{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/45.2-710.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/45.2-710.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/45.2-710.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/45.2-710.html"}],"law_id":85797,"edition_id":1,"section_id":85797,"structure_id":12988,"section_number":"45.2-710","catch_line":" Roof control plans","history":"Code 1950, \u00a7 45-68.2; 1954, c. 191; 1966, c. 594, \u00a7 45.1-40; 1975, c. 520; 1978, c. 729; 1984, c. 590; 1994, c. 28, \u00a7 45.1-161.109; 1999, c. 256; 2005, c. 3; 2011, cc. 826, 862; 2021, Sp. Sess. I, c. 387.","full_text":"A\n\nEach underground coal mine shall have a roof control plan approved by the Chief. Each plan shall include (i) a minimum standard for adequately controlling the roof, face, and ribs; (ii) a description of mining methods used; (iii) a listing and specification of roof and rib support materials; (iv) instruction for the installation of temporary and permanent roof supports; (v) a description of any pillar recovery methods; (vi) applicable drawings that demonstrate the width of each opening, each roof support installation sequence, and each pillar recovery sequence; and (vii) any additional requirements deemed necessary by the Chief. The initial submission of any roof control plan shall include maps of mine projections, overlying and underlying mine workings, coal contours, and surface contours. If changes are to be made in the mining system that necessitate any change in the roof control plan, the plan shall be revised and approved by the Chief prior to implementing the new mining system.B\n\nThe Chief shall, where he deems necessary, prescribe adequate minimum standards for systematic support of mine roof, suitable to the roof conditions and mining system of each mine. Such standards shall be incorporated into an approved roof control plan for the mine.C\n\nFailure to comply with the approved roof control plan for the mine shall constitute a violation of this section.D\n\nThe approved roof control plan shall be posted conspicuously at the mine and a copy shall be available at each working section of the mine.E\n\nThe minimum standards and plan shall provide for temporary support at all active workings, without regard to natural condition.F\n\nIf the minimum standards do not afford adequate protection, such additional supports shall be installed as necessary. Such additional supports shall be described in the plan.G\n\nThis section shall not apply to any roof control system installed prior to January 27, 1988, so long as the support system continues to effectively control the roof, face, and ribs.","order_by":null,"text":{"0":{"id":307248,"text":"Each underground coal mine shall have a roof control plan approved by the Chief. Each plan shall include (i) a minimum standard for adequately controlling the roof, face, and ribs; (ii) a description of mining methods used; (iii) a listing and specification of roof and rib support materials; (iv) instruction for the installation of temporary and permanent roof supports; (v) a description of any pillar recovery methods; (vi) applicable drawings that demonstrate the width of each opening, each roof support installation sequence, and each pillar recovery sequence; and (vii) any additional requirements deemed necessary by the Chief. The initial submission of any roof control plan shall include maps of mine projections, overlying and underlying mine workings, coal contours, and surface contours. If changes are to be made in the mining system that necessitate any change in the roof control plan, the plan shall be revised and approved by the Chief prior to implementing the new mining system.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":307249,"text":"The Chief shall, where he deems necessary, prescribe adequate minimum standards for systematic support of mine roof, suitable to the roof conditions and mining system of each mine. Such standards shall be incorporated into an approved roof control plan for the mine.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":307250,"text":"Failure to comply with the approved roof control plan for the mine shall constitute a violation of this section.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B","next_prefix":"D"},"3":{"id":307251,"text":"The approved roof control plan shall be posted conspicuously at the mine and a copy shall be available at each working section of the mine.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C","next_prefix":"E"},"4":{"id":307252,"text":"The minimum standards and plan shall provide for temporary support at all active workings, without regard to natural condition.","type":"section","prefixes":["E"],"prefix":"E","entire_prefix":"E","prefix_anchor":"E","level":1,"prior_prefix":"D","next_prefix":"F"},"5":{"id":307253,"text":"If the minimum standards do not afford adequate protection, such additional supports shall be installed as necessary. Such additional supports shall be described in the plan.","type":"section","prefixes":["F"],"prefix":"F","entire_prefix":"F","prefix_anchor":"F","level":1,"prior_prefix":"E","next_prefix":"G"},"6":{"id":307254,"text":"This section shall not apply to any roof control system installed prior to January 27, 1988, so long as the support system continues to effectively control the roof, face, and