{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/45.2-1014.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/45.2-1014.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/45.2-1014.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/45.2-1014.html"}],"law_id":81130,"edition_id":1,"section_id":81130,"structure_id":13541,"section_number":"45.2-1014","catch_line":" Public participation in process of issuing or revising permits","history":"1979, c. 290, \u00a7 45.1-239; 1984, c. 590; 2021, Sp. Sess. I, c. 387.","full_text":"A\n\nThe Director shall establish by regulation procedures for the notification of and participation by the public and appropriate federal, state, and local governmental authorities in the process for issuing or revising coal surface mining permits, in accordance with &#xA7; 513 of the federal act.B\n\nAny person having an interest that is or might be adversely affected, or the officer or head of any federal, state, or local governmental agency or authority, has the right to file written objections to the proposed initial or revised application for a permit for a coal surface mining operation with the Director within 30 days after the last publication of the applicant&#8217;s notice required by the regulation adopted pursuant to subsection A. If no written objection is filed and an informal hearing is requested, the Director shall then hold an informal hearing in the manner and location prescribed by regulation, unless every party requesting the informal hearing stipulates agreement prior to the requested informal hearing and withdraws such request therefor.","order_by":null,"text":{"0":{"id":290788,"text":"The Director shall establish by regulation procedures for the notification of and participation by the public and appropriate federal, state, and local governmental authorities in the process for issuing or revising coal surface mining permits, in accordance with &#xA7; 513 of the federal act.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":290789,"text":"Any person having an interest that is or might be adversely affected, or the officer or head of any federal, state, or local governmental agency or authority, has the right to file written objections to the proposed initial or revised application for a permit for a coal surface mining operation with the Director within 30 days after the last publication of the applicant&#8217;s notice required by the regulation adopted pursuant to subsection A. If no written objection is filed and an informal hearing is requested, the Director shall then hold an informal hearing in the manner and location prescribed by regulation, unless every party requesting the informal hearing stipulates agreement prior to the requested informal hearing and withdraws such request therefor.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A"}},"ancestry":[{"id":13541,"edition_id":1,"name":"Regulation of Mining Activity","identifier":"2","label":"article","depth":5,"order_by":1,"parent_id":13540,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223733,"object_type":"structure","relational_id":13541,"identifier":"2","token":"45.2\/II\/C\/10\/2","url":"\/45.2\/II\/C\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13540,"edition_id":1,"name":"Virginia Coal Surface Mining Control and Reclamation Act of 1979","identifier":"10","label":"chapter","depth":4,"order_by":1,"parent_id":13539,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223697,"object_type":"structure","relational_id":13540,"identifier":"10","token":"45.2\/II\/C\/10","url":"\/45.2\/II\/C\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13539,"edition_id":1,"name":"Surface Coal Mines","identifier":"C","label":"part","depth":3,"order_by":1,"parent_id":12985,"metadata":{},"date_created":"2026-06-26 03:45:10","date_modified":"2026-06-26 03:45:10","permalink":{"id":223695,"object_type":"structure","relational_id":13539,"identifier":"C","token":"45.2\/II\/C","url":"\/45.2\/II\/C\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12985,"edition_id":1,"name":"Coal Mining","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12713,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":222647,"object_type":"structure","relational_id":12985,"identifier":"II","token":"45.2\/II","url":"\/45.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12713,"edition_id":1,"name":"Mines, Minerals, and Energy","identifier":"45.