{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/43-18.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/43-18.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/43-18.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/43-18.html"}],"law_id":57819,"edition_id":1,"section_id":57819,"structure_id":14160,"section_number":"43-18","catch_line":"Lien of general contractor to inure to benefit of subcontractor","history":"Code 1919, \u00a7 6434.","full_text":"The perfected lien of a general contractor on any building or structure shall inure to the benefit of any subcontractor, and of any person performing labor or furnishing materials to a subcontractor who has not perfected a lien on such building or structure, provided such subcontractor, or person performing labor or furnishing materials shall give written notice of his claim against the general contractor, or subcontractor, as the case may be, to the owner or his agent before the amount of such lien is actually paid off or discharged.","order_by":null,"text":{"0":{"id":211734,"text":"The perfected lien of a general contractor on any building or structure shall inure to the benefit of any subcontractor, and of any person performing labor or furnishing materials to a subcontractor who has not perfected a lien on such building or structure, provided such subcontractor, or person performing labor or furnishing materials shall give written notice of his claim against the general contractor, or subcontractor, as the case may be, to the owner or his agent before the amount of such lien is actually paid off or discharged.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14160,"edition_id":1,"name":"Mechanics' and Materialmen's Liens","identifier":"1","label":"chapter","depth":2,"order_by":1,"parent_id":14159,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221267,"object_type":"structure","relational_id":14160,"identifier":"1","token":"43\/1","url":"\/43\/1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":14159,"edition_id":1,"name":"Mechanics' and Certain Other Liens","identifier":"43","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:47:04","date_modified":"2026-06-26 03:47:04","permalink":{"id":221265,"object_type":"structure","relational_id":14159,"identifier":"43","token":"43","url":"\/43\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":81902,"structure_id":14160,"section_number":"43-1","catch_line":"Definitions","url":"\/43-1\/","token":"43\/1\/43-1","metadata":false},{"id":72410,"structure_id":14160,"section_number":"43-10","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-9","url":"\/43-10\/","token":"43\/1\/43-10","metadata":false},{"id":55337,"structure_id":14160,"section_number":"43-11","catch_line":"How owner or general contractor made personally liable to subcontractor, laborer or materialman","url":"\/43-11\/","token":"43\/1\/43-11","metadata":false},{"id":79868,"structure_id":14160,"section_number":"43-12","catch_line":"Repealed","url":"\/43-12\/","token":"43\/1\/43-12","metadata":false},{"id":64540,"structure_id":14160,"section_number":"43-13","catch_line":"Funds paid to general contractor or subcontractor must be used to pay persons performing labor or furnishing material","url":"\/43-13\/","token":"43\/1\/43-13","metadata":false},{"id":69845,"structure_id":14160,"section_number":"43-13.1","catch_line":"Use of lien waiver form; forgery or signing without authority","url":"\/43-13.1\/","token":"43\/1\/43-13.1","metadata":false},{"id":86055,"structure_id":14160,"section_number":"43-13.2","catch_line":"When an affidavit or a signed statement of payment required of owner prior to sale","url":"\/43-13.2\/","token":"43\/1\/43-13.2","metadata":false},{"id":80570,"structure_id":14160,"section_number":"43-13.3","catch_line":"An affidavit or a signed statement of payment required of owner prior to sale or refinance; penalty","url":"\/43-13.3\/","token":"43\/1\/43-13.3","metadata":false},{"id":79181,"structure_id":14160,"section_number":"43-14","catch_line":"Repealed","url":"\/43-14\/","token":"43\/1\/43-14","metadata":false},{"id":71794,"structure_id":14160,"section_number":"43-14.1","catch_line":"Service of notices","url":"\/43-14.1\/","token":"43\/1\/43-14.1","metadata":false},{"id":66035,"structure_id":14160,"section_number":"43-15","catch_line":"Inaccuracies in memorandum or description not affecting lien","url":"\/43-15\/","token":"43\/1\/43-15","metadata":false},{"id":55414,"structure_id":14160,"section_number":"43-16","catch_line":"What owner may do when contractor fails or refuses to complete building, etc","url":"\/43-16\/","token":"43\/1\/43-16","metadata":false},{"id":68827,"structure_id":14160,"section_number":"43-17","catch_line":"Limitation on suit to enforce lien","url":"\/43-17\/","token":"43\/1\/43-17","metadata":false},{"id":71472,"structure_id":14160,"section_number":"43-17.1","catch_line":"Hearing on validity of lien","url":"\/43-17.1\/","token":"43\/1\/43-17.1","metadata":false},{"id":57819,"structure_id":14160,"section_number":"43-18","catch_line":"Lien of general contractor to inure to benefit of subcontractor","url":"\/43-18\/","token":"43\/1\/43-18","metadata":false},{"id":58965,"structure_id":14160,"section_number":"43-19","catch_line":"Validity and priority of lien not affected by assignments","url":"\/43-19\/","token":"43\/1\/43-19","metadata":false},{"id":61935,"structure_id":14160,"section_number":"43-2","catch_line":"Structures, materials, etc., deemed permanently annexed to