{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/45.2-1012.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/45.2-1012.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/45.2-1012.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/45.2-1012.html"}],"law_id":54700,"edition_id":1,"section_id":54700,"structure_id":13541,"section_number":"45.2-1012","catch_line":" Revision of permits","history":"1979, c. 290, \u00a7 45.1-236; 1984, c. 590; 2021, Sp. Sess. I, c. 387.","full_text":"A\n\nThe process for revision of a permit is as follows:1\n\nDuring the term of a permit, the permittee may submit an application for a revision of such permit, together with a revised operation plan and reclamation plan, to the Director.2\n\nAn application for a revision of a permit shall not be approved unless the Director finds that reclamation as required by the federal act and state regulations can be accomplished under the revised reclamation plan. The Director shall establish by regulation the period of time within which the revision shall be approved or disapproved, as well as parameters for a determination of the scale or extent of a revision request for which all permit application information requirements and procedures, including notice and hearings, shall apply; however, any revisions that propose significant alterations in the operation plan or reclamation plan shall, at a minimum, be subject to notice and hearing requirements.3\n\nAny extension to the area covered by the permit, except an insignificant boundary revision, shall be made by application for another permit.B\n\nThe Director shall, within a time limit prescribed in regulations adopted by him, review each outstanding permit and may require reasonable revision or modification of the permit provisions during the term of any permit; however, such revision or modification shall be based upon a written finding and subject to notice and hearing requirements.","order_by":null,"text":{"0":{"id":200811,"text":"The process for revision of a permit is as follows:","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"A1"},"1":{"id":200812,"text":"During the term of a permit, the permittee may submit an application for a revision of such permit, together with a revised operation plan and reclamation plan, to the Director.","type":"section","prefixes":["A","1"],"prefix":"1","entire_prefix":"A1","prefix_anchor":"A1","level":2,"prior_prefix":"A","next_prefix":"A2"},"2":{"id":200813,"text":"An application for a revision of a permit shall not be approved unless the Director finds that reclamation as required by the federal act and state regulations can be accomplished under the revised reclamation plan. The Director shall establish by regulation the period of time within which the revision shall be approved or disapproved, as well as parameters for a determination of the scale or extent of a revision request for which all permit application information requirements and procedures, including notice and hearings, shall apply; however, any revisions that propose significant alterations in the operation plan or reclamation plan shall, at a minimum, be subject to notice and hearing requirements.","type":"section","prefixes":["A","2"],"prefix":"2","entire_prefix":"A2","prefix_anchor":"A2","level":2,"prior_prefix":"A1","next_prefix":"A3"},"3":{"id":200814,"text":"Any extension to the area covered by the permit, except an insignificant boundary revision, shall be made by application for another permit.","type":"section","prefixes":["A","3"],"prefix":"3","entire_prefix":"A3","prefix_anchor":"A3","level":2,"prior_prefix":"A2","next_prefix":"B"},"4":{"id":200815,"text":"The Director shall, within a time limit prescribed in regulations adopted by him, review each outstanding permit and may require reasonable revision or modification of the permit provisions during the term of any permit; however, such revision or modification shall be based upon a written finding and subject to notice and hearing requirements.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A3"}},"ancestry":[{"id":13541,"edition_id":1,"name":"Regulation of Mining Activity","identifier":"2","label":"article","depth":5,"order_by":1,"parent_id":13540,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223733,"object_type":"structure","relational_id":13541,"identifier":"2","token":"45.2\/II\/C\/10\/2","url":"\/45.2\/II\/C\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13540,"edition_id":1,"name":"Virginia Coal Surface Mining Control and Reclamation Act of 1979","identifier":"10","label":"chapter","depth":4,"order_by":1,"parent_id":13539,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223697,"object_type":"structure","relational_id":13540,"identifier":"10","token":"45.2\/II\/C\/10","url":"\/45.2\/II\/C\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13539,"edition_id":1,"name":"Surface Coal Mines","identifier":"C","label":"part","depth":3,"order_by":1,"parent_id":12985,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223695,"object_type":"structure","relational_id":13539,"identifier":"C","token":"45.2\/II\/C","url":"\/45.2\/II\/C\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12985,"edition_id":1,"name":"Coal Mining","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12713,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":222647,"object_type":"structure","relational_id":12985,"identifier":"II","token":"45.2\/II","url":"\/45.