{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/55.1-1962.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/55.1-1962.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/55.1-1962.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/55.1-1962.1.html"}],"law_id":76748,"edition_id":1,"section_id":76748,"structure_id":13236,"section_number":"55.1-1962.1","catch_line":"Electric vehicle charging stations permitted","history":"2020, c. 1012.","full_text":"A\n\nExcept to the extent that the condominium instruments provide otherwise, no unit owners&#8217; association shall prohibit any unit owner from installing an electric vehicle charging station for the unit owner&#8217;s personal use within the boundaries of a unit or limited common element parking space appurtenant to the unit owned by the unit owner.B\n\nNotwithstanding any other provision of this chapter or the condominium instruments, the unit owners&#8217; association may prohibit a unit owner from installing an electric vehicle charging station if installation of the electric vehicle charging station is not technically feasible or reasonably practicable due to safety risks, structural issues, or engineering conditions.C\n\nThe unit owners&#8217; association may require as a condition of approving installation of an electric vehicle charging station that the unit owner:1\n\nProvide detailed plans and drawings for installation of an electric vehicle charging station prepared by a licensed and registered electrical contractor or engineer familiar with the installation and core requirements of an electric vehicle charging station.2\n\nComply with applicable building codes or recognized safety standards.3\n\nComply with reasonable architectural standards adopted by the unit owners&#8217; association that govern the dimensions, placement, or external appearance of the electric vehicle charging station.4\n\nPay the costs of installation, maintenance, operation, and use of the electric vehicle charging station.5\n\nIndemnify and hold the unit owners&#8217; association harmless from any claim made by a contractor or supplier pursuant to Title 43.6\n\nPay the cost of removal of the electric vehicle charging station and restoration of the area if the unit owner decides there is no longer a need for the electric vehicle charging station.7\n\nSeparately meter, at the unit owner&#8217;s sole expense, the utilities associated with such electric vehicle charging station and pay the cost of electricity and other associated utilities.8\n\nEngage the services of a licensed electrician or engineer familiar with the installation and core requirements of an electric vehicle charging station to install the electric vehicle charging station.9\n\nObtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, and use of the electric vehicle charging station and provide a certificate of insurance naming the unit owners&#8217; association as an additional insured on the unit owner&#8217;s insurance policy for any claim related to the installation, maintenance, operation, or use of the electric vehicle charging station within 14 days after receiving the unit owners&#8217; association&#8217;s approval to install such charging station.10\n\nReimburse the unit owners&#8217; association for any increase in common expenses specifically attributable to the electric vehicle charging station installation, including the actual cost of any increased insurance premium amount, within 14 days&#8217; notice from the unit owners&#8217; association.D\n\nThe conditions imposed pursuant to this section on unit owners for installation of an electric vehicle charging station shall run with title to the unit to which the limited common element parking space is appurtenant.E\n\nAny unit owner installing an electric vehicle charging station in a unit or on a limited common element parking space appurtenant to the unit owned by the unit owner shall indemnify and hold the unit owners&#8217; association harmless from all liability, including reasonable attorney fees incurred by the association resulting from a claim, arising out of the installation, maintenance, operation, or use of such electric charging station. A unit owners&#8217; association may require the unit owner to obtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, or use of the electric vehicle charging station and require the unit owners&#8217; association to be included as a named insured on such policy.","order_by":null,"text":{"0":{"id":275594,"text":"Except to the extent that the condominium instruments provide otherwise, no unit owners&#8217; association shall prohibit any unit owner from installing an electric vehicle charging station for the unit owner&#8217;s personal use within the boundaries of a unit or limited common element parking space appurtenant to the unit owned by the unit owner.