{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/43-16.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/43-16.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/43-16.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/43-16.html"}],"law_id":55414,"edition_id":1,"section_id":55414,"structure_id":14160,"section_number":"43-16","catch_line":"What owner may do when contractor fails or refuses to complete building, etc","history":"Code 1919, \u00a7 6432.","full_text":"If the owner is compelled to complete his building, structure, or railroad, or any part thereof undertaken by a general contractor in consequence of the failure or refusal of the general contractor to do so, the amount expended by the owner for such completion shall have priority over all mechanics&#8217; liens which have been or may be placed on such building, structure, or railroad by such general contractor, a subcontractor under him, or any person furnishing labor or materials to either of them.","order_by":null,"text":{"0":{"id":203170,"text":"If the owner is compelled to complete his building, structure, or railroad, or any part thereof undertaken by a general contractor in consequence of the failure or refusal of the general contractor to do so, the amount expended by the owner for such completion shall have priority over all mechanics&#8217; liens which have been or may be placed on such building, structure, or railroad by such general contractor, a subcontractor under him, or any person furnishing labor or materials to either of them.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14160,"edition_id":1,"name":"Mechanics' and Materialmen's Liens","identifier":"1","label":"chapter","depth":2,"order_by":1,"parent_id":14159,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221267,"object_type":"structure","relational_id":14160,"identifier":"1","token":"43\/1","url":"\/43\/1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":14159,"edition_id":1,"name":"Mechanics' and Certain Other Liens","identifier":"43","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221265,"object_type":"structure","relational_id":14159,"identifier":"43","token":"43","url":"\/43\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":81902,"structure_id":14160,"section_number":"43-1","catch_line":"Definitions","url":"\/43-1\/","token":"43\/1\/43-1","metadata":false},{"id":72410,"structure_id":14160,"section_number":"43-10","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-9","url":"\/43-10\/","token":"43\/1\/43-10","metadata":false},{"id":55337,"structure_id":14160,"section_number":"43-11","catch_line":"How owner or general contractor made personally liable to subcontractor, laborer or materialman","url":"\/43-11\/","token":"43\/1\/43-11","metadata":false},{"id":79868,"structure_id":14160,"section_number":"43-12","catch_line":"Repealed","url":"\/43-12\/","token":"43\/1\/43-12","metadata":false},{"id":64540,"structure_id":14160,"section_number":"43-13","catch_line":"Funds paid to general contractor or subcontractor must be used to pay persons performing labor or furnishing material","url":"\/43-13\/","token":"43\/1\/43-13","metadata":false},{"id":69845,"structure_id":14160,"section_number":"43-13.1","catch_line":"Use of lien waiver form; forgery or signing without authority","url":"\/43-13.1\/","token":"43\/1\/43-13.1","metadata":false},{"id":86055,"structure_id":14160,"section_number":"43-13.2","catch_line":"When an affidavit or a signed statement of payment required of owner prior to sale","url":"\/43-13.2\/","token":"43\/1\/43-13.2","metadata":false},{"id":80570,"structure_id":14160,"section_number":"43-13.3","catch_line":"An affidavit or a signed statement of payment required of owner prior to sale or refinance; penalty","url":"\/43-13.3\/","token":"43\/1\/43-13.3","metadata":false},{"id":79181,"structure_id":14160,"section_number":"43-14","catch_line":"Repealed","url":"\/43-14\/","token":"43\/1\/43-14","metadata":false},{"id":71794,"structure_id":14160,"section_number":"43-14.1","catch_line":"Service of notices","url":"\/43-14.1\/","token":"43\/1\/43-14.1","metadata":false},{"id":66035,"structure_id":14160,"section_number":"43-15","catch_line":"Inaccuracies in memorandum or description not affecting lien","url":"\/43-15\/","token":"43\/1\/43-15","metadata":false},{"id":55414,"structure_id":14160,"section_number":"43-16","catch_line":"What owner may do when contractor fails or refuses to complete building, etc","url":"\/43-16\/","token":"43\/1\/43-16","metadata":false},{"id":68827,"structure_id":14160,"section_number":"43-17","catch_line":"Limitation on suit to enforce lien","url":"\/43-17\/","token":"43\/1\/43-17","metadata":false},{"id":71472,"structure_id":14160,"section_number":"43-17.1","catch_line":"Hearing on validity of lien","url":"\/43-17.1\/","token":"43\/1\/43-17.1","metadata":false},{"id":57819,"structure_id":14160,"section_number":"43-18","catch_line":"Lien of general contractor to inure to benefit of subcontractor","url":"\/43-18\/","token":"43\/1\/43-18","metadata":false},{"id":58965,"structure_id":14160,"section_number":"43-19","catch_line":"Validity and priority of lien not affected by assignments","url":"\/43-19\/","token":"43\/1\/43-19","metadata":false},{"id":61935,"structure_id":14160,"section_number":"43-2","catch_line":"Structures, materials, etc., deemed