{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-235.1_1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-235.1_1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-235.1_1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-235.1_1.html"}],"law_id":80899,"edition_id":1,"section_id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","history":"2009, c. 745.","full_text":"A\n\nThe Commission shall adopt regulations pursuant to its rules of practice and procedure that require an electric utility to provide a rate for stand-by service to customers that operate a cogeneration facility in the Commonwealth that generates renewable energy, as defined in &#xA7; 56-576. Such regulations shall allow the electric utility to recover all of the costs that are identified by the electric utility and determined by the Commission to be related to the provision of the stand-by service, including but not limited to the costs of transformers and other equipment required to provide stand-by service and the costs of capacity and generation, including but not limited to fuel costs.B\n\nWithin 90 days following the effective date of the regulations adopted pursuant to subsection A, each public utility providing electric service in the Commonwealth shall submit a plan setting forth how the utility will comply with the regulations if it does not already have stand-by provisions approved by the Commission that comply with the regulations. The Commission shall, after notice and the opportunity for hearing, determine whether a utility&#8217;s plan complies with the regulations.","order_by":null,"text":{"0":{"id":289997,"text":"The Commission shall adopt regulations pursuant to its rules of practice and procedure that require an electric utility to provide a rate for stand-by service to customers that operate a cogeneration facility in the Commonwealth that generates renewable energy, as defined in &#xA7; 56-576. Such regulations shall allow the electric utility to recover all of the costs that are identified by the electric utility and determined by the Commission to be related to the provision of the stand-by service, including but not limited to the costs of transformers and other equipment required to provide stand-by service and the costs of capacity and generation, including but not limited to fuel costs.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":289998,"text":"Within 90 days following the effective date of the regulations adopted pursuant to subsection A, each public utility providing electric service in the Commonwealth shall submit a plan setting forth how the utility will comply with the regulations if it does not already have stand-by provisions approved by the Commission that comply with the regulations. The Commission shall, after notice and the opportunity for hearing, determine whether a utility&#8217;s plan complies with the regulations.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A"}},"ancestry":[{"id":14465,"edition_id":1,"name":"Services, Rates, Charges, Etc","identifier":"2","label":"article","depth":3,"order_by":1,"parent_id":13238,"metadata":{},"date_created":"2026-06-26 03:48:13","date_modified":"2026-06-26 03:48:13","permalink":{"id":248755,"object_type":"structure","relational_id":14465,"identifier":"2","token":"56\/10\/2","url":"\/56\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13238,"edition_id":1,"name":"Heat, Light, Power, Water and Other Utility Companies Generally","identifier":"10","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":248721,"object_type":"structure","relational_id":13238,"identifier":"10","token":"56\/10","url":"\/56\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":87361,"structure_id":14465,"section_number":"56-234","catch_line":"Duty to furnish adequate service at reasonable and uniform rates","url":"\/56-234\/","token":"56\/10\/2\/56-234","metadata":false},{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},{"id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","metadata":false},{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},{"id":72152,"structure_id":14465,"section_number":"56-234.4","catch_line":"Authority to investigate utility operations to determine efficiency","url":"\/56-234.4\/","token":"56\/10\/2\/56-234.4","metadata":false},{"id":84236,"structure_id":14465,"section_number":"56-234.5","catch_line":"Required disclosure by certain officers and directors of certain utilities","url":"\/56-234.5\/","token":"56\/10\/2\/56-234.5","metadata":false},{"id":77453,"structure_id":14465,"section_number":"56-235","catch_line":"When Commission may fix rates, schedules, etc.; conformance with chapter","url":"\/56-235\/","token":"56\/10\/2\/56-235","metadata":false},{"id":85095,"structure_id":14465,"section_number":"56-235.1","catch_line":"Conservation of energy and