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":222539,"object_type":"structure","relational_id":12713,"identifier":"45.2","token":"45.2","url":"\/45.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":59248,"structure_id":13541,"section_number":"45.2-1008","catch_line":" Coal exploration operations","url":"\/45.2-1008\/","token":"45.2\/II\/C\/10\/2\/45.2-1008","metadata":false},{"id":68698,"structure_id":13541,"section_number":"45.2-1009","catch_line":" Permit required for coal surface mining operation; term; transfer, etc","url":"\/45.2-1009\/","token":"45.2\/II\/C\/10\/2\/45.2-1009","metadata":false},{"id":63876,"structure_id":13541,"section_number":"45.2-1010","catch_line":" Form and contents of permit application; fee","url":"\/45.2-1010\/","token":"45.2\/II\/C\/10\/2\/45.2-1010","metadata":false},{"id":69681,"structure_id":13541,"section_number":"45.2-1011","catch_line":" Operation and reclamation plans","url":"\/45.2-1011\/","token":"45.2\/II\/C\/10\/2\/45.2-1011","metadata":false},{"id":54700,"structure_id":13541,"section_number":"45.2-1012","catch_line":" Revision of permits","url":"\/45.2-1012\/","token":"45.2\/II\/C\/10\/2\/45.2-1012","metadata":false},{"id":80707,"structure_id":13541,"section_number":"45.2-1013","catch_line":" Approval or denial of permit","url":"\/45.2-1013\/","token":"45.2\/II\/C\/10\/2\/45.2-1013","metadata":false},{"id":81130,"structure_id":13541,"section_number":"45.2-1014","catch_line":" Public participation in process of issuing or revising permits","url":"\/45.2-1014\/","token":"45.2\/II\/C\/10\/2\/45.2-1014","metadata":false},{"id":76504,"structure_id":13541,"section_number":"45.2-1015","catch_line":" Decision of Director upon permit application; hearing; appeal","url":"\/45.2-1015\/","token":"45.2\/II\/C\/10\/2\/45.2-1015","metadata":false},{"id":64109,"structure_id":13541,"section_number":"45.2-1016","catch_line":" Performance bonds","url":"\/45.2-1016\/","token":"45.2\/II\/C\/10\/2\/45.2-1016","metadata":false},{"id":74259,"structure_id":13541,"section_number":"45.2-1017","catch_line":" Performance standards","url":"\/45.2-1017\/","token":"45.2\/II\/C\/10\/2\/45.2-1017","metadata":false},{"id":84028,"structure_id":13541,"section_number":"45.2-1018","catch_line":" Surface effects of underground coal mining operations","url":"\/45.2-1018\/","token":"45.2\/II\/C\/10\/2\/45.2-1018","metadata":false},{"id":84230,"structure_id":13541,"section_number":"45.2-1019","catch_line":" Inspections and monitoring","url":"\/45.2-1019\/","token":"45.2\/II\/C\/10\/2\/45.2-1019","metadata":false},{"id":54505,"structure_id":13541,"section_number":"45.2-1020","catch_line":" Enforcement of chapter generally","url":"\/45.2-1020\/","token":"45.2\/II\/C\/10\/2\/45.2-1020","metadata":false},{"id":84596,"structure_id":13541,"section_number":"45.2-1021","catch_line":" Civil and criminal penalties","url":"\/45.2-1021\/","token":"45.2\/II\/C\/10\/2\/45.2-1021","metadata":false},{"id":80009,"structure_id":13541,"section_number":"45.2-1022","catch_line":" Citizen suits; rights of citizens to accompany inspectors","url":"\/45.2-1022\/","token":"45.2\/II\/C\/10\/2\/45.2-1022","metadata":false},{"id":61906,"structure_id":13541,"section_number":"45.2-1023","catch_line":" Forfeiture or release of performance bond","url":"\/45.2-1023\/","token":"45.2\/II\/C\/10\/2\/45.2-1023","metadata":false},{"id":84157,"structure_id":13541,"section_number":"45.2-1024","catch_line":" Performance of reclamation operations by Director","url":"\/45.2-1024\/","token":"45.2\/II\/C\/10\/2\/45.2-1024","metadata":false},{"id":54560,"structure_id":13541,"section_number":"45.2-1025","catch_line":" Administrative review of notice or order issued under \u00a7 45.2-1020","url":"\/45.2-1025\/","token":"45.2\/II\/C\/10\/2\/45.2-1025","metadata":false},{"id":86764,"structure_id":13541,"section_number":"45.2-1026","catch_line":" Hearings","url":"\/45.2-1026\/","token":"45.2\/II\/C\/10\/2\/45.2-1026","metadata":false},{"id":76733,"structure_id":13541,"section_number":"45.2-1027","catch_line":" Judicial review of final order or decision or decision under \u00a7 45.2-1035","url":"\/45.2-1027\/","token":"45.2\/II\/C\/10\/2\/45.2-1027","metadata":false},{"id":61010,"structure_id":13541,"section_number":"45.2-1028","catch_line":" Designating areas unsuitable for coal surface mining","url":"\/45.2-1028\/","token":"45.2\/II\/C\/10\/2\/45.2-1028","metadata":false}],"previous_section":{"id":80707,"structure_id":13541,"section_number":"45.2-1013","catch_line":" Approval or denial of permit","url":"\/45.2-1013\/","token":"45.2\/II\/C\/10\/2\/45.2-1013","metadata":false},"next_section":{"id":76504,"structure_id":13541,"section_number":"45.2-1015","catch_line":" Decision of Director upon permit application; hearing; appeal","url":"\/45.2-1015\/","token":"45.2\/II\/C\/10\/2\/45.2-1015","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/45.2-1014\/","history_text":"<p>This law was first created in 1979. The record of its establishment is cataloged in chapter 290 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1979 \u201cActs\u201d aren\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 1984, chapter 590.