permanently annexed to freehold","url":"\/43-2\/","token":"43\/1\/43-2","metadata":false},{"id":66681,"structure_id":14160,"section_number":"43-20","catch_line":"Extent of lien where owner has less than fee in land","url":"\/43-20\/","token":"43\/1\/43-20","metadata":false},{"id":66928,"structure_id":14160,"section_number":"43-21","catch_line":"Priorities between mechanics' and other liens","url":"\/43-21\/","token":"43\/1\/43-21","metadata":false},{"id":68364,"structure_id":14160,"section_number":"43-22","catch_line":"How liens enforced","url":"\/43-22\/","token":"43\/1\/43-22","metadata":false},{"id":72370,"structure_id":14160,"section_number":"43-23","catch_line":"Priority among liens perfected under this chapter","url":"\/43-23\/","token":"43\/1\/43-23","metadata":false},{"id":67717,"structure_id":14160,"section_number":"43-23.1","catch_line":"Forfeiture of lien","url":"\/43-23.1\/","token":"43\/1\/43-23.1","metadata":false},{"id":55321,"structure_id":14160,"section_number":"43-23.2","catch_line":"Remedies cumulative","url":"\/43-23.2\/","token":"43\/1\/43-23.2","metadata":false},{"id":75637,"structure_id":14160,"section_number":"43-3","catch_line":"Lien for work done and materials furnished; waiver of right to file or enforce lien","url":"\/43-3\/","token":"43\/1\/43-3","metadata":false},{"id":75853,"structure_id":14160,"section_number":"43-4","catch_line":"Perfection of lien by general contractor; recordation and notice","url":"\/43-4\/","token":"43\/1\/43-4","metadata":false},{"id":73387,"structure_id":14160,"section_number":"43-4.01","catch_line":"Posting of building permit; identification of mechanics' lien agent in building permit; notice to mechanics' lien agent; effect of notice","url":"\/43-4.01\/","token":"43\/1\/43-4.01","metadata":false},{"id":66257,"structure_id":14160,"section_number":"43-4.1","catch_line":"Liens to be recorded in deed books and indexed in general index of deeds","url":"\/43-4.1\/","token":"43\/1\/43-4.1","metadata":false},{"id":83985,"structure_id":14160,"section_number":"43-5","catch_line":"Sufficiency of memorandum and affidavit required by \u00a7 43-4","url":"\/43-5\/","token":"43\/1\/43-5","metadata":false},{"id":61637,"structure_id":14160,"section_number":"43-6","catch_line":"Repealed","url":"\/43-6\/","token":"43\/1\/43-6","metadata":false},{"id":79054,"structure_id":14160,"section_number":"43-7","catch_line":"Perfection of lien by subcontractor; extent of lien; affirmative defense; provisions relating to time-share estates","url":"\/43-7\/","token":"43\/1\/43-7","metadata":false},{"id":81789,"structure_id":14160,"section_number":"43-8","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-7","url":"\/43-8\/","token":"43\/1\/43-8","metadata":false},{"id":66394,"structure_id":14160,"section_number":"43-9","catch_line":"Perfection of lien by person performing labor or furnishing materials for a subcontractor; extent of lien","url":"\/43-9\/","token":"43\/1\/43-9","metadata":false}],"previous_section":{"id":66035,"structure_id":14160,"section_number":"43-15","catch_line":"Inaccuracies in memorandum or description not affecting lien","url":"\/43-15\/","token":"43\/1\/43-15","metadata":false},"next_section":{"id":68827,"structure_id":14160,"section_number":"43-17","catch_line":"Limitation on suit to enforce lien","url":"\/43-17\/","token":"43\/1\/43-17","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/43-16\/","history_text":false,"references":false,"refers_to":false,"permalink":{"id":221313,"object_type":"law","relational_id":55414,"identifier":"43-16","token":"43\/1\/43-16","url":"\/43-16\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/43-16\/","token":"43\/1\/43-16","dublin_core":{"Title":"What owner may do when contractor fails or refuses to complete building, etc","Type":"Text","Format":"text\/html","Identifier":"\u00a7 43-16","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>If the owner is compelled to complete his building, structure, or railroad, or any part thereof undertaken by a general contractor in consequence of the failure or refusal of the general contractor to do so, the amount expended by the owner for such completion shall have priority over all mechanics&#8217; <span class=\"dictionary\">liens<\/span> which have been or may be placed on such building, structure, or railroad by such general contractor, a subcontractor under him, or any person furnishing labor or <span class=\"dictionary\">materials<\/span> to either of them.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nWHAT OWNER MAY DO WHEN CONTRACTOR FAILS OR REFUSES TO COMPLETE BUILDING, ETC (\u00a7\n43-16)\n\nIf the owner is compelled to complete his building, structure, or railroad, or\nany part thereof undertaken by a general contractor in consequence of the\nfailure or refusal of the general contractor to do so, the amount expended by\nthe owner for such completion shall have priority over all mechanics&#8217;\nliens which have been or may be placed on such building, structure, or railroad\nby such general contractor, a subcontractor under him, or any person furnishing\nlabor or materials to either of them.\n\nHISTORY: Code 1919, \u00a7 6432.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}