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12713,"edition_id":1,"name":"Mines, Minerals, and Energy","identifier":"45.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":222539,"object_type":"structure","relational_id":12713,"identifier":"45.2","token":"45.2","url":"\/45.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":59248,"structure_id":13541,"section_number":"45.2-1008","catch_line":" Coal exploration operations","url":"\/45.2-1008\/","token":"45.2\/II\/C\/10\/2\/45.2-1008","metadata":false},{"id":68698,"structure_id":13541,"section_number":"45.2-1009","catch_line":" Permit required for coal surface mining operation; term; transfer, etc","url":"\/45.2-1009\/","token":"45.2\/II\/C\/10\/2\/45.2-1009","metadata":false},{"id":63876,"structure_id":13541,"section_number":"45.2-1010","catch_line":" Form and contents of permit application; fee","url":"\/45.2-1010\/","token":"45.2\/II\/C\/10\/2\/45.2-1010","metadata":false},{"id":69681,"structure_id":13541,"section_number":"45.2-1011","catch_line":" Operation and reclamation plans","url":"\/45.2-1011\/","token":"45.2\/II\/C\/10\/2\/45.2-1011","metadata":false},{"id":54700,"structure_id":13541,"section_number":"45.2-1012","catch_line":" Revision of permits","url":"\/45.2-1012\/","token":"45.2\/II\/C\/10\/2\/45.2-1012","metadata":false},{"id":80707,"structure_id":13541,"section_number":"45.2-1013","catch_line":" Approval or denial of permit","url":"\/45.2-1013\/","token":"45.2\/II\/C\/10\/2\/45.2-1013","metadata":false},{"id":81130,"structure_id":13541,"section_number":"45.2-1014","catch_line":" Public participation in process of issuing or revising permits","url":"\/45.2-1014\/","token":"45.2\/II\/C\/10\/2\/45.2-1014","metadata":false},{"id":76504,"structure_id":13541,"section_number":"45.2-1015","catch_line":" Decision of Director upon permit application; hearing; appeal","url":"\/45.2-1015\/","token":"45.2\/II\/C\/10\/2\/45.2-1015","metadata":false},{"id":64109,"structure_id":13541,"section_number":"45.2-1016","catch_line":" Performance bonds","url":"\/45.2-1016\/","token":"45.2\/II\/C\/10\/2\/45.2-1016","metadata":false},{"id":74259,"structure_id":13541,"section_number":"45.2-1017","catch_line":" Performance standards","url":"\/45.2-1017\/","token":"45.2\/II\/C\/10\/2\/45.2-1017","metadata":false},{"id":84028,"structure_id":13541,"section_number":"45.2-1018","catch_line":" Surface effects of underground coal mining operations","url":"\/45.2-1018\/","token":"45.2\/II\/C\/10\/2\/45.2-1018","metadata":false},{"id":84230,"structure_id":13541,"section_number":"45.2-1019","catch_line":" Inspections and monitoring","url":"\/45.2-1019\/","token":"45.2\/II\/C\/10\/2\/45.2-1019","metadata":false},{"id":54505,"structure_id":13541,"section_number":"45.2-1020","catch_line":" Enforcement of chapter generally","url":"\/45.2-1020\/","token":"45.2\/II\/C\/10\/2\/45.2-1020","metadata":false},{"id":84596,"structure_id":13541,"section_number":"45.2-1021","catch_line":" Civil and criminal penalties","url":"\/45.2-1021\/","token":"45.2\/II\/C\/10\/2\/45.2-1021","metadata":false},{"id":80009,"structure_id":13541,"section_number":"45.2-1022","catch_line":" Citizen suits; rights of citizens to accompany inspectors","url":"\/45.2-1022\/","token":"45.2\/II\/C\/10\/2\/45.2-1022","metadata":false},{"id":61906,"structure_id":13541,"section_number":"45.2-1023","catch_line":" Forfeiture or release of performance bond","url":"\/45.2-1023\/","token":"45.2\/II\/C\/10\/2\/45.2-1023","metadata":false},{"id":84157,"structure_id":13541,"section_number":"45.2-1024","catch_line":" Performance of reclamation operations by Director","url":"\/45.2-1024\/","token":"45.2\/II\/C\/10\/2\/45.2-1024","metadata":false},{"id":54560,"structure_id":13541,"section_number":"45.2-1025","catch_line":" Administrative review of notice or order issued under \u00a7 45.2-1020","url":"\/45.2-1025\/","token":"45.2\/II\/C\/10\/2\/45.2-1025","metadata":false},{"id":86764,"structure_id":13541,"section_number":"45.2-1026","catch_line":" Hearings","url":"\/45.2-1026\/","token":"45.2\/II\/C\/10\/2\/45.2-1026","metadata":false},{"id":76733,"structure_id":13541,"section_number":"45.2-1027","catch_line":" Judicial review of final order or decision or decision under \u00a7 45.2-1035","url":"\/45.2-1027\/","token":"45.2\/II\/C\/10\/2\/45.2-1027","metadata":false},{"id":61010,"structure_id":13541,"section_number":"45.2-1028","catch_line":" Designating areas unsuitable for coal surface mining","url":"\/45.2-1028\/","token":"45.2\/II\/C\/10\/2\/45.2-1028","metadata":false}],"previous_section":{"id":69681,"structure_id":13541,"section_number":"45.2-1011","catch_line":" Operation and reclamation plans","url":"\/45.2-1011\/","token":"45.2\/II\/C\/10\/2\/45.2-1011","metadata":false},"next_section":{"id":80707,"structure_id":13541,"section_number":"45.2-1013","catch_line":" Approval or denial of permit","url":"\/45.2-1013\/","token":"45.2\/II\/C\/10\/2\/45.2-1013","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/45.2-1012\/","history_text":"<p>This law was first created in 1979. The record of its establishment is cataloged in chapter 290 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1979 \u201cActs\u201d aren\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 1984, chapter 590.