<\/p>","references":[{"id":76504,"section_number":"45.2-1015","catch_line":" Decision of Director upon permit application; hearing; appeal","order_by":null,"url":"\/45.2-1015\/"},{"id":61906,"section_number":"45.2-1023","catch_line":" Forfeiture or release of performance bond","order_by":null,"url":"\/45.2-1023\/"}],"refers_to":false,"permalink":{"id":223759,"object_type":"law","relational_id":81130,"identifier":"45.2-1014","token":"45.2\/II\/C\/10\/2\/45.2-1014","url":"\/45.2-1014\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/45.2-1014\/","token":"45.2\/II\/C\/10\/2\/45.2-1014","dublin_core":{"Title":" Public participation in process of issuing or revising permits","Type":"Text","Format":"text\/html","Identifier":"\u00a7 45.2-1014","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The <span class=\"dictionary\">Director<\/span> shall establish by regulation procedures for the notification of and participation by the public and appropriate federal, state, and local governmental authorities in the process for issuing or revising coal surface mining <span class=\"dictionary\">permits<\/span>, in accordance with &#xA7; 513 of the <span class=\"dictionary\">federal act<\/span>. <a id=\"paragraph-290788\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1014\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Any <span class=\"dictionary\">person<\/span> having an interest that is or might be adversely affected, or the officer or head of any federal, state, or local governmental agency or authority, has the right to file written objections to the proposed initial or revised application for a <span class=\"dictionary\">permit<\/span> for a coal surface mining operation with the <span class=\"dictionary\">Director<\/span> within 30 days after the last publication of the applicant&#8217;s notice required by the regulation adopted pursuant to subsection A. If no written objection is filed and an informal <span class=\"dictionary\">hearing<\/span> is requested, the <span class=\"dictionary\">Director<\/span> shall then hold an informal <span class=\"dictionary\">hearing<\/span> in the manner and location prescribed by regulation, unless every <span class=\"dictionary\">party<\/span> requesting the informal <span class=\"dictionary\">hearing<\/span> stipulates agreement prior to the requested informal <span class=\"dictionary\">hearing<\/span> and withdraws such request therefor. <a id=\"paragraph-290789\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-1014\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n PUBLIC PARTICIPATION IN PROCESS OF ISSUING OR REVISING PERMITS (\u00a7 45.2-1014)\n\nA. The Director shall establish by regulation procedures for the notification of\nand participation by the public and appropriate federal, state, and local\ngovernmental authorities in the process for issuing or revising coal surface\nmining permits, in accordance with &#xA7; 513 of the federal act.\n\nB. Any person having an interest that is or might be adversely affected, or the\nofficer or head of any federal, state, or local governmental agency or\nauthority, has the right to file written objections to the proposed initial or\nrevised application for a permit for a coal surface mining operation with the\nDirector within 30 days after the last publication of the applicant&#8217;s\nnotice required by the regulation adopted pursuant to subsection A. If no\nwritten objection is filed and an informal hearing is requested, the Director\nshall then hold an informal hearing in the manner and location prescribed by\nregulation, unless every party requesting the informal hearing stipulates\nagreement prior to the requested informal hearing and withdraws such request\ntherefor.\n\nHISTORY: 1979, c. 290, \u00a7 45.1-239; 1984, c. 590; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}