{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-236.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-236.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-236.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-236.1.html"}],"law_id":85571,"edition_id":1,"section_id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","history":"1978, c. 531; 1980, c. 259.","full_text":"No electric utility, subject to regulation by the Commission, shall charge a church for its services by any method other than actual kilowatt hour consumption; nor shall any such electric utility charge a church for its electrical service at a rate in excess of the applicable residential rate for the area in which it is located. As used in this section, &#8220;church&#8221; shall be limited to the synagogue or church building in which the sanctuary or principal place of worship is located and to all educational buildings which are physically attached by enclosed corridors or hallways to the building in which the sanctuary or principal place of worship is located.\n\t\tNotwithstanding the requirements of the first sentence of this section, the Commission may, after a hearing upon application by an electric utility, set a rate for churches in excess of the applicable residential rate if the utility proves that the cost of service for churches exceeds the cost of service for those other customers under the residential rate. In setting such a rate, the Commission shall consider the special use characteristics of churches, such as the amount of electricity utilized during off-peak power periods for the utility. The provisions of this section shall not apply to churches which are served by an electric utility having a time of usage rate approved by the Commission and which have elected to be on such time of usage rate.","order_by":null,"text":{"0":{"id":306526,"text":"No electric utility, subject to regulation by the Commission, shall charge a church for its services by any method other than actual kilowatt hour consumption; nor shall any such electric utility charge a church for its electrical service at a rate in excess of the applicable residential rate for the area in which it is located. As used in this section, &#8220;church&#8221; shall be limited to the synagogue or church building in which the sanctuary or principal place of worship is located and to all educational buildings which are physically attached by enclosed corridors or hallways to the building in which the sanctuary or principal place of worship is located.\n\t\tNotwithstanding the requirements of the first sentence of this section, the Commission may, after a hearing upon application by an electric utility, set a rate for churches in excess of the applicable residential rate if the utility proves that the cost of service for churches exceeds the cost of service for those other customers under the residential rate. In setting such a rate, the Commission shall consider the special use characteristics of churches, such as the amount of electricity utilized during off-peak power periods for the utility. The provisions of this section shall not apply to churches which are served by an electric utility having a time of usage rate approved by the Commission and which have elected to be on such time of usage rate.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14465,"edition_id":1,"name":"Services, Rates, Charges, Etc","identifier":"2","label":"article","depth":3,"order_by":1,"parent_id":13238,"metadata":{},"date_created":"2026-06-26 03:48:13","date_modified":"2026-06-26 03:48:13","permalink":{"id":248755,"object_type":"structure","relational_id":14465,"identifier":"2","token":"56\/10\/2","url":"\/56\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13238,"edition_id":1,"name":"Heat, Light, Power, Water and Other Utility Companies Generally","identifier":"10","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":248721,"object_type":"structure","relational_id":13238,"identifier":"10","token":"56\/10","url":"\/56\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":87361,"structure_id":14465,"section_number":"56-234","catch_line":"Duty to furnish adequate service at reasonable and uniform rates","url":"\/56-234\/","token":"56\/10\/2\/56-234","metadata":false},{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},{"id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","metadata":false},{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},{"id":72152,"structure_id":14465,"section_number":"56-234.4","catch_line":"Authority to investigate utility operations to determine efficiency","url":"\/56-234.4\/","token":"56\/10\/2\/56-234.4","metadata":false},{"id":84236,"structure_id":14465,"section_number":"56-234.5","catch_line":"Required disclosure by certain officers and directors of certain utilities","url":"\/56-234.5\/","token":"56\/10\/2\/56-234.5","metadata":false},{"id":77453,"structure_id":14465,"section_number":"56-235","catch_line":"When Commission may fix rates, schedules, etc.; conformance with