freehold","url":"\/43-2\/","token":"43\/1\/43-2","metadata":false},{"id":66681,"structure_id":14160,"section_number":"43-20","catch_line":"Extent of lien where owner has less than fee in land","url":"\/43-20\/","token":"43\/1\/43-20","metadata":false},{"id":66928,"structure_id":14160,"section_number":"43-21","catch_line":"Priorities between mechanics' and other liens","url":"\/43-21\/","token":"43\/1\/43-21","metadata":false},{"id":68364,"structure_id":14160,"section_number":"43-22","catch_line":"How liens enforced","url":"\/43-22\/","token":"43\/1\/43-22","metadata":false},{"id":72370,"structure_id":14160,"section_number":"43-23","catch_line":"Priority among liens perfected under this chapter","url":"\/43-23\/","token":"43\/1\/43-23","metadata":false},{"id":67717,"structure_id":14160,"section_number":"43-23.1","catch_line":"Forfeiture of lien","url":"\/43-23.1\/","token":"43\/1\/43-23.1","metadata":false},{"id":55321,"structure_id":14160,"section_number":"43-23.2","catch_line":"Remedies cumulative","url":"\/43-23.2\/","token":"43\/1\/43-23.2","metadata":false},{"id":75637,"structure_id":14160,"section_number":"43-3","catch_line":"Lien for work done and materials furnished; waiver of right to file or enforce lien","url":"\/43-3\/","token":"43\/1\/43-3","metadata":false},{"id":75853,"structure_id":14160,"section_number":"43-4","catch_line":"Perfection of lien by general contractor; recordation and notice","url":"\/43-4\/","token":"43\/1\/43-4","metadata":false},{"id":73387,"structure_id":14160,"section_number":"43-4.01","catch_line":"Posting of building permit; identification of mechanics' lien agent in building permit; notice to mechanics' lien agent; effect of notice","url":"\/43-4.01\/","token":"43\/1\/43-4.01","metadata":false},{"id":66257,"structure_id":14160,"section_number":"43-4.1","catch_line":"Liens to be recorded in deed books and indexed in general index of deeds","url":"\/43-4.1\/","token":"43\/1\/43-4.1","metadata":false},{"id":83985,"structure_id":14160,"section_number":"43-5","catch_line":"Sufficiency of memorandum and affidavit required by \u00a7 43-4","url":"\/43-5\/","token":"43\/1\/43-5","metadata":false},{"id":61637,"structure_id":14160,"section_number":"43-6","catch_line":"Repealed","url":"\/43-6\/","token":"43\/1\/43-6","metadata":false},{"id":79054,"structure_id":14160,"section_number":"43-7","catch_line":"Perfection of lien by subcontractor; extent of lien; affirmative defense; provisions relating to time-share estates","url":"\/43-7\/","token":"43\/1\/43-7","metadata":false},{"id":81789,"structure_id":14160,"section_number":"43-8","catch_line":"Sufficiency of memorandum, affidavit and notice required by \u00a7 43-7","url":"\/43-8\/","token":"43\/1\/43-8","metadata":false},{"id":66394,"structure_id":14160,"section_number":"43-9","catch_line":"Perfection of lien by person performing labor or furnishing materials for a subcontractor; extent of lien","url":"\/43-9\/","token":"43\/1\/43-9","metadata":false}],"previous_section":{"id":71472,"structure_id":14160,"section_number":"43-17.1","catch_line":"Hearing on validity of lien","url":"\/43-17.1\/","token":"43\/1\/43-17.1","metadata":false},"next_section":{"id":58965,"structure_id":14160,"section_number":"43-19","catch_line":"Validity and priority of lien not affected by assignments","url":"\/43-19\/","token":"43\/1\/43-19","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/43-18\/","history_text":false,"references":[{"id":71472,"section_number":"43-17.1","catch_line":"Hearing on validity of lien","order_by":null,"url":"\/43-17.1\/"}],"refers_to":false,"permalink":{"id":221325,"object_type":"law","relational_id":57819,"identifier":"43-18","token":"43\/1\/43-18","url":"\/43-18\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/43-18\/","token":"43\/1\/43-18","dublin_core":{"Title":"Lien of general contractor to inure to benefit of subcontractor","Type":"Text","Format":"text\/html","Identifier":"\u00a7 43-18","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The perfected <span class=\"dictionary\">lien<\/span> of a general contractor on any building or structure shall inure to the benefit of any subcontractor, and of any person performing labor or furnishing <span class=\"dictionary\">materials<\/span> to a subcontractor who has not perfected a <span class=\"dictionary\">lien<\/span> on such building or structure, provided such subcontractor, or person performing labor or furnishing <span class=\"dictionary\">materials<\/span> shall give written notice of his claim against the general contractor, or subcontractor, as the case may be, to the owner or his agent before the amount of such <span class=\"dictionary\">lien<\/span> is actually paid off or discharged.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nLIEN OF GENERAL CONTRACTOR TO INURE TO BENEFIT OF SUBCONTRACTOR (\u00a7 43-18)\n\nThe perfected lien of a general contractor on any building or structure shall\ninure to the benefit of any subcontractor, and of any person performing labor or\nfurnishing materials to a subcontractor who has not perfected a lien on such\nbuilding or structure, provided such subcontractor, or person performing labor\nor furnishing materials shall give written notice of his claim against the\ngeneral contractor, or subcontractor, as the case may be, to the owner or his\nagent before the amount of such lien is actually paid off or discharged.\n\nHISTORY: Code 1919, \u00a7 6434.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}