{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/45.2-1225.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/45.2-1225.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/45.2-1225.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/45.2-1225.html"}],"law_id":75634,"edition_id":1,"section_id":75634,"structure_id":14081,"section_number":"45.2-1225","catch_line":" Injunction prohibiting mining operation","history":"1977, c. 312, \u00a7 45.1-193.1; 2021, Sp. Sess. I, c. 387.","full_text":"Whenever adverse ecological disruptions or the injurious effects thereof seriously threaten or endanger the health, safety, welfare, or property rights of citizens of the Commonwealth, and abatement by the application of control techniques is not feasible, the Director shall petition the appropriate circuit court for an injunction to prohibit further operations. Such injunction shall not relieve the operator of the duty to reclaim lands previously affected according to the terms and conditions of the applicable permit.","order_by":null,"text":{"0":{"id":271650,"text":"Whenever adverse ecological disruptions or the injurious effects thereof seriously threaten or endanger the health, safety, welfare, or property rights of citizens of the Commonwealth, and abatement by the application of control techniques is not feasible, the Director shall petition the appropriate circuit court for an injunction to prohibit further operations. Such injunction shall not relieve the operator of the duty to reclaim lands previously affected according to the terms and conditions of the applicable permit.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14081,"edition_id":1,"name":"Regulation of Mining Activity","identifier":"2","label":"article","depth":5,"order_by":1,"parent_id":13016,"metadata":{},"date_created":"2026-06-26 03:46:49","date_modified":"2026-06-26 03:46:49","permalink":{"id":224425,"object_type":"structure","relational_id":14081,"identifier":"2","token":"45.2\/III\/A\/12\/2","url":"\/45.2\/III\/A\/12\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13016,"edition_id":1,"name":"Permits for Certain Mining Operations; Reclamation of Land","identifier":"12","label":"chapter","depth":4,"order_by":1,"parent_id":12950,"metadata":{},"date_created":"2026-06-26 03:44:09","date_modified":"2026-06-26 03:44:09","permalink":{"id":224405,"object_type":"structure","relational_id":13016,"identifier":"12","token":"45.2\/III\/A\/12","url":"\/45.2\/III\/A\/12\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12950,"edition_id":1,"name":"Mineral Mines Generally","identifier":"A","label":"part","depth":3,"order_by":1,"parent_id":12949,"metadata":{},"date_created":"2026-06-26 03:44:04","date_modified":"2026-06-26 03:44:04","permalink":{"id":224111,"object_type":"structure","relational_id":12950,"identifier":"A","token":"45.2\/III\/A","url":"\/45.2\/III\/A\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12949,"edition_id":1,"name":"Mineral Mines","identifier":"III","label":"subtitle","depth":2,"order_by":1,"parent_id":12713,"metadata":{},"date_created":"2026-06-26 03:44:04","date_modified":"2026-06-26 03:44:04","permalink":{"id":224109,"object_type":"structure","relational_id":12949,"identifier":"III","token":"45.2\/III","url":"\/45.2\/III\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12713,"edition_id":1,"name":"Mines, Minerals, and Energy","identifier":"45.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":222539,"object_type":"structure","relational_id":12713,"identifier":"45.2","token":"45.2","url":"\/45.