<\/p>","references":false,"refers_to":false,"permalink":{"id":223751,"object_type":"law","relational_id":54700,"identifier":"45.2-1012","token":"45.2\/II\/C\/10\/2\/45.2-1012","url":"\/45.2-1012\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/45.2-1012\/","token":"45.2\/II\/C\/10\/2\/45.2-1012","dublin_core":{"Title":" Revision of permits","Type":"Text","Format":"text\/html","Identifier":"\u00a7 45.2-1012","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The process for revision of a <span class=\"dictionary\">permit<\/span> is as follows: <a id=\"paragraph-200811\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1012\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> During the term of a <span class=\"dictionary\">permit<\/span>, the <span class=\"dictionary\">permittee<\/span> may submit an application for a revision of such <span class=\"dictionary\">permit<\/span>, together with a revised operation plan and reclamation plan, to the <span class=\"dictionary\">Director<\/span>. <a id=\"paragraph-200812\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1012\/#A1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> An application for a revision of a <span class=\"dictionary\">permit<\/span> shall not be approved unless the <span class=\"dictionary\">Director<\/span> finds that reclamation as required by the <span class=\"dictionary\">federal act<\/span> and <span class=\"dictionary\">state regulations<\/span> can be accomplished under the revised reclamation plan. The <span class=\"dictionary\">Director<\/span> shall establish by regulation the period of time within which the revision shall be approved or disapproved, as well as parameters for a determination of the scale or extent of a revision request for which all <span class=\"dictionary\">permit<\/span> application information requirements and procedures, including notice and <span class=\"dictionary\">hearings<\/span>, shall apply; however, any revisions that propose significant alterations in the operation plan or reclamation plan shall, at a minimum, be subject to notice and <span class=\"dictionary\">hearing<\/span> requirements. <a id=\"paragraph-200813\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1012\/#A2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Any extension to the area covered by the <span class=\"dictionary\">permit<\/span>, except an insignificant boundary revision, shall be made by application for another <span class=\"dictionary\">permit<\/span>. <a id=\"paragraph-200814\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1012\/#A3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The <span class=\"dictionary\">Director<\/span> shall, within a time limit prescribed in regulations adopted by him, review each outstanding <span class=\"dictionary\">permit<\/span> and may require reasonable revision or modification of the <span class=\"dictionary\">permit<\/span> provisions during the term of any <span class=\"dictionary\">permit<\/span>; however, such revision or modification shall be based upon a written <span class=\"dictionary\">finding<\/span> and subject to notice and <span class=\"dictionary\">hearing<\/span> requirements. <a id=\"paragraph-200815\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1012\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n REVISION OF PERMITS (\u00a7 45.2-1012)\n\nA. The process for revision of a permit is as follows:\n\n   1. During the term of a permit, the permittee may submit an application for a\n   revision of such permit, together with a revised operation plan and\n   reclamation plan, to the Director.\n\n   2. An application for a revision of a permit shall not be approved unless the\n   Director finds that reclamation as required by the federal act and state\n   regulations can be accomplished under the revised reclamation plan. The\n   Director shall establish by regulation the period of time within which the\n   revision shall be approved or disapproved, as well as parameters for a\n   determination of the scale or extent of a revision request for which all\n   permit application information requirements and procedures, including notice\n   and hearings, shall apply; however, any revisions that propose significant\n   alterations in the operation plan or reclamation plan shall, at a minimum, be\n   subject to notice and hearing requirements.\n\n   3. Any extension to the area covered by the permit, except an insignificant\n   boundary revision, shall be made by application for another permit.\n\nB. The Director shall, within a time limit prescribed in regulations adopted by\nhim, review each outstanding permit and may require reasonable revision or\nmodification of the permit provisions during the term of any permit; however,\nsuch revision or modification shall be based upon a written finding and subject\nto notice and hearing requirements.\n\nHISTORY: 1979, c. 290, \u00a7 45.1-236; 1984, c. 590; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}