{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-234.2.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-234.2.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-234.2.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-234.2.html"}],"law_id":56457,"edition_id":1,"section_id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","history":"1972, c. 537; 2007, cc. 888, 933.","full_text":"The Commission shall review the rates of any public utility on an annual basis when, in the opinion of the Commission, such annual review is in the public interest, provided that the rates of a public utility subject to \u00a7 56-585.1 shall be reviewed in accordance with subsection A of that section.","order_by":null,"text":{"0":{"id":206700,"text":"The Commission shall review the rates of any public utility on an annual basis when, in the opinion of the Commission, such annual review is in the public interest, provided that the rates of a public utility subject to \u00a7 56-585.1 shall be reviewed in accordance with subsection A of that section.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14465,"edition_id":1,"name":"Services, Rates, Charges, Etc","identifier":"2","label":"article","depth":3,"order_by":1,"parent_id":13238,"metadata":{},"date_created":"2026-06-26 03:48:13","date_modified":"2026-06-26 03:48:13","permalink":{"id":248755,"object_type":"structure","relational_id":14465,"identifier":"2","token":"56\/10\/2","url":"\/56\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13238,"edition_id":1,"name":"Heat, Light, Power, Water and Other Utility Companies Generally","identifier":"10","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":248721,"object_type":"structure","relational_id":13238,"identifier":"10","token":"56\/10","url":"\/56\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":87361,"structure_id":14465,"section_number":"56-234","catch_line":"Duty to furnish adequate service at reasonable and uniform rates","url":"\/56-234\/","token":"56\/10\/2\/56-234","metadata":false},{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},{"id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","metadata":false},{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},{"id":72152,"structure_id":14465,"section_number":"56-234.4","catch_line":"Authority to investigate utility operations to determine efficiency","url":"\/56-234.4\/","token":"56\/10\/2\/56-234.4","metadata":false},{"id":84236,"structure_id":14465,"section_number":"56-234.5","catch_line":"Required disclosure by certain officers and directors of certain utilities","url":"\/56-234.5\/","token":"56\/10\/2\/56-234.5","metadata":false},{"id":77453,"structure_id":14465,"section_number":"56-235","catch_line":"When Commission may fix rates, schedules, etc.; conformance with chapter","url":"\/56-235\/","token":"56\/10\/2\/56-235","metadata":false},{"id":85095,"structure_id":14465,"section_number":"56-235.1","catch_line":"Conservation of energy and capital resources","url":"\/56-235.1\/","token":"56\/10\/2\/56-235.1","metadata":false},{"id":57116,"structure_id":14465,"section_number":"56-235.10","catch_line":"Recovery of eligible safety activity costs; administration; procedure","url":"\/56-235.10\/","token":"56\/10\/2\/56-235.10","metadata":false},{"id":68057,"structure_id":14465,"section_number":"56-235.11","catch_line":"Retail rates of affiliated water utilities","url":"\/56-235.11\/","token":"56\/10\/2\/56-235.11","metadata":false},{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},{"id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","metadata":false},{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},{"id":62621,"structure_id":14465,"section_number":"56-235.2","catch_line":"All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies","url":"\/56-235.2\/","token":"56\/10\/2\/56-235.2","metadata":false},{"id":66652,"structure_id":14465,"section_number":"56-235.3","catch_line":"Procedures for investigation of rate applications","url":"\/56-235.3\/","token":"56\/10\/2\/56-235.3","metadata":false},{"id":63163,"structure_id":14465,"section_number":"56-235.4","catch_line":"Prohibition of multiple rate increases within any twelve-month period; exception","url":"\/56-235.4\/","token":"56\/10\/2\/56-235.4","metadata":false},{"id":55844,"structure_id":14465,"section_number":"56-235.5","catch_line":"Telephone regulatory alternatives","url":"\/56-235.5\/","token":"56\/10\/2\/56-235.5","metadata":false},{"id":87078,"structure_id":14465,"section_number":"56-235.5:1","catch_line":"Local exchange telephone service competition policy","url":"\/56-235.5_1\/","token":"56\/10\/2\/56-235.5_1","metadata":false},{"id":71641,"structure_id":14465,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","url":"\/56-235.6\/","token":"56\/10\/2\/56-235.6","metadata":false},{"id":77670,"structure_id":14465,"section_number":"56-235.7","catch_line":"Jurisdiction of Commission when federal governmental facility ceases to be retail customer of electric utility","url":"\/56-235.7\/","token":"56\/10\/2\/56-235.7","metadata":false},{"id":78685,"structure_id":14465,"section_number":"56-235.8","catch_line":"Retail supply choice for natural gas customers","url":"\/56-235.8\/","token":"56\/10\/2\/56-235.8","metadata":false},{"id":62516,"structure_id":14465,"section_number":"56-235.9","catch_line":"Recovery of funds used for capital projects prior to a rate case for strategic natural gas