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":275595,"text":"Notwithstanding any other provision of this chapter or the condominium instruments, the unit owners&#8217; association may prohibit a unit owner from installing an electric vehicle charging station if installation of the electric vehicle charging station is not technically feasible or reasonably practicable due to safety risks, structural issues, or engineering conditions.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":275596,"text":"The unit owners&#8217; association may require as a condition of approving installation of an electric vehicle charging station that the unit owner:","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B","next_prefix":"C1"},"3":{"id":275597,"text":"Provide detailed plans and drawings for installation of an electric vehicle charging station prepared by a licensed and registered electrical contractor or engineer familiar with the installation and core requirements of an electric vehicle charging station.","type":"section","prefixes":["C","1"],"prefix":"1","entire_prefix":"C1","prefix_anchor":"C1","level":2,"prior_prefix":"C","next_prefix":"C2"},"4":{"id":275598,"text":"Comply with applicable building codes or recognized safety standards.","type":"section","prefixes":["C","2"],"prefix":"2","entire_prefix":"C2","prefix_anchor":"C2","level":2,"prior_prefix":"C1","next_prefix":"C3"},"5":{"id":275599,"text":"Comply with reasonable architectural standards adopted by the unit owners&#8217; association that govern the dimensions, placement, or external appearance of the electric vehicle charging station.","type":"section","prefixes":["C","3"],"prefix":"3","entire_prefix":"C3","prefix_anchor":"C3","level":2,"prior_prefix":"C2","next_prefix":"C4"},"6":{"id":275600,"text":"Pay the costs of installation, maintenance, operation, and use of the electric vehicle charging station.","type":"section","prefixes":["C","4"],"prefix":"4","entire_prefix":"C4","prefix_anchor":"C4","level":2,"prior_prefix":"C3","next_prefix":"C5"},"7":{"id":275601,"text":"Indemnify and hold the unit owners&#8217; association harmless from any claim made by a contractor or supplier pursuant to Title 43.","type":"section","prefixes":["C","5"],"prefix":"5","entire_prefix":"C5","prefix_anchor":"C5","level":2,"prior_prefix":"C4","next_prefix":"C6"},"8":{"id":275602,"text":"Pay the cost of removal of the electric vehicle charging station and restoration of the area if the unit owner decides there is no longer a need for the electric vehicle charging station.","type":"section","prefixes":["C","6"],"prefix":"6","entire_prefix":"C6","prefix_anchor":"C6","level":2,"prior_prefix":"C5","next_prefix":"C7"},"9":{"id":275603,"text":"Separately meter, at the unit owner&#8217;s sole expense, the utilities associated with such electric vehicle charging station and pay the cost of electricity and other associated utilities.","type":"section","prefixes":["C","7"],"prefix":"7","entire_prefix":"C7","prefix_anchor":"C7","level":2,"prior_prefix":"C6","next_prefix":"C8"},"10":{"id":275604,"text":"Engage the services of a licensed electrician or engineer familiar with the installation and core requirements of an electric vehicle charging station to install the electric vehicle charging station.","type":"section","prefixes":["C","8"],"prefix":"8","entire_prefix":"C8","prefix_anchor":"C8","level":2,"prior_prefix":"C7","next_prefix":"C9"},"11":{"id":275605,"text":"Obtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, and use of the electric vehicle charging station and provide a certificate of insurance naming the unit owners&#8217; association as an additional insured on the unit owner&#8217;s insurance policy for any claim related to the installation, maintenance, operation, or use of the electric vehicle charging station within 14 days after receiving the unit owners&#8217; association&#8217;s approval to install such charging station.","type":"section","prefixes":["C","9"],"prefix":"9","entire_prefix":"C9","prefix_anchor":"C9","level":2,"prior_prefix":"C8","next_prefix":"C10"},"12":{"id":275606,"text":"Reimburse the unit owners&#8217; association for any increase in common expenses specifically attributable to the electric vehicle charging station installation, including the actual cost of any increased insurance premium amount, within 14 days&#8217; notice from the unit owners&#8217; association.","type":"section","prefixes":["C","10"],"prefix":"10","entire_prefix":"C10","prefix_anchor":"C10","level":2,"prior_prefix":"C9","next_prefix":"D"},"13":{"id":275607,"text":"The conditions imposed pursuant to this section on unit owners for installation of an electric vehicle charging station shall run with title to the unit to which the limited common element parking space is appurtenant.