capital resources","url":"\/56-235.1\/","token":"56\/10\/2\/56-235.1","metadata":false},{"id":57116,"structure_id":14465,"section_number":"56-235.10","catch_line":"Recovery of eligible safety activity costs; administration; procedure","url":"\/56-235.10\/","token":"56\/10\/2\/56-235.10","metadata":false},{"id":68057,"structure_id":14465,"section_number":"56-235.11","catch_line":"Retail rates of affiliated water utilities","url":"\/56-235.11\/","token":"56\/10\/2\/56-235.11","metadata":false},{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},{"id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","metadata":false},{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},{"id":62621,"structure_id":14465,"section_number":"56-235.2","catch_line":"All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies","url":"\/56-235.2\/","token":"56\/10\/2\/56-235.2","metadata":false},{"id":66652,"structure_id":14465,"section_number":"56-235.3","catch_line":"Procedures for investigation of rate applications","url":"\/56-235.3\/","token":"56\/10\/2\/56-235.3","metadata":false},{"id":63163,"structure_id":14465,"section_number":"56-235.4","catch_line":"Prohibition of multiple rate increases within any twelve-month period; exception","url":"\/56-235.4\/","token":"56\/10\/2\/56-235.4","metadata":false},{"id":55844,"structure_id":14465,"section_number":"56-235.5","catch_line":"Telephone regulatory alternatives","url":"\/56-235.5\/","token":"56\/10\/2\/56-235.5","metadata":false},{"id":87078,"structure_id":14465,"section_number":"56-235.5:1","catch_line":"Local exchange telephone service competition policy","url":"\/56-235.5_1\/","token":"56\/10\/2\/56-235.5_1","metadata":false},{"id":71641,"structure_id":14465,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","url":"\/56-235.6\/","token":"56\/10\/2\/56-235.6","metadata":false},{"id":77670,"structure_id":14465,"section_number":"56-235.7","catch_line":"Jurisdiction of Commission when federal governmental facility ceases to be retail customer of electric utility","url":"\/56-235.7\/","token":"56\/10\/2\/56-235.7","metadata":false},{"id":78685,"structure_id":14465,"section_number":"56-235.8","catch_line":"Retail supply choice for natural gas customers","url":"\/56-235.8\/","token":"56\/10\/2\/56-235.8","metadata":false},{"id":62516,"structure_id":14465,"section_number":"56-235.9","catch_line":"Recovery of funds used for capital projects prior to a rate case for strategic natural gas facilities","url":"\/56-235.9\/","token":"56\/10\/2\/56-235.9","metadata":false},{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},{"id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","metadata":false},{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},{"id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","metadata":false},{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},{"id":80068,"structure_id":14465,"section_number":"56-238","catch_line":"Suspension of proposed rates, etc.; investigation; effectiveness of rates pending investigation and subject to bond; fixing reasonable rates, etc","url":"\/56-238\/","token":"56\/10\/2\/56-238","metadata":false},{"id":78378,"structure_id":14465,"section_number":"56-239","catch_line":"Appeal from action of Commission","url":"\/56-239\/","token":"56\/10\/2\/56-239","metadata":false},{"id":64527,"structure_id":14465,"section_number":"56-240","catch_line":"Proposed rates, etc., or changes thereof, not suspended effective subject to later change by Commission; refund or credit; appeal; investor-owned public utilities required to show increase complies with \u00a7 56-235.2","url":"\/56-240\/","token":"56\/10\/2\/56-240","metadata":false},{"id":57241,"structure_id":14465,"section_number":"56-241","catch_line":"Rates of telephone companies","url":"\/56-241\/","token":"56\/10\/2\/56-241","metadata":false},{"id":83712,"structure_id":14465,"section_number":"56-241.1","catch_line":"Flat and measured telephone rates; certain rates prohibited","url":"\/56-241.1\/","token":"56\/10\/2\/56-241.1","metadata":false},{"id":74999,"structure_id":14465,"section_number":"56-241.2","catch_line":"Approval of rates for resale of telephone service","url":"\/56-241.2\/","token":"56\/10\/2\/56-241.2","metadata":false},{"id":72101,"structure_id":14465,"section_number":"56-242","catch_line":"Temporary reduction of rates","url":"\/56-242\/","token":"56\/10\/2\/56-242","metadata":false},{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},{"id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","url":"\/56-244\/","token":"56\/10\/2\/56-244","metadata":false},{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},{"id":75868,"structure_id":14465,"section_number":"56-245.1","catch_line":"Meters to be kept in good working condition; defective