facilities","url":"\/56-235.9\/","token":"56\/10\/2\/56-235.9","metadata":false},{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},{"id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","metadata":false},{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},{"id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","metadata":false},{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},{"id":80068,"structure_id":14465,"section_number":"56-238","catch_line":"Suspension of proposed rates, etc.; investigation; effectiveness of rates pending investigation and subject to bond; fixing reasonable rates, etc","url":"\/56-238\/","token":"56\/10\/2\/56-238","metadata":false},{"id":78378,"structure_id":14465,"section_number":"56-239","catch_line":"Appeal from action of Commission","url":"\/56-239\/","token":"56\/10\/2\/56-239","metadata":false},{"id":64527,"structure_id":14465,"section_number":"56-240","catch_line":"Proposed rates, etc., or changes thereof, not suspended effective subject to later change by Commission; refund or credit; appeal; investor-owned public utilities required to show increase complies with \u00a7 56-235.2","url":"\/56-240\/","token":"56\/10\/2\/56-240","metadata":false},{"id":57241,"structure_id":14465,"section_number":"56-241","catch_line":"Rates of telephone companies","url":"\/56-241\/","token":"56\/10\/2\/56-241","metadata":false},{"id":83712,"structure_id":14465,"section_number":"56-241.1","catch_line":"Flat and measured telephone rates; certain rates prohibited","url":"\/56-241.1\/","token":"56\/10\/2\/56-241.1","metadata":false},{"id":74999,"structure_id":14465,"section_number":"56-241.2","catch_line":"Approval of rates for resale of telephone service","url":"\/56-241.2\/","token":"56\/10\/2\/56-241.2","metadata":false},{"id":72101,"structure_id":14465,"section_number":"56-242","catch_line":"Temporary reduction of rates","url":"\/56-242\/","token":"56\/10\/2\/56-242","metadata":false},{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},{"id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","url":"\/56-244\/","token":"56\/10\/2\/56-244","metadata":false},{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},{"id":75868,"structure_id":14465,"section_number":"56-245.1","catch_line":"Meters to be kept in good working condition; defective meters","url":"\/56-245.1\/","token":"56\/10\/2\/56-245.1","metadata":false},{"id":80955,"structure_id":14465,"section_number":"56-245.1:1","catch_line":"Customers to be notified about nuclear emergency evacuation plans","url":"\/56-245.1_1\/","token":"56\/10\/2\/56-245.1_1","metadata":false},{"id":61620,"structure_id":14465,"section_number":"56-245.1:2","catch_line":"Customers to be notified of renewable power options","url":"\/56-245.1_2\/","token":"56\/10\/2\/56-245.1_2","metadata":false},{"id":70183,"structure_id":14465,"section_number":"56-245.1:3","catch_line":"Disconnection suspension for utilities","url":"\/56-245.1_3\/","token":"56\/10\/2\/56-245.1_3","metadata":false},{"id":86241,"structure_id":14465,"section_number":"56-245.1:4","catch_line":"Notice procedures for nonpayment; disconnecting utility service","url":"\/56-245.1_4\/","token":"56\/10\/2\/56-245.1_4","metadata":false}],"previous_section":{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},"next_section":{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-234.2\/","history_text":"<p>This law was first created in 1972. The record of its establishment is cataloged in chapter 537 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1972 \u201cActs\u201d aren\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2007, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?071+ful+CHAP0888\">888<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?071+ful+CHAP0933\">933<\/a>.<\/p>","references":[{"id":71641,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","order_by":null,"url":"\/56-235.6\/"},{"id":77174,"section_number":"56-602","catch_line":"Conservation and ratemaking efficiency plans","order_by":null,"url":"\/56-602\/"}],"refers_to":[{"id":67687,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","order_by":null,"url":"\/56-585.1\/"}],"permalink":{"id":248765,"object_type":"law","relational_id":56457,"identifier":"56-234.2","token":"56\/10\/2\/56-234.2","url":"\/56-234.2\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","dublin_core":{"Title":"Review of rates","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-234.2","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The <span class=\"dictionary\">Commission<\/span> shall review the <span class=\"dictionary\">rates<\/span> of any public utility on an annual basis when, in the <span class=\"dictionary\">opinion<\/span> of the <span class=\"dictionary\">Commission<\/span>, such annual review is in the public interest, provided that the <span class=\"dictionary\">rates<\/span> of a public utility subject to \u00a7&nbsp;<a class=\"law\" title=\"Generation, distribution, and transmission rates after capped rates terminate or expire\" href=\"\/56-585.1\/\">56-585.1<\/a> shall be reviewed in accordance with subsection A of that section.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nREVIEW OF RATES (\u00a7 56-234.2)\n\nThe Commission shall review the rates of any public utility on an annual basis\nwhen, in the opinion of the Commission, such annual review is in the public\ninterest, provided that the rates of a public utility subject to \u00a7 56-585.1\nshall be reviewed in accordance with subsection A of that section.\n\nHISTORY: 1972, c. 537; 2007, cc. 888, 933.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}