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":57389,"structure_id":14081,"section_number":"45.2-1204","catch_line":" Permit Fee Fund","url":"\/45.2-1204\/","token":"45.2\/III\/A\/12\/2\/45.2-1204","metadata":false},{"id":76591,"structure_id":14081,"section_number":"45.2-1205","catch_line":" Permit required; fee; renewal fee; application; furnishing copy of map, etc., to landowner; approval by Department","url":"\/45.2-1205\/","token":"45.2\/III\/A\/12\/2\/45.2-1205","metadata":false},{"id":66753,"structure_id":14081,"section_number":"45.2-1206","catch_line":" Operations plan; reclamation; policy of Director","url":"\/45.2-1206\/","token":"45.2\/III\/A\/12\/2\/45.2-1206","metadata":false},{"id":79925,"structure_id":14081,"section_number":"45.2-1207","catch_line":" Special Reclamation Fund","url":"\/45.2-1207\/","token":"45.2\/III\/A\/12\/2\/45.2-1207","metadata":false},{"id":67921,"structure_id":14081,"section_number":"45.2-1208","catch_line":" Bond of operator","url":"\/45.2-1208\/","token":"45.2\/III\/A\/12\/2\/45.2-1208","metadata":false},{"id":74570,"structure_id":14081,"section_number":"45.2-1209","catch_line":" Review of operations plan and reclamation provision by Director; issuance of permit","url":"\/45.2-1209\/","token":"45.2\/III\/A\/12\/2\/45.2-1209","metadata":false},{"id":59664,"structure_id":14081,"section_number":"45.2-1210","catch_line":" Application for permit; adjoining landowners; local official","url":"\/45.2-1210\/","token":"45.2\/III\/A\/12\/2\/45.2-1210","metadata":false},{"id":87330,"structure_id":14081,"section_number":"45.2-1211","catch_line":" Succession of one operator by another at uncompleted project","url":"\/45.2-1211\/","token":"45.2\/III\/A\/12\/2\/45.2-1211","metadata":false},{"id":79992,"structure_id":14081,"section_number":"45.2-1212","catch_line":" Additional bond to be posted annually; release of previous bond; report of reclamation work","url":"\/45.2-1212\/","token":"45.2\/III\/A\/12\/2\/45.2-1212","metadata":false},{"id":76291,"structure_id":14081,"section_number":"45.2-1213","catch_line":" Notice of noncompliance served on operator","url":"\/45.2-1213\/","token":"45.2\/III\/A\/12\/2\/45.2-1213","metadata":false},{"id":71516,"structure_id":14081,"section_number":"45.2-1214","catch_line":" Collection of debts","url":"\/45.2-1214\/","token":"45.2\/III\/A\/12\/2\/45.2-1214","metadata":false},{"id":74309,"structure_id":14081,"section_number":"45.2-1215","catch_line":" Commonwealth to have lien for reclamation work","url":"\/45.2-1215\/","token":"45.2\/III\/A\/12\/2\/45.2-1215","metadata":false},{"id":56748,"structure_id":14081,"section_number":"45.2-1216","catch_line":" Perfection of lien; waiver of lien","url":"\/45.2-1216\/","token":"45.2\/III\/A\/12\/2\/45.2-1216","metadata":false},{"id":80040,"structure_id":14081,"section_number":"45.2-1217","catch_line":" Recordation and indexing of lien; notice","url":"\/45.2-1217\/","token":"45.2\/III\/A\/12\/2\/45.2-1217","metadata":false},{"id":56293,"structure_id":14081,"section_number":"45.2-1218","catch_line":" Priority of lien","url":"\/45.2-1218\/","token":"45.2\/III\/A\/12\/2\/45.2-1218","metadata":false},{"id":55327,"structure_id":14081,"section_number":"45.2-1219","catch_line":" Hearing to determine amount of lien","url":"\/45.2-1219\/","token":"45.2\/III\/A\/12\/2\/45.2-1219","metadata":false},{"id":63524,"structure_id":14081,"section_number":"45.2-1220","catch_line":" Satisfaction of lien","url":"\/45.2-1220\/","token":"45.2\/III\/A\/12\/2\/45.2-1220","metadata":false},{"id":71624,"structure_id":14081,"section_number":"45.2-1221","catch_line":" Additional bond to cover amended estimate of land to be disturbed","url":"\/45.2-1221\/","token":"45.2\/III\/A\/12\/2\/45.2-1221","metadata":false},{"id":55202,"structure_id":14081,"section_number":"45.2-1222","catch_line":" Interference with reclamation unlawful; other mining operations on land","url":"\/45.2-1222\/","token":"45.2\/III\/A\/12\/2\/45.2-1222","metadata":false},{"id":77225,"structure_id":14081,"section_number":"45.2-1223","catch_line":" Penalty for violation of