chapter","url":"\/56-235\/","token":"56\/10\/2\/56-235","metadata":false},{"id":85095,"structure_id":14465,"section_number":"56-235.1","catch_line":"Conservation of energy and capital resources","url":"\/56-235.1\/","token":"56\/10\/2\/56-235.1","metadata":false},{"id":57116,"structure_id":14465,"section_number":"56-235.10","catch_line":"Recovery of eligible safety activity costs; administration; procedure","url":"\/56-235.10\/","token":"56\/10\/2\/56-235.10","metadata":false},{"id":68057,"structure_id":14465,"section_number":"56-235.11","catch_line":"Retail rates of affiliated water utilities","url":"\/56-235.11\/","token":"56\/10\/2\/56-235.11","metadata":false},{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},{"id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","metadata":false},{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},{"id":62621,"structure_id":14465,"section_number":"56-235.2","catch_line":"All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies","url":"\/56-235.2\/","token":"56\/10\/2\/56-235.2","metadata":false},{"id":66652,"structure_id":14465,"section_number":"56-235.3","catch_line":"Procedures for investigation of rate applications","url":"\/56-235.3\/","token":"56\/10\/2\/56-235.3","metadata":false},{"id":63163,"structure_id":14465,"section_number":"56-235.4","catch_line":"Prohibition of multiple rate increases within any twelve-month period; exception","url":"\/56-235.4\/","token":"56\/10\/2\/56-235.4","metadata":false},{"id":55844,"structure_id":14465,"section_number":"56-235.5","catch_line":"Telephone regulatory alternatives","url":"\/56-235.5\/","token":"56\/10\/2\/56-235.5","metadata":false},{"id":87078,"structure_id":14465,"section_number":"56-235.5:1","catch_line":"Local exchange telephone service competition policy","url":"\/56-235.5_1\/","token":"56\/10\/2\/56-235.5_1","metadata":false},{"id":71641,"structure_id":14465,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","url":"\/56-235.6\/","token":"56\/10\/2\/56-235.6","metadata":false},{"id":77670,"structure_id":14465,"section_number":"56-235.7","catch_line":"Jurisdiction of Commission when federal governmental facility ceases to be retail customer of electric utility","url":"\/56-235.7\/","token":"56\/10\/2\/56-235.7","metadata":false},{"id":78685,"structure_id":14465,"section_number":"56-235.8","catch_line":"Retail supply choice for natural gas customers","url":"\/56-235.8\/","token":"56\/10\/2\/56-235.8","metadata":false},{"id":62516,"structure_id":14465,"section_number":"56-235.9","catch_line":"Recovery of funds used for capital projects prior to a rate case for strategic natural gas facilities","url":"\/56-235.9\/","token":"56\/10\/2\/56-235.9","metadata":false},{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},{"id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","metadata":false},{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},{"id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","metadata":false},{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},{"id":80068,"structure_id":14465,"section_number":"56-238","catch_line":"Suspension of proposed rates, etc.; investigation; effectiveness of rates pending investigation and subject to bond; fixing reasonable rates, etc","url":"\/56-238\/","token":"56\/10\/2\/56-238","metadata":false},{"id":78378,"structure_id":14465,"section_number":"56-239","catch_line":"Appeal from action of Commission","url":"\/56-239\/","token":"56\/10\/2\/56-239","metadata":false},{"id":64527,"structure_id":14465,"section_number":"56-240","catch_line":"Proposed rates, etc., or changes thereof, not suspended effective subject to later change by Commission; refund or credit; appeal; investor-owned public utilities required to show increase complies with \u00a7 56-235.2","url":"\/56-240\/","token":"56\/10\/2\/56-240","metadata":false},{"id":57241,"structure_id":14465,"section_number":"56-241","catch_line":"Rates of telephone companies","url":"\/56-241\/","token":"56\/10\/2\/56-241","metadata":false},{"id":83712,"structure_id":14465,"section_number":"56-241.1","catch_line":"Flat and measured telephone rates; certain rates prohibited","url":"\/56-241.1\/","token":"56\/10\/2\/56-241.1","metadata":false},{"id":74999,"structure_id":14465,"section_number":"56-241.2","catch_line":"Approval of rates for resale of telephone service","url":"\/56-241.2\/","token":"56\/10\/2\/56-241.2","metadata":false},{"id":72101,"structure_id":14465,"section_number":"56-242","catch_line":"Temporary reduction of rates","url":"\/56-242\/","token":"56\/10\/2\/56-242","metadata":false},{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},{"id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","url":"\/56-244\/","token":"56\/10\/2\/56-244","metadata":false},{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},{"id":75868,"structure_id":14465,"section_number":"56-245.1","catch_line":"Meters to be kept in good working condition; defective meters","url":"\/56-245.1\/","token":"56\/10\/2\/56-245.1","metadata":false},{"id":80955,"structure_id":14465,"section_number":"56-245.1:1","catch_line":"Customers