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C10","next_prefix":"E"},"14":{"id":275608,"text":"Any unit owner installing an electric vehicle charging station in a unit or on a limited common element parking space appurtenant to the unit owned by the unit owner shall indemnify and hold the unit owners&#8217; association harmless from all liability, including reasonable attorney fees incurred by the association resulting from a claim, arising out of the installation, maintenance, operation, or use of such electric charging station. A unit owners&#8217; association may require the unit owner to obtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, or use of the electric vehicle charging station and require the unit owners&#8217; association to be included as a named insured on such policy.","type":"section","prefixes":["E"],"prefix":"E","entire_prefix":"E","prefix_anchor":"E","level":1,"prior_prefix":"D"}},"ancestry":[{"id":13236,"edition_id":1,"name":"Management of Condominium","identifier":"3","label":"article","depth":4,"order_by":1,"parent_id":13018,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":246789,"object_type":"structure","relational_id":13236,"identifier":"3","token":"55.1\/IV\/19\/3","url":"\/55.1\/IV\/19\/3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13018,"edition_id":1,"name":"Virginia Condominium Act","identifier":"19","label":"chapter","depth":3,"order_by":1,"parent_id":12914,"metadata":{},"date_created":"2026-06-26 03:44:09","date_modified":"2026-06-26 03:44:09","permalink":{"id":246623,"object_type":"structure","relational_id":13018,"identifier":"19","token":"55.1\/IV\/19","url":"\/55.1\/IV\/19\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12914,"edition_id":1,"name":"Common Interest Communities","identifier":"IV","label":"subtitle","depth":2,"order_by":1,"parent_id":12707,"metadata":{},"date_created":"2026-06-26 03:44:01","date_modified":"2026-06-26 03:44:01","permalink":{"id":246473,"object_type":"structure","relational_id":12914,"identifier":"IV","token":"55.1\/IV","url":"\/55.1\/IV\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12707,"edition_id":1,"name":"Property and Conveyances","identifier":"55.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:49","date_modified":"2026-06-26 03:43:49","permalink":{"id":244769,"object_type":"structure","relational_id":12707,"identifier":"55.1","token":"55.1","url":"\/55.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":75299,"structure_id":13236,"section_number":"55.1-1940","catch_line":"Bylaws to be recorded with declaration; contents; unit owners' association; executive board; amendment of bylaws","url":"\/55.1-1940\/","token":"55.1\/IV\/19\/3\/55.1-1940","metadata":false},{"id":56162,"structure_id":13236,"section_number":"55.1-1940.1","catch_line":"Termination and duration of certain management contracts","url":"\/55.1-1940.1\/","token":"55.1\/IV\/19\/3\/55.1-1940.1","metadata":false},{"id":86301,"structure_id":13236,"section_number":"55.1-1941","catch_line":"Amendment to condominium instruments; consent of mortgagee","url":"\/55.1-1941\/","token":"55.1\/IV\/19\/3\/55.1-1941","metadata":false},{"id":77055,"structure_id":13236,"section_number":"55.1-1942","catch_line":"Reformation of declaration; judicial procedure","url":"\/55.1-1942\/","token":"55.1\/IV\/19\/3\/55.1-1942","metadata":false},{"id":84290,"structure_id":13236,"section_number":"55.1-1943","catch_line":"Control of condominium by declarant","url":"\/55.1-1943\/","token":"55.1\/IV\/19\/3\/55.1-1943","metadata":false},{"id":68952,"structure_id":13236,"section_number":"55.1-1944","catch_line":"Deposit of funds","url":"\/55.1-1944\/","token":"55.1\/IV\/19\/3\/55.1-1944","metadata":false},{"id":86875,"structure_id":13236,"section_number":"55.1-1945","catch_line":"Books, minutes, and records; inspection","url":"\/55.1-1945\/","token":"55.1\/IV\/19\/3\/55.1-1945","metadata":false},{"id":86155,"structure_id":13236,"section_number":"55.1-1946","catch_line":"Management