ribs.","type":"section","prefixes":["G"],"prefix":"G","entire_prefix":"G","prefix_anchor":"G","level":1,"prior_prefix":"F"}},"ancestry":[{"id":12988,"edition_id":1,"name":"Roof, Face, and Rib Control","identifier":"4","label":"article","depth":5,"order_by":1,"parent_id":12987,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":223141,"object_type":"structure","relational_id":12988,"identifier":"4","token":"45.2\/II\/B\/7\/4","url":"\/45.2\/II\/B\/7\/4\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12987,"edition_id":1,"name":"Requirements Applicable to Underground Coal Mines; Mine Construction","identifier":"7","label":"chapter","depth":4,"order_by":1,"parent_id":12986,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":223097,"object_type":"structure","relational_id":12987,"identifier":"7","token":"45.2\/II\/B\/7","url":"\/45.2\/II\/B\/7\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12986,"edition_id":1,"name":"Underground Coal Mines","identifier":"B","label":"part","depth":3,"order_by":1,"parent_id":12985,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":223095,"object_type":"structure","relational_id":12986,"identifier":"B","token":"45.2\/II\/B","url":"\/45.2\/II\/B\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12985,"edition_id":1,"name":"Coal Mining","identifier":"II","label":"subtitle","depth":2,"order_by":1,"parent_id":12713,"metadata":{},"date_created":"2026-06-26 03:44:06","date_modified":"2026-06-26 03:44:06","permalink":{"id":222647,"object_type":"structure","relational_id":12985,"identifier":"II","token":"45.2\/II","url":"\/45.2\/II\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12713,"edition_id":1,"name":"Mines, Minerals, and Energy","identifier":"45.2","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":222539,"object_type":"structure","relational_id":12713,"identifier":"45.2","token":"45.2","url":"\/45.2\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":57825,"structure_id":12988,"section_number":"45.2-709","catch_line":" Roof, face, and ribs to be secure","url":"\/45.2-709\/","token":"45.2\/II\/B\/7\/4\/45.2-709","metadata":false},{"id":85797,"structure_id":12988,"section_number":"45.2-710","catch_line":" Roof control plans","url":"\/45.2-710\/","token":"45.2\/II\/B\/7\/4\/45.2-710","metadata":false},{"id":54068,"structure_id":12988,"section_number":"45.2-711","catch_line":" Instruction of miners","url":"\/45.2-711\/","token":"45.2\/II\/B\/7\/4\/45.2-711","metadata":false},{"id":59233,"structure_id":12988,"section_number":"45.2-712","catch_line":" Copies of plan","url":"\/45.2-712\/","token":"45.2\/II\/B\/7\/4\/45.2-712","metadata":false},{"id":56390,"structure_id":12988,"section_number":"45.2-713","catch_line":" Automated temporary roof support systems","url":"\/45.2-713\/","token":"45.2\/II\/B\/7\/4\/45.2-713","metadata":false},{"id":59472,"structure_id":12988,"section_number":"45.2-714","catch_line":" Supplies of materials for supports","url":"\/45.2-714\/","token":"45.2\/II\/B\/7\/4\/45.2-714","metadata":false},{"id":82295,"structure_id":12988,"section_number":"45.2-715","catch_line":" Examination and testing of roof, face, and ribs","url":"\/45.2-715\/","token":"45.2\/II\/B\/7\/4\/45.2-715","metadata":false},{"id":58896,"structure_id":12988,"section_number":"45.2-716","catch_line":" Mapping of roof falls","url":"\/45.2-716\/","token":"45.2\/II\/B\/7\/4\/45.2-716","metadata":false},{"id":57534,"structure_id":12988,"section_number":"45.2-717","catch_line":" Unsafe conditions","url":"\/45.2-717\/","token":"45.2\/II\/B\/7\/4\/45.2-717","metadata":false},{"id":68517,"structure_id":12988,"section_number":"45.2-718","catch_line":" Removal of supports","url":"\/45.2-718\/","token":"45.2\/II\/B\/7\/4\/45.2-718","metadata":false}],"previous_section":{"id":57825,"structure_id":12988,"section_number":"45.2-709","catch_line":" Roof, face, and ribs to be secure","url":"\/45.2-709\/","token":"45.2\/II\/B\/7\/4\/45.2-709","metadata":false},"next_section":{"id":54068,"structure_id":12988,"section_number":"45.2-711","catch_line":" Instruction of miners","url":"\/45.2-711\/","token":"45.2\/II\/B\/7\/4\/45.2-711","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/45.2-710\/","history_text":"<p>The record of this law\u2019s original creation isn\u2019t available online. It has been modified 9 times. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. Those modifications are as follows: in 1954, chapter 191; in 1966, chapter 594; in 1975, chapter 520; in 1978, chapter 729; in 1984, chapter 590; in 1994, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?941+ful+CHAP0028\">28<\/a>; in 1999, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?991+ful+CHAP0256\">256<\/a>; in 2005, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?051+ful+CHAP0003\">3<\/a>; in 2011, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?111+ful+CHAP0826\">826<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?111+ful+CHAP0862\">862<\/a>.