{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/45.2-620.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/45.2-620.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/45.2-620.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/45.2-620.html"}],"law_id":80532,"edition_id":1,"section_id":80532,"structure_id":16536,"section_number":"45.2-620","catch_line":" Emergency notification and evacuation plan","history":"2005, c. 3, \u00a7 45.1-224.1; 2021, Sp. Sess. I, c. 387.","full_text":"A\n\nOn or before July 1 of each year, the operator of any retaining dam or mine refuse impoundment that meets the criteria of subsection A of &#xA7; 45.2-618 shall submit to the Chief an emergency notification and evacuation plan. If there are no changes to a plan at the time the updated plan is due, the operator may submit a notice that there are no changes to the plan in lieu of submitting an updated plan to the Chief.B\n\nThe plan and attendant maps, appropriate for the level of hazard of the retaining dam or mine refuse impoundment, shall describe the retaining dam or mine refuse impoundment and shall include:1\n\nThe name and address of the operator owning, operating, or controlling the structure;2\n\nThe identification numbers of the structure as assigned by the Chief, MSHA, and the Office of Surface Mining;3\n\nThe location of the structure indicated on (i) a current United States Geological Survey 7.5-minute or 15-minute topographic quadrangle map, (ii) an equivalent digital map, or (iii) a topographic map of a scale approved by the Chief;4\n\nThe name and size in acres of the watershed in which the structure is located;5\n\nA description of the physical and engineering properties of the foundation materials on which the structure is to be or was constructed;6\n\nThe location of existing or proposed instrumentation;7\n\nA statement of the runoff attributable to the probable maximum precipitation of six-hour duration and the calculations used in determining such runoff;8\n\nA statement of the runoff attributable to the storm for which the structure is designed and the calculations used in determining such runoff;9\n\nThe location of any surface or underground coal mine, including the depth and extent of such workings, under and within 1,000 feet around the perimeter of the retaining dam or mine refuse impoundment, and the area of impounded material, shown at a scale not to exceed one inch equals 1,000 feet;10\n\nA map depicting the impoundment area and downstream and adjacent drainways, streambeds, roads, structures, and other public areas that could be affected if an accident were to occur at the impoundment. The map shall be at a scale not to exceed one inch equals 1,000 feet;11\n\nThe names of persons who are familiar with the plan protocols and can take actions necessary to eliminate the hazard and minimize the impact to miners, the community, and the environment;12\n\nA location where a command and communication center could be established for the company team and emergency response personnel to report during an impoundment event;13\n\nThe location of potential evacuation centers where affected parties could take shelter during an impoundment event;14\n\nAn emergency contact list for agencies that would respond to an impoundment event; and15\n\nA list of miners employed at the site and businesses, community buildings, residences, and other occupied buildings within the impact zone that could be affected by an impoundment event, or other effective means of identifying such impact zone.","order_by":null,"text":{"0":{"id":288511,"text":"On or before July 1 of each year, the operator of any retaining dam or mine refuse impoundment that meets the criteria of subsection A of &#xA7; 45.2-618 shall submit to the Chief an emergency notification and evacuation plan. If there are no changes to a plan at the time the updated plan is due, the operator may submit a notice that there are no changes to the plan in lieu of submitting an updated plan to the Chief.