office","url":"\/55.1-1946\/","token":"55.1\/IV\/19\/3\/55.1-1946","metadata":false},{"id":64177,"structure_id":13236,"section_number":"55.1-1947","catch_line":"Transfer of special declarant rights","url":"\/55.1-1947\/","token":"55.1\/IV\/19\/3\/55.1-1947","metadata":false},{"id":54240,"structure_id":13236,"section_number":"55.1-1948","catch_line":"Declarants not succeeding to special declarant rights","url":"\/55.1-1948\/","token":"55.1\/IV\/19\/3\/55.1-1948","metadata":false},{"id":76863,"structure_id":13236,"section_number":"55.1-1949","catch_line":"Meetings of unit owners' association and executive board","url":"\/55.1-1949\/","token":"55.1\/IV\/19\/3\/55.1-1949","metadata":false},{"id":64649,"structure_id":13236,"section_number":"55.1-1950","catch_line":"Distribution of information by members","url":"\/55.1-1950\/","token":"55.1\/IV\/19\/3\/55.1-1950","metadata":false},{"id":63730,"structure_id":13236,"section_number":"55.1-1951","catch_line":"Display of the flag of the United States; necessary supporting structures; affirmative defense","url":"\/55.1-1951\/","token":"55.1\/IV\/19\/3\/55.1-1951","metadata":false},{"id":80764,"structure_id":13236,"section_number":"55.1-1951.1","catch_line":"Installation of solar energy collection devices","url":"\/55.1-1951.1\/","token":"55.1\/IV\/19\/3\/55.1-1951.1","metadata":false},{"id":70408,"structure_id":13236,"section_number":"55.1-1952","catch_line":"Meetings of unit owners' association and executive board; quorums","url":"\/55.1-1952\/","token":"55.1\/IV\/19\/3\/55.1-1952","metadata":false},{"id":64764,"structure_id":13236,"section_number":"55.1-1953","catch_line":"Meetings of unit owners' association and executive board; voting by unit owners; proxies","url":"\/55.1-1953\/","token":"55.1\/IV\/19\/3\/55.1-1953","metadata":false},{"id":69473,"structure_id":13236,"section_number":"55.1-1954","catch_line":"Officers","url":"\/55.1-1954\/","token":"55.1\/IV\/19\/3\/55.1-1954","metadata":false},{"id":85997,"structure_id":13236,"section_number":"55.1-1955","catch_line":"Upkeep of condominiums; warranty against structural defects; statute of limitations for warranty; warranty review committee","url":"\/55.1-1955\/","token":"55.1\/IV\/19\/3\/55.1-1955","metadata":false},{"id":76691,"structure_id":13236,"section_number":"55.1-1956","catch_line":"Control of common elements","url":"\/55.1-1956\/","token":"55.1\/IV\/19\/3\/55.1-1956","metadata":false},{"id":86702,"structure_id":13236,"section_number":"55.1-1957","catch_line":"Common elements; notice of pesticide application","url":"\/55.1-1957\/","token":"55.1\/IV\/19\/3\/55.1-1957","metadata":false},{"id":66934,"structure_id":13236,"section_number":"55.1-1958","catch_line":"Tort and contract liability; judgment lien","url":"\/55.1-1958\/","token":"55.1\/IV\/19\/3\/55.1-1958","metadata":false},{"id":65547,"structure_id":13236,"section_number":"55.1-1959","catch_line":"Suspension of services for failure to pay assessments; corrective action; assessment of charges for violations; notice; hearing; adoption and enforcement of rules and regulations","url":"\/55.1-1959\/","token":"55.1\/IV\/19\/3\/55.1-1959","metadata":false},{"id":78546,"structure_id":13236,"section_number":"55.1-1960","catch_line":"Limitation of occupancy of a unit","url":"\/55.1-1960\/","token":"55.1\/IV\/19\/3\/55.1-1960","metadata":false},{"id":64065,"structure_id":13236,"section_number":"55.1-1960.1","catch_line":"Limitation of smoking in condominium","url":"\/55.1-1960.1\/","token":"55.1\/IV\/19\/3\/55.1-1960.1","metadata":false},{"id":62313,"structure_id":13236,"section_number":"55.1-1961","catch_line":"Use of for sale sign in connection with resale","url":"\/55.1-1961\/","token":"55.1\/IV\/19\/3\/55.1-1961","metadata":false},{"id":78887,"structure_id":13236,"section_number":"55.1-1962","catch_line":"Designation of authorized representative","url":"\/55.1-1962\/","token":"55.1\/IV\/19\/3\/55.1-1962","metadata":false},{"id":76748,"structure_id":13236,"section_number":"55.1-1962.1","catch_line":"Electric vehicle charging stations permitted","url":"\/55.1-1962.1\/","token":"55.1\/IV\/19\/3\/55.1-1962.1","metadata":false},{"id":71936,"structure_id":13236,"section_number":"55.1-1963","catch_line":"Insurance","url":"\/55.1-1963\/","token":"55.1\/IV\/19\/3\/55.1-1963","metadata":false},{"id":86524,"structure_id":13236,"section_number":"55.1-1964","catch_line":"Liability for common expenses; late fees; additional assessment; authority to