chapter, etc","url":"\/45.2-1223\/","token":"45.2\/III\/A\/12\/2\/45.2-1223","metadata":false},{"id":65319,"structure_id":14081,"section_number":"45.2-1224","catch_line":" Assistance of federal, state, and local agencies","url":"\/45.2-1224\/","token":"45.2\/III\/A\/12\/2\/45.2-1224","metadata":false},{"id":75634,"structure_id":14081,"section_number":"45.2-1225","catch_line":" Injunction prohibiting mining operation","url":"\/45.2-1225\/","token":"45.2\/III\/A\/12\/2\/45.2-1225","metadata":false},{"id":66111,"structure_id":14081,"section_number":"45.2-1226","catch_line":" Appeals from decisions of the Department","url":"\/45.2-1226\/","token":"45.2\/III\/A\/12\/2\/45.2-1226","metadata":false},{"id":63526,"structure_id":14081,"section_number":"45.2-1227","catch_line":" Local standards and regulations; waiver of application of chapter; review for strict compliance with chapter","url":"\/45.2-1227\/","token":"45.2\/III\/A\/12\/2\/45.2-1227","metadata":false}],"previous_section":{"id":65319,"structure_id":14081,"section_number":"45.2-1224","catch_line":" Assistance of federal, state, and local agencies","url":"\/45.2-1224\/","token":"45.2\/III\/A\/12\/2\/45.2-1224","metadata":false},"next_section":{"id":66111,"structure_id":14081,"section_number":"45.2-1226","catch_line":" Appeals from decisions of the Department","url":"\/45.2-1226\/","token":"45.2\/III\/A\/12\/2\/45.2-1226","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/45.2-1225\/","history_text":"<p>This law was first created in 1977. The record of its establishment is cataloged in chapter 312 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1977 \u201cActs\u201d aren\u2019t available online.<\/p>","references":[{"id":71828,"section_number":"45.2-1202","catch_line":" Authority of Director; enforcement of chapter by injunction","order_by":null,"url":"\/45.2-1202\/"}],"refers_to":false,"permalink":{"id":224511,"object_type":"law","relational_id":75634,"identifier":"45.2-1225","token":"45.2\/III\/A\/12\/2\/45.2-1225","url":"\/45.2-1225\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/45.2-1225\/","token":"45.2\/III\/A\/12\/2\/45.2-1225","dublin_core":{"Title":" Injunction prohibiting mining operation","Type":"Text","Format":"text\/html","Identifier":"\u00a7 45.2-1225","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>Whenever adverse ecological disruptions or the injurious effects thereof seriously threaten or endanger the health, safety, welfare, or property rights of citizens of the Commonwealth, and abatement by the application of control techniques is not feasible, the <span class=\"dictionary\">Director<\/span> shall <span class=\"dictionary\">petition<\/span> the appropriate <span class=\"dictionary\">circuit<\/span> <span class=\"dictionary\">court<\/span> for an <span class=\"dictionary\">injunction<\/span> to prohibit further operations. Such <span class=\"dictionary\">injunction<\/span> shall not relieve the <span class=\"dictionary\">operator<\/span> of the duty to reclaim lands previously affected according to the terms and conditions of the applicable permit.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n INJUNCTION PROHIBITING MINING OPERATION (\u00a7 45.2-1225)\n\nWhenever adverse ecological disruptions or the injurious effects thereof\nseriously threaten or endanger the health, safety, welfare, or property rights\nof citizens of the Commonwealth, and abatement by the application of control\ntechniques is not feasible, the Director shall petition the appropriate circuit\ncourt for an injunction to prohibit further operations. Such injunction shall\nnot relieve the operator of the duty to reclaim lands previously affected\naccording to the terms and conditions of the applicable permit.\n\nHISTORY: 1977, c. 312, \u00a7 45.1-193.1; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}