meters","url":"\/56-245.1\/","token":"56\/10\/2\/56-245.1","metadata":false},{"id":80955,"structure_id":14465,"section_number":"56-245.1:1","catch_line":"Customers to be notified about nuclear emergency evacuation plans","url":"\/56-245.1_1\/","token":"56\/10\/2\/56-245.1_1","metadata":false},{"id":61620,"structure_id":14465,"section_number":"56-245.1:2","catch_line":"Customers to be notified of renewable power options","url":"\/56-245.1_2\/","token":"56\/10\/2\/56-245.1_2","metadata":false},{"id":70183,"structure_id":14465,"section_number":"56-245.1:3","catch_line":"Disconnection suspension for utilities","url":"\/56-245.1_3\/","token":"56\/10\/2\/56-245.1_3","metadata":false},{"id":86241,"structure_id":14465,"section_number":"56-245.1:4","catch_line":"Notice procedures for nonpayment; disconnecting utility service","url":"\/56-245.1_4\/","token":"56\/10\/2\/56-245.1_4","metadata":false}],"previous_section":{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},"next_section":{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-235.1:1\/","history_text":"<p>This law was first created in 2009. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?091+ful+CHAP0745\">745<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":62210,"section_number":"56-576","catch_line":"Definitions","order_by":null,"url":"\/56-576\/"}],"permalink":{"id":248801,"object_type":"law","relational_id":80899,"identifier":"56-235.1:1","token":"56\/10\/2\/56-235.1_1","url":"\/56-235.1_1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","dublin_core":{"Title":"Rates for stand-by electric service at renewable cogeneration facilities","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-235.1:1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The <span class=\"dictionary\">Commission<\/span> shall adopt regulations pursuant to its rules of practice and procedure that require an electric utility to provide a <span class=\"dictionary\">rate<\/span> for stand-by service to customers that operate a cogeneration facility in the Commonwealth that generates renewable energy, as defined in &#xA7; <a class=\"law\" title=\"Definitions\" href=\"\/56-576\/\">56-576<\/a>. Such regulations shall allow the electric utility to recover all of the costs that are identified by the electric utility and determined by the <span class=\"dictionary\">Commission<\/span> to be related to the provision of the stand-by service, including but not limited to the costs of transformers and other equipment required to provide stand-by service and the costs of capacity and generation, including but not limited to fuel costs. <a id=\"paragraph-289997\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-235.1_1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Within 90 days following the effective date of the regulations adopted pursuant to subsection A, each public utility providing electric service in the Commonwealth shall submit a plan setting forth how the utility will comply with the regulations if it does not already have stand-by provisions approved by the <span class=\"dictionary\">Commission<\/span> that comply with the regulations. The <span class=\"dictionary\">Commission<\/span> shall, after notice and the opportunity for <span class=\"dictionary\">hearing<\/span>, determine whether a utility&#8217;s plan complies with the regulations. <a id=\"paragraph-289998\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-235.1_1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nRATES FOR STAND-BY ELECTRIC SERVICE AT RENEWABLE COGENERATION FACILITIES (\u00a7\n56-235.1:1)\n\nA. The Commission shall adopt regulations pursuant to its rules of practice and\nprocedure that require an electric utility to provide a rate for stand-by\nservice to customers that operate a cogeneration facility in the Commonwealth\nthat generates renewable energy, as defined in &#xA7; 56-576. Such regulations\nshall allow the electric utility to recover all of the costs that are identified\nby the electric utility and determined by the Commission to be related to the\nprovision of the stand-by service, including but not limited to the costs of\ntransformers and other equipment required to provide stand-by service and the\ncosts of capacity and generation, including but not limited to fuel costs.\n\nB. Within 90 days following the effective date of the regulations adopted\npursuant to subsection A, each public utility providing electric service in the\nCommonwealth shall submit a plan setting forth how the utility will comply with\nthe regulations if it does not already have stand-by provisions approved by the\nCommission that comply with the regulations. The Commission shall, after notice\nand the opportunity for hearing, determine whether a utility&#8217;s plan\ncomplies with the regulations.\n\nHISTORY: 2009, c. 745.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}