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":288512,"text":"The plan and attendant maps, appropriate for the level of hazard of the retaining dam or mine refuse impoundment, shall describe the retaining dam or mine refuse impoundment and shall include:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"B1"},"2":{"id":288513,"text":"The name and address of the operator owning, operating, or controlling the structure;","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"3":{"id":288514,"text":"The identification numbers of the structure as assigned by the Chief, MSHA, and the Office of Surface Mining;","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"4":{"id":288515,"text":"The location of the structure indicated on (i) a current United States Geological Survey 7.5-minute or 15-minute topographic quadrangle map, (ii) an equivalent digital map, or (iii) a topographic map of a scale approved by the Chief;","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"B4"},"5":{"id":288516,"text":"The name and size in acres of the watershed in which the structure is located;","type":"section","prefixes":["B","4"],"prefix":"4","entire_prefix":"B4","prefix_anchor":"B4","level":2,"prior_prefix":"B3","next_prefix":"B5"},"6":{"id":288517,"text":"A description of the physical and engineering properties of the foundation materials on which the structure is to be or was constructed;","type":"section","prefixes":["B","5"],"prefix":"5","entire_prefix":"B5","prefix_anchor":"B5","level":2,"prior_prefix":"B4","next_prefix":"B6"},"7":{"id":288518,"text":"The location of existing or proposed instrumentation;","type":"section","prefixes":["B","6"],"prefix":"6","entire_prefix":"B6","prefix_anchor":"B6","level":2,"prior_prefix":"B5","next_prefix":"B7"},"8":{"id":288519,"text":"A statement of the runoff attributable to the probable maximum precipitation of six-hour duration and the calculations used in determining such runoff;","type":"section","prefixes":["B","7"],"prefix":"7","entire_prefix":"B7","prefix_anchor":"B7","level":2,"prior_prefix":"B6","next_prefix":"B8"},"9":{"id":288520,"text":"A statement of the runoff attributable to the storm for which the structure is designed and the calculations used in determining such runoff;","type":"section","prefixes":["B","8"],"prefix":"8","entire_prefix":"B8","prefix_anchor":"B8","level":2,"prior_prefix":"B7","next_prefix":"B9"},"10":{"id":288521,"text":"The location of any surface or underground coal mine, including the depth and extent of such workings, under and within 1,000 feet around the perimeter of the retaining dam or mine refuse impoundment, and the area of impounded material, shown at a scale not to exceed one inch equals 1,000 feet;","type":"section","prefixes":["B","9"],"prefix":"9","entire_prefix":"B9","prefix_anchor":"B9","level":2,"prior_prefix":"B8","next_prefix":"B10"},"11":{"id":288522,"text":"A map depicting the impoundment area and downstream and adjacent drainways, streambeds, roads, structures, and other public areas that could be affected if an accident were to occur at the impoundment. The map shall be at a scale not to exceed one inch equals 1,000 feet;","type":"section","prefixes":["B","10"],"prefix":"10","entire_prefix":"B10","prefix_anchor":"B10","level":2,"prior_prefix":"B9","next_prefix":"B11"},"12":{"id":288523,"text":"The names of persons who are familiar with the plan protocols and can take actions necessary to eliminate the hazard and minimize the impact to miners, the community, and the environment;","type":"section","prefixes":["B","11"],"prefix":"11","entire_prefix":"B11","prefix_anchor":"B11","level":2,"prior_prefix":"B10","next_prefix":"B12"},"13":{"id":288524,"text":"A location where a command and communication center could be established for the company team and emergency response personnel to report during an impoundment event;","type":"section","prefixes":["B","12"],"prefix":"12","entire_prefix":"B12","prefix_anchor":"B12","level":2,"prior_prefix":"B11","next_prefix":"B13"},"14":{"id":288525,"text":"The location of potential evacuation centers where affected parties could take shelter during an impoundment event;","type":"section","prefixes":["B","13"],"prefix":"13","entire_prefix":"B13","prefix_anchor":"B13","level":2,"prior_prefix":"B12","next_prefix":"B14"},"15":{"id":288526,"text":"An emergency contact list for agencies that would respond to an impoundment event; and","type":"section","prefixes":["B","14"],"prefix":"14","entire_prefix":"B14","prefix_anchor":"B14","level":2,"prior_prefix":"B13","next_prefix":"B15"},"16":{"id":288527,"text":"A list of miners employed at the site and businesses, community buildings, residences, and other occupied buildings within the impact zone that could be affected by an impoundment event, or other effective means of identifying such impact zone.","type":"section","prefixes":["B","15"],"prefix":"15","entire_prefix":"B15","prefix_anchor":"B15","level":2,"prior_prefix":"B14"}},"ancestry":[{"id":16536,"edition_id":1,"name":"Coal Mine Refuse Impoundments and Retaining