borrow","url":"\/55.1-1964\/","token":"55.1\/IV\/19\/3\/55.1-1964","metadata":false},{"id":55038,"structure_id":13236,"section_number":"55.1-1965","catch_line":"Annual budget; reserve study; reserves for capital components","url":"\/55.1-1965\/","token":"55.1\/IV\/19\/3\/55.1-1965","metadata":false},{"id":86561,"structure_id":13236,"section_number":"55.1-1966","catch_line":"Lien for assessments; foreclosure","url":"\/55.1-1966\/","token":"55.1\/IV\/19\/3\/55.1-1966","metadata":false},{"id":82616,"structure_id":13236,"section_number":"55.1-1967","catch_line":"Notice of sale under deed of trust","url":"\/55.1-1967\/","token":"55.1\/IV\/19\/3\/55.1-1967","metadata":false},{"id":56723,"structure_id":13236,"section_number":"55.1-1968","catch_line":"Bond to be posted by declarant","url":"\/55.1-1968\/","token":"55.1\/IV\/19\/3\/55.1-1968","metadata":false},{"id":60552,"structure_id":13236,"section_number":"55.1-1969","catch_line":"Restraints on alienation","url":"\/55.1-1969\/","token":"55.1\/IV\/19\/3\/55.1-1969","metadata":false}],"previous_section":{"id":78887,"structure_id":13236,"section_number":"55.1-1962","catch_line":"Designation of authorized representative","url":"\/55.1-1962\/","token":"55.1\/IV\/19\/3\/55.1-1962","metadata":false},"next_section":{"id":71936,"structure_id":13236,"section_number":"55.1-1963","catch_line":"Insurance","url":"\/55.1-1963\/","token":"55.1\/IV\/19\/3\/55.1-1963","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/55.1-1962.1\/","history_text":"<p>This law was first created in 2020. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?201+ful+CHAP1012\">1012<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":false,"permalink":{"id":246895,"object_type":"law","relational_id":76748,"identifier":"55.1-1962.1","token":"55.1\/IV\/19\/3\/55.1-1962.1","url":"\/55.1-1962.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/55.1-1962.1\/","token":"55.1\/IV\/19\/3\/55.1-1962.1","dublin_core":{"Title":"Electric vehicle charging stations permitted","Type":"Text","Format":"text\/html","Identifier":"\u00a7 55.1-1962.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Except to the extent that the <span class=\"dictionary\">condominium<\/span> instruments provide otherwise, no <span class=\"dictionary\">unit owners<\/span>&#8217; association shall prohibit any <span class=\"dictionary\">unit owner<\/span> from installing an electric vehicle charging station for the <span class=\"dictionary\">unit owner<\/span>&#8217;s personal use within the boundaries of a unit or <span class=\"dictionary\">limited common element<\/span> parking space appurtenant to the unit owned by the <span class=\"dictionary\">unit owner<\/span>. <a id=\"paragraph-275594\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Notwithstanding any other provision of this chapter or the <span class=\"dictionary\">condominium<\/span> instruments, the <span class=\"dictionary\">unit owners<\/span>&#8217; association may prohibit a <span class=\"dictionary\">unit owner<\/span> from installing an electric vehicle charging station if installation of the electric vehicle charging station is not technically feasible or reasonably practicable due to safety risks, structural <span class=\"dictionary\">issues<\/span>, or engineering conditions. <a id=\"paragraph-275595\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> The <span class=\"dictionary\">unit owners<\/span>&#8217; association may require as a condition of approving installation of an electric vehicle charging station that the <span class=\"dictionary\">unit owner<\/span>: <a id=\"paragraph-275596\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Provide detailed plans and drawings for installation of an electric vehicle charging station prepared by a licensed and registered electrical contractor or engineer familiar with the installation and core requirements of an electric vehicle charging station. <a id=\"paragraph-275597\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> Comply with applicable building codes or recognized safety standards. <a id=\"paragraph-275598\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Comply with reasonable architectural standards adopted by the <span class=\"dictionary\">unit owners<\/span>&#8217; association that govern the dimensions, placement, or external <span class=\"dictionary\">appearance<\/span> of the electric vehicle charging station. <a id=\"paragraph-275599\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> Pay the costs of installation, maintenance, operation, and use of the electric vehicle charging station. <a id=\"paragraph-275600\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C5\" class=\"indent-1\"><p><span class=\"prefix-number\">5.