time-share estates","url":"\/43-7\/","token":"43\/1\/43-7","metadata":false},{"id":81789,"structure_id":14160,"section_number":"43-8","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-7","url":"\/43-8\/","token":"43\/1\/43-8","metadata":false},{"id":66394,"structure_id":14160,"section_number":"43-9","catch_line":"Perfection of lien by person performing labor or furnishing materials for a subcontractor; extent of lien","url":"\/43-9\/","token":"43\/1\/43-9","metadata":false}],"previous_section":{"id":72410,"structure_id":14160,"section_number":"43-10","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-9","url":"\/43-10\/","token":"43\/1\/43-10","metadata":false},"next_section":{"id":79868,"structure_id":14160,"section_number":"43-12","catch_line":"Repealed","url":"\/43-12\/","token":"43\/1\/43-12","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/43-11\/","history_text":"<p>The record of this law\u2019s original creation isn\u2019t available online. It has been modified 2 times. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. Those modifications are as follows: in 1968, chapter 568; in 2002, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0772\">772<\/a>.<\/p>","references":[{"id":71794,"section_number":"43-14.1","catch_line":"Service of notices","order_by":null,"url":"\/43-14.1\/"}],"refers_to":[{"id":66257,"section_number":"43-4.1","catch_line":"Liens to be recorded in deed books and indexed in general index of deeds","order_by":null,"url":"\/43-4.1\/"},{"id":86831,"section_number":"8.01-325","catch_line":"Return by person serving process","order_by":null,"url":"\/8.01-325\/"}],"permalink":{"id":221277,"object_type":"law","relational_id":55337,"identifier":"43-11","token":"43\/1\/43-11","url":"\/43-11\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/43-11\/","token":"43\/1\/43-11","dublin_core":{"Title":"How owner or general contractor made personally liable to subcontractor, laborer or materialman","Type":"Text","Format":"text\/html","Identifier":"\u00a7 43-11","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"1\"><p><span class=\"prefix-number\">1.<\/span> Any subcontractor or person furnishing labor or <span class=\"dictionary\">material<\/span> to the general contractor or subcontractor, may give a preliminary notice in writing to the owner or his agent or the general contractor, stating the nature and character of his <span class=\"dictionary\">contract<\/span> and the probable amount of his claim. <a id=\"paragraph-202915\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/43-11\/#1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"2\"><p><span class=\"prefix-number\">2.<\/span> Additionally, if such subcontractor, or person furnishing labor or <span class=\"dictionary\">material<\/span> shall at any time after the work is done or <span class=\"dictionary\">material<\/span> furnished by him and before the expiration of thirty days from the time such building or structure is completed or the work thereon otherwise terminated furnish the owner thereof or his agent and also the general contractor, or the general contractor alone in case he is the only one notified, with a second notice stating a correct account, verified by <span class=\"dictionary\">affidavit<\/span>, of his actual claim against the general contractor or subcontractor, for work done or <span class=\"dictionary\">materials<\/span> furnished and of the amount due, then the owner, or the general contractor, if he alone was notified, shall be personally liable to the claimant for the actual amount due to the subcontractor or persons furnishing labor or <span class=\"dictionary\">material<\/span> by the general contractor or subcontractor, provided the same does not exceed the sum in which the owner is indebted to the general contractor at the time the second notice is given or may thereafter become indebted by virtue of his <span class=\"dictionary\">contract<\/span> with the general contractor, or in case the general contractor alone is notified the sum in which he is indebted to the subcontractor at the time the second notice is given or may thereafter become indebted by virtue of his <span class=\"dictionary\">contract<\/span> with the general contractor. But the amount which a person supplying labor or <span class=\"dictionary\">material<\/span> to a subcontractor can claim shall not exceed the amount for which such subcontractor could file his claim. <a id=\"paragraph-202916\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/43-11\/#2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"3\"><p><span class=\"prefix-number\">3.<\/span> Any bona fide agreement for deductions by the owner because of the failure or refusal of the general contractor to comply with his <span class=\"dictionary\">contract<\/span> shall be binding upon such subcontractor, laborer or materialman. <a id=\"paragraph-202917\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/43-11\/#3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"4\"><p><span class=\"prefix-number\">4.<\/span> The provisions of this section are subject to the qualification that before any such personal liability of the owner or general contractor herein provided for shall be binding the two notices herein required, with such returns thereon as is sufficient under &#xA7; <a class=\"law\" title=\"Return by person serving process\" href=\"\/8.01-325\/\">8.01-325<\/a>, shall be recorded and indexed as provided in &#xA7; <a class=\"law\" title=\"Liens to be recorded in deed books and indexed in general index of deeds\" href=\"\/43-4.1\/\">43-4.1<\/a> in the appropriate clerk&#8217;s office; or the two notices herein required shall be mailed by registered or certified mail to and received by the owner or general contractor upon whom personal liability is sought to be imposed, and a return receipt therefor showing delivery to the addressee shall be prima facie <span class=\"dictionary\">evidence<\/span> of receipt. <a id=\"paragraph-202918\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/43-11\/#4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nHOW OWNER OR GENERAL CONTRACTOR MADE PERSONALLY LIABLE TO SUBCONTRACTOR, LABORER\nOR MATERIALMAN (\u00a7 43-11)\n\n1. Any subcontractor or person furnishing labor or material to the general\ncontractor or subcontractor, may give a preliminary notice in writing to the\nowner or his agent or the general contractor, stating the nature and character\nof his contract and the probable amount of his claim.\n\n2. Additionally, if such subcontractor, or person furnishing labor or material\nshall at any time after the work is done or material furnished by him and before\nthe expiration of thirty days from the time such building or structure is\ncompleted or the work thereon otherwise terminated furnish the owner thereof or\nhis agent and also the general contractor, or the general contractor alone in\ncase he is the only one notified, with a second notice stating a correct\naccount, verified by affidavit, of his actual claim against the general\ncontractor or subcontractor, for work done or materials furnished and of the\namount due, then the owner, or the general contractor, if he alone was notified,\nshall be personally liable to the claimant for the actual amount due to the\nsubcontractor or persons furnishing labor or material by the general contractor\nor subcontractor, provided the same does not exceed the sum in which the owner\nis indebted to the general contractor at the time the second notice is given or\nmay thereafter become indebted by virtue of his contract with the general\ncontractor, or in case the general contractor alone is notified the sum in which\nhe is indebted to the subcontractor at the time the second notice is given or\nmay thereafter become indebted by virtue of his contract with the general\ncontractor. But the amount which a person supplying labor or material to a\nsubcontractor can claim shall not exceed the amount for which such subcontractor\ncould file his claim.\n\n3. Any bona fide agreement for deductions by the owner because of the failure or\nrefusal of the general contractor to comply with his contract shall be binding\nupon such subcontractor, laborer or materialman.\n\n4. The provisions of this section are subject to the qualification that before\nany such personal liability of the owner or general contractor herein provided\nfor shall be binding the two notices herein required, with such returns thereon\nas is sufficient under &#xA7; 8.01-325, shall be recorded and indexed as\nprovided in &#xA7; 43-4.1 in the appropriate clerk&#8217;s office; or the two\nnotices herein required shall be mailed by registered or certified mail to and\nreceived by the owner or general contractor upon whom personal liability is\nsought to be imposed, and a return receipt therefor showing delivery to the\naddressee shall be prima facie evidence of receipt.\n\nHISTORY: 1924, p. 658; Michie Code 1942, \u00a7 6429a; 1968, c. 568; 2002, c. 772.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}