Dams","identifier":"4","label":"article","depth":5,"order_by":1,"parent_id":15154,"metadata":{},"date_created":"2026-06-26 04:23:05","date_modified":"2026-06-26 04:23:05","permalink":{"id":223077,"object_type":"structure","relational_id":16536,"identifier":"4","token":"45.2\/II\/A\/6\/4","url":"\/45.2\/II\/A\/6\/4\/","edition_id":1,"permalink":0,"preferred":1}},{"id":15154,"edition_id":1,"name":"Coal Mining Property, Interests, Adjacent Owners, and Dams","identifier":"6","label":"chapter","depth":4,"order_by":1,"parent_id":13784,"metadata":{},"date_created":"2026-06-26 03:52:34","date_modified":"2026-06-26 03:52:34","permalink":{"id":223001,"object_type":"structure","relational_id":15154,"identifier":"6","token":"45.2\/II\/A\/6","url":"\/45.2\/II\/A\/6\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13784,"edition_id":1,"name":"Coal Mines Generally","identifier":"A","label":"part","depth":3,"order_by":1,"parent_id":12985,"metadata":{},"date_created":"2026-06-26 03:45:52","date_modified":"2026-06-26 03:45:52","permalink":{"id":222649,"object_type":"structure","relational_id":13784,"identifier":"A","token":"45.2\/II\/A","url":"\/45.2\/II\/A\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12985,"edition_id":1,"name":"Coal Mining","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12713,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":222647,"object_type":"structure","relational_id":12985,"identifier":"II","token":"45.2\/II","url":"\/45.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12713,"edition_id":1,"name":"Mines, Minerals, and Energy","identifier":"45.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":222539,"object_type":"structure","relational_id":12713,"identifier":"45.2","token":"45.2","url":"\/45.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":72700,"structure_id":16536,"section_number":"45.2-617","catch_line":" Definitions","url":"\/45.2-617\/","token":"45.2\/II\/A\/6\/4\/45.2-617","metadata":false},{"id":74952,"structure_id":16536,"section_number":"45.2-618","catch_line":" Design and construction of retaining dam or mine refuse impoundment; designs and other data to be submitted to Chief","url":"\/45.2-618\/","token":"45.2\/II\/A\/6\/4\/45.2-618","metadata":false},{"id":70699,"structure_id":16536,"section_number":"45.2-619","catch_line":" Examination of retaining dam or mine refuse impoundment; potentially hazardous condition; plans to be submitted by operators","url":"\/45.2-619\/","token":"45.2\/II\/A\/6\/4\/45.2-619","metadata":false},{"id":80532,"structure_id":16536,"section_number":"45.2-620","catch_line":" Emergency notification and evacuation plan","url":"\/45.2-620\/","token":"45.2\/II\/A\/6\/4\/45.2-620","metadata":false}],"previous_section":{"id":70699,"structure_id":16536,"section_number":"45.2-619","catch_line":" Examination of retaining dam or mine refuse impoundment; potentially hazardous condition; plans to be submitted by operators","url":"\/45.2-619\/","token":"45.2\/II\/A\/6\/4\/45.2-619","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/45.2-620\/","history_text":"<p>This law was first created in 2005. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?051+ful+CHAP0003\">3<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":74952,"section_number":"45.2-618","catch_line":" Design and construction of retaining dam or mine refuse impoundment; designs and other data to be submitted to Chief","order_by":null,"url":"\/45.2-618\/"}],"permalink":{"id":223091,"object_type":"law","relational_id":80532,"identifier":"45.2-620","token":"45.2\/II\/A\/6\/4\/45.2-620","url":"\/45.2-620\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/45.2-620\/","token":"45.2\/II\/A\/6\/4\/45.2-620","dublin_core":{"Title":" Emergency notification and evacuation plan","Type":"Text","Format":"text\/html","Identifier":"\u00a7 45.2-620","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> On or before July 1 of each year, the <span class=\"dictionary\">operator<\/span> of any <span class=\"dictionary\">retaining dam<\/span> or <span class=\"dictionary\">mine refuse impoundment<\/span> that meets the criteria of subsection A of &#xA7; <a class=\"law\" title=\" Design and construction of retaining dam or mine refuse impoundment; designs and other data to be submitted to Chief\" href=\"\/45.2-618\/\">45.2-618<\/a> shall submit to the <span class=\"dictionary\">Chief<\/span> an emergency notification and evacuation plan. If there are no changes to a plan at the time the updated plan is due, the <span class=\"dictionary\">operator<\/span> may submit a notice that there are no changes to the plan in