<\/span> Indemnify and hold the <span class=\"dictionary\">unit owners<\/span>&#8217; association harmless from any claim made by a contractor or supplier pursuant to Title 43. <a id=\"paragraph-275601\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C5\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C6\" class=\"indent-1\"><p><span class=\"prefix-number\">6.<\/span> Pay the cost of removal of the electric vehicle charging station and restoration of the area if the <span class=\"dictionary\">unit owner<\/span> decides there is no longer a need for the electric vehicle charging station. <a id=\"paragraph-275602\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C6\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C7\" class=\"indent-1\"><p><span class=\"prefix-number\">7.<\/span> Separately meter, at the <span class=\"dictionary\">unit owner<\/span>&#8217;s sole expense, the utilities associated with such electric vehicle charging station and pay the cost of electricity and other associated utilities. <a id=\"paragraph-275603\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C7\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C8\" class=\"indent-1\"><p><span class=\"prefix-number\">8.<\/span> Engage the services of a licensed electrician or engineer familiar with the installation and core requirements of an electric vehicle charging station to install the electric vehicle charging station. <a id=\"paragraph-275604\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C8\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C9\" class=\"indent-1\"><p><span class=\"prefix-number\">9.<\/span> Obtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, and use of the electric vehicle charging station and provide a certificate of insurance naming the <span class=\"dictionary\">unit owners<\/span>&#8217; association as an additional insured on the <span class=\"dictionary\">unit owner<\/span>&#8217;s insurance policy for any claim related to the installation, maintenance, operation, or use of the electric vehicle charging station within 14 days after receiving the <span class=\"dictionary\">unit owners<\/span>&#8217; association&#8217;s approval to install such charging station. <a id=\"paragraph-275605\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C9\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C10\" class=\"indent-1\"><p><span class=\"prefix-number\">10.<\/span> Reimburse the <span class=\"dictionary\">unit owners<\/span>&#8217; association for any increase in <span class=\"dictionary\">common expenses<\/span> specifically attributable to the electric vehicle charging station installation, including the actual cost of any increased insurance premium amount, within 14 days&#8217; notice from the <span class=\"dictionary\">unit owners<\/span>&#8217; association. <a id=\"paragraph-275606\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#C10\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> The conditions imposed pursuant to this section on <span class=\"dictionary\">unit owners<\/span> for installation of an electric vehicle charging station shall run with title to the unit to which the <span class=\"dictionary\">limited common element<\/span> parking space is appurtenant. <a id=\"paragraph-275607\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"E\"><p><span class=\"prefix-number\">E.<\/span> Any <span class=\"dictionary\">unit owner<\/span> installing an electric vehicle charging station in a unit or on a <span class=\"dictionary\">limited common element<\/span> parking space appurtenant to the unit owned by the <span class=\"dictionary\">unit owner<\/span> shall indemnify and hold the <span class=\"dictionary\">unit owners<\/span>&#8217; association harmless from all liability, including reasonable attorney fees incurred by the association resulting from a claim, arising out of the installation, maintenance, operation, or use of such electric charging station. A <span class=\"dictionary\">unit owners<\/span>&#8217; association may require the <span class=\"dictionary\">unit owner<\/span> to obtain and maintain insurance covering claims and defenses of claims related to the installation, maintenance, operation, or use of the electric vehicle charging station and require the <span class=\"dictionary\">unit owners<\/span>&#8217; association to be included as a named insured on such policy. <a id=\"paragraph-275608\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/55.1-1962.1\/#E\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nELECTRIC VEHICLE CHARGING STATIONS PERMITTED (\u00a7 55.1-1962.1)\n\nA. Except to the extent that the condominium instruments provide otherwise, no\nunit owners&#8217; association shall prohibit any unit owner from installing an\nelectric vehicle charging station for the unit owner&#8217;s personal use within\nthe boundaries of a unit or limited common element parking space appurtenant to\nthe unit owned by the unit owner.