<\/p>","references":false,"refers_to":false,"permalink":{"id":223147,"object_type":"law","relational_id":85797,"identifier":"45.2-710","token":"45.2\/II\/B\/7\/4\/45.2-710","url":"\/45.2-710\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/45.2-710\/","token":"45.2\/II\/B\/7\/4\/45.2-710","dublin_core":{"Title":" Roof control plans","Type":"Text","Format":"text\/html","Identifier":"\u00a7 45.2-710","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Each underground coal mine shall have a roof control plan approved by the <span class=\"dictionary\">Chief<\/span>. Each plan shall include (i) a minimum standard for adequately controlling the roof, face, and ribs; (ii) a description of mining methods used; (iii) a listing and specification of roof and rib support <span class=\"dictionary\">materials<\/span>; (iv) instruction for the installation of temporary and permanent roof supports; (v) a description of any pillar recovery methods; (vi) applicable drawings that demonstrate the width of each opening, each roof support installation sequence, and each pillar recovery sequence; and (vii) any additional requirements deemed necessary by the <span class=\"dictionary\">Chief<\/span>. The initial submission of any roof control plan shall include maps of mine projections, overlying and underlying mine workings, coal contours, and surface contours. If changes are to be made in the mining system that necessitate any change in the roof control plan, the plan shall be revised and approved by the <span class=\"dictionary\">Chief<\/span> prior to implementing the new mining system. <a id=\"paragraph-307248\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The <span class=\"dictionary\">Chief<\/span> shall, where he deems necessary, prescribe adequate minimum standards for systematic support of mine roof, suitable to the roof conditions and mining system of each mine. Such standards shall be incorporated into an approved roof control plan for the mine. <a id=\"paragraph-307249\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> Failure to comply with the approved roof control plan for the mine shall constitute a violation of this section. <a id=\"paragraph-307250\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> The approved roof control plan shall be posted conspicuously at the mine and a copy shall be available at each working section of the mine. <a id=\"paragraph-307251\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"E\"><p><span class=\"prefix-number\">E.<\/span> The minimum standards and plan shall provide for temporary support at all active workings, without regard to natural condition. <a id=\"paragraph-307252\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#E\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"F\"><p><span class=\"prefix-number\">F.<\/span> If the minimum standards do not afford adequate protection, such additional supports shall be installed as necessary. Such additional supports shall be described in the plan. <a id=\"paragraph-307253\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#F\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"G\"><p><span class=\"prefix-number\">G.<\/span> This section shall not apply to any roof control system installed prior to January 27, 1988, so long as the support system continues to effectively control the roof, face, and ribs. <a id=\"paragraph-307254\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/45.2-710\/#G\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n ROOF CONTROL PLANS (\u00a7 45.2-710)\n\nA. Each underground coal mine shall have a roof control plan approved by the\nChief. Each plan shall include (i) a minimum standard for adequately controlling\nthe roof, face, and ribs; (ii) a description of mining methods used; (iii) a\nlisting and specification of roof and rib support materials; (iv) instruction\nfor the installation of temporary and permanent roof supports; (v) a description\nof any pillar recovery methods; (vi) applicable drawings that demonstrate the\nwidth of each opening, each roof support installation sequence, and each pillar\nrecovery sequence; and (vii) any additional requirements deemed necessary by the\nChief. The initial submission of any roof control plan shall include maps of\nmine projections, overlying and underlying mine workings, coal contours, and\nsurface contours. If changes are to be made in the mining system that\nnecessitate any change in the roof control plan, the plan shall be revised and\napproved by the Chief prior to implementing the new mining system.\n\nB. The Chief shall, where he deems necessary, prescribe adequate minimum\nstandards for systematic support of mine roof, suitable to the roof conditions\nand mining system of each mine. Such standards shall be incorporated into an\napproved roof control plan for the mine.\n\nC. Failure to comply with the approved roof control plan for the mine shall\nconstitute a violation of this section.\n\nD. The approved roof control plan shall be posted conspicuously at the mine and\na copy shall be available at each working section of the mine.\n\nE. The minimum standards and plan shall provide for temporary support at all\nactive workings, without regard to natural condition.\n\nF. If the minimum standards do not afford adequate protection, such additional\nsupports shall be installed as necessary. Such additional supports shall be\ndescribed in the plan.\n\nG. This section shall not apply to any roof control system installed prior to\nJanuary 27, 1988, so long as the support system continues to effectively control\nthe roof, face, and ribs.\n\nHISTORY: Code 1950, \u00a7 45-68.2; 1954, c. 191; 1966, c. 594, \u00a7 45.1-40; 1975, c.\n520; 1978, c. 729; 1984, c. 590; 1994, c. 28, \u00a7 45.1-161.109; 1999, c. 256;\n2005, c. 3; 2011, cc. 826, 862; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}