lieu of submitting an updated plan to the <span class=\"dictionary\">Chief<\/span>. <a id=\"paragraph-288511\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The plan and attendant maps, appropriate for the level of hazard of the <span class=\"dictionary\">retaining dam<\/span> or <span class=\"dictionary\">mine refuse impoundment<\/span>, shall describe the <span class=\"dictionary\">retaining dam<\/span> or <span class=\"dictionary\">mine refuse impoundment<\/span> and shall include: <a id=\"paragraph-288512\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> The name and address of the <span class=\"dictionary\">operator<\/span> owning, operating, or controlling the structure; <a id=\"paragraph-288513\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> The identification numbers of the structure as assigned by the <span class=\"dictionary\">Chief<\/span>, MSHA, and the Office of Surface Mining; <a id=\"paragraph-288514\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> The location of the structure indicated on (i) a current United States Geological Survey 7.5-minute or 15-minute topographic quadrangle map, (ii) an equivalent digital map, or (iii) a topographic map of a scale approved by the <span class=\"dictionary\">Chief<\/span>; <a id=\"paragraph-288515\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> The name and size in acres of the watershed in which the structure is located; <a id=\"paragraph-288516\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B5\" class=\"indent-1\"><p><span class=\"prefix-number\">5.<\/span> A description of the physical and engineering properties of the foundation <span class=\"dictionary\">materials<\/span> on which the structure is to be or was constructed; <a id=\"paragraph-288517\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B5\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B6\" class=\"indent-1\"><p><span class=\"prefix-number\">6.<\/span> The location of existing or proposed instrumentation; <a id=\"paragraph-288518\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B6\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B7\" class=\"indent-1\"><p><span class=\"prefix-number\">7.<\/span> A statement of the runoff attributable to the probable maximum precipitation of six-hour duration and the calculations used in determining such runoff; <a id=\"paragraph-288519\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B7\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B8\" class=\"indent-1\"><p><span class=\"prefix-number\">8.<\/span> A statement of the runoff attributable to the storm for which the structure is designed and the calculations used in determining such runoff; <a id=\"paragraph-288520\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B8\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B9\" class=\"indent-1\"><p><span class=\"prefix-number\">9.<\/span> The location of any surface or underground coal mine, including the depth and extent of such workings, under and within 1,000 feet around the perimeter of the <span class=\"dictionary\">retaining dam<\/span> or <span class=\"dictionary\">mine refuse impoundment<\/span>, and the area of impounded <span class=\"dictionary\">material<\/span>, shown at a scale not to exceed one inch equals 1,000 feet; <a id=\"paragraph-288521\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B9\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B10\" class=\"indent-1\"><p><span class=\"prefix-number\">10.<\/span> A map depicting the impoundment area and downstream and adjacent drainways, streambeds, roads, structures, and other public areas that could be affected if an accident were to occur at the impoundment. The map shall be at a scale not to exceed one inch equals 1,000 feet; <a id=\"paragraph-288522\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B10\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B11\" class=\"indent-1\"><p><span class=\"prefix-number\">11.<\/span> The names of persons who are familiar with the plan protocols and can take actions necessary to eliminate the hazard and minimize the impact to miners, the community, and the environment; <a id=\"paragraph-288523\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B11\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B12\" class=\"indent-1\"><p><span class=\"prefix-number\">12.<\/span> A location where a command and communication center could be established for the company team and emergency response personnel to report during an impoundment event; <a id=\"paragraph-288524\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B12\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B13\" class=\"indent-1\"><p><span class=\"prefix-number\">13.