\n\nB. Notwithstanding any other provision of this chapter or the condominium\ninstruments, the unit owners&#8217; association may prohibit a unit owner from\ninstalling an electric vehicle charging station if installation of the electric\nvehicle charging station is not technically feasible or reasonably practicable\ndue to safety risks, structural issues, or engineering conditions.\n\nC. The unit owners&#8217; association may require as a condition of approving\ninstallation of an electric vehicle charging station that the unit owner:\n\n   1. Provide detailed plans and drawings for installation of an electric vehicle\n   charging station prepared by a licensed and registered electrical contractor\n   or engineer familiar with the installation and core requirements of an\n   electric vehicle charging station.\n\n   2. Comply with applicable building codes or recognized safety standards.\n\n   3. Comply with reasonable architectural standards adopted by the unit\n   owners&#8217; association that govern the dimensions, placement, or external\n   appearance of the electric vehicle charging station.\n\n   4. Pay the costs of installation, maintenance, operation, and use of the\n   electric vehicle charging station.\n\n   5. Indemnify and hold the unit owners&#8217; association harmless from any\n   claim made by a contractor or supplier pursuant to Title 43.\n\n   6. Pay the cost of removal of the electric vehicle charging station and\n   restoration of the area if the unit owner decides there is no longer a need\n   for the electric vehicle charging station.\n\n   7. Separately meter, at the unit owner&#8217;s sole expense, the utilities\n   associated with such electric vehicle charging station and pay the cost of\n   electricity and other associated utilities.\n\n   8. Engage the services of a licensed electrician or engineer familiar with the\n   installation and core requirements of an electric vehicle charging station to\n   install the electric vehicle charging station.\n\n   9. Obtain and maintain insurance covering claims and defenses of claims\n   related to the installation, maintenance, operation, and use of the electric\n   vehicle charging station and provide a certificate of insurance naming the\n   unit owners&#8217; association as an additional insured on the unit\n   owner&#8217;s insurance policy for any claim related to the installation,\n   maintenance, operation, or use of the electric vehicle charging station within\n   14 days after receiving the unit owners&#8217; association&#8217;s approval to\n   install such charging station.\n\n   10. Reimburse the unit owners&#8217; association for any increase in common\n   expenses specifically attributable to the electric vehicle charging station\n   installation, including the actual cost of any increased insurance premium\n   amount, within 14 days&#8217; notice from the unit owners&#8217; association.\n\nD. The conditions imposed pursuant to this section on unit owners for\ninstallation of an electric vehicle charging station shall run with title to the\nunit to which the limited common element parking space is appurtenant.\n\nE. Any unit owner installing an electric vehicle charging station in a unit or\non a limited common element parking space appurtenant to the unit owned by the\nunit owner shall indemnify and hold the unit owners&#8217; association harmless\nfrom all liability, including reasonable attorney fees incurred by the\nassociation resulting from a claim, arising out of the installation,\nmaintenance, operation, or use of such electric charging station. A unit\nowners&#8217; association may require the unit owner to obtain and maintain\ninsurance covering claims and defenses of claims related to the installation,\nmaintenance, operation, or use of the electric vehicle charging station and\nrequire the unit owners&#8217; association to be included as a named insured on\nsuch policy.\n\nHISTORY: 2020, c. 1012.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}