<\/span> The location of potential evacuation centers where affected parties could take shelter during an impoundment event; <a id=\"paragraph-288525\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B13\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B14\" class=\"indent-1\"><p><span class=\"prefix-number\">14.<\/span> An emergency contact list for agencies that would respond to an impoundment event; and <a id=\"paragraph-288526\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B14\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B15\" class=\"indent-1\"><p><span class=\"prefix-number\">15.<\/span> A list of miners employed at the site and businesses, community buildings, residences, and other occupied buildings within the impact zone that could be affected by an impoundment event, or other effective means of identifying such impact zone. <a id=\"paragraph-288527\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-620\/#B15\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n EMERGENCY NOTIFICATION AND EVACUATION PLAN (\u00a7 45.2-620)\n\nA. On or before July 1 of each year, the operator of any retaining dam or mine\nrefuse impoundment that meets the criteria of subsection A of &#xA7; 45.2-618\nshall submit to the Chief an emergency notification and evacuation plan. If\nthere are no changes to a plan at the time the updated plan is due, the operator\nmay submit a notice that there are no changes to the plan in lieu of submitting\nan updated plan to the Chief.\n\nB. The plan and attendant maps, appropriate for the level of hazard of the\nretaining dam or mine refuse impoundment, shall describe the retaining dam or\nmine refuse impoundment and shall include:\n\n   1. The name and address of the operator owning, operating, or controlling the\n   structure;\n\n   2. The identification numbers of the structure as assigned by the Chief, MSHA,\n   and the Office of Surface Mining;\n\n   3. The location of the structure indicated on (i) a current United States\n   Geological Survey 7.5-minute or 15-minute topographic quadrangle map, (ii) an\n   equivalent digital map, or (iii) a topographic map of a scale approved by the\n   Chief;\n\n   4. The name and size in acres of the watershed in which the structure is\n   located;\n\n   5. A description of the physical and engineering properties of the foundation\n   materials on which the structure is to be or was constructed;\n\n   6. The location of existing or proposed instrumentation;\n\n   7. A statement of the runoff attributable to the probable maximum\n   precipitation of six-hour duration and the calculations used in determining\n   such runoff;\n\n   8. A statement of the runoff attributable to the storm for which the structure\n   is designed and the calculations used in determining such runoff;\n\n   9. The location of any surface or underground coal mine, including the depth\n   and extent of such workings, under and within 1,000 feet around the perimeter\n   of the retaining dam or mine refuse impoundment, and the area of impounded\n   material, shown at a scale not to exceed one inch equals 1,000 feet;\n\n   10. A map depicting the impoundment area and downstream and adjacent\n   drainways, streambeds, roads, structures, and other public areas that could be\n   affected if an accident were to occur at the impoundment. The map shall be at\n   a scale not to exceed one inch equals 1,000 feet;\n\n   11. The names of persons who are familiar with the plan protocols and can take\n   actions necessary to eliminate the hazard and minimize the impact to miners,\n   the community, and the environment;\n\n   12. A location where a command and communication center could be established\n   for the company team and emergency response personnel to report during an\n   impoundment event;\n\n   13. The location of potential evacuation centers where affected parties could\n   take shelter during an impoundment event;\n\n   14. An emergency contact list for agencies that would respond to an\n   impoundment event; and\n\n   15. A list of miners employed at the site and businesses, community buildings,\n   residences, and other occupied buildings within the impact zone that could be\n   affected by an impoundment event, or other effective means of identifying such\n   impact zone.\n\nHISTORY: 2005, c. 3, \u00a7 45.1-224.1; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}