to be notified about nuclear emergency evacuation plans","url":"\/56-245.1_1\/","token":"56\/10\/2\/56-245.1_1","metadata":false},{"id":61620,"structure_id":14465,"section_number":"56-245.1:2","catch_line":"Customers to be notified of renewable power options","url":"\/56-245.1_2\/","token":"56\/10\/2\/56-245.1_2","metadata":false},{"id":70183,"structure_id":14465,"section_number":"56-245.1:3","catch_line":"Disconnection suspension for utilities","url":"\/56-245.1_3\/","token":"56\/10\/2\/56-245.1_3","metadata":false},{"id":86241,"structure_id":14465,"section_number":"56-245.1:4","catch_line":"Notice procedures for nonpayment; disconnecting utility service","url":"\/56-245.1_4\/","token":"56\/10\/2\/56-245.1_4","metadata":false}],"previous_section":{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},"next_section":{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-236.1\/","history_text":"<p>This law was first created in 1978. The record of its establishment is cataloged in chapter 531 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1978 \u201cActs\u201d aren\u2019t available online. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 1980, chapter 259.<\/p>","references":false,"refers_to":false,"permalink":{"id":248849,"object_type":"law","relational_id":85571,"identifier":"56-236.1","token":"56\/10\/2\/56-236.1","url":"\/56-236.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","dublin_core":{"Title":"Rates to be charged churches","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-236.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>No electric utility, subject to regulation by the <span class=\"dictionary\">Commission<\/span>, shall charge a church for its services by any method other than actual kilowatt hour consumption; nor shall any such electric utility charge a church for its electrical service at a <span class=\"dictionary\">rate<\/span> in excess of the applicable residential <span class=\"dictionary\">rate<\/span> for the area in which it is located. As used in this section, &#8220;church&#8221; shall be limited to the synagogue or church building in which the sanctuary or principal place of worship is located and to all educational buildings which are physically attached by enclosed corridors or hallways to the building in which the sanctuary or principal place of worship is located.\n\t\tNotwithstanding the requirements of the first sentence of this section, the <span class=\"dictionary\">Commission<\/span> may, after a <span class=\"dictionary\">hearing<\/span> upon application by an electric utility, set a <span class=\"dictionary\">rate<\/span> for churches in excess of the applicable residential <span class=\"dictionary\">rate<\/span> if the utility proves that the cost of service for churches exceeds the cost of service for those other customers under the residential <span class=\"dictionary\">rate<\/span>. In setting such a <span class=\"dictionary\">rate<\/span>, the <span class=\"dictionary\">Commission<\/span> shall consider the special use characteristics of churches, such as the amount of electricity utilized during off-peak power periods for the utility. The provisions of this section shall not apply to churches which are served by an electric utility having a time of usage <span class=\"dictionary\">rate<\/span> approved by the <span class=\"dictionary\">Commission<\/span> and which have elected to be on such time of usage <span class=\"dictionary\">rate<\/span>.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nRATES TO BE CHARGED CHURCHES (\u00a7 56-236.1)\n\nNo electric utility, subject to regulation by the Commission, shall charge a\nchurch for its services by any method other than actual kilowatt hour\nconsumption; nor shall any such electric utility charge a church for its\nelectrical service at a rate in excess of the applicable residential rate for\nthe area in which it is located. As used in this section, &#8220;church&#8221;\nshall be limited to the synagogue or church building in which the sanctuary or\nprincipal place of worship is located and to all educational buildings which are\nphysically attached by enclosed corridors or hallways to the building in which\nthe sanctuary or principal place of worship is located.\n\t\tNotwithstanding the requirements of the first sentence of this section, the\nCommission may, after a hearing upon application by an electric utility, set a\nrate for churches in excess of the applicable residential rate if the utility\nproves that the cost of service for churches exceeds the cost of service for\nthose other customers under the residential rate. In setting such a rate, the\nCommission shall consider the special use characteristics of churches, such as\nthe amount of electricity utilized during off-peak power periods for the\nutility. The provisions of this section shall not apply to churches which are\nserved by an electric utility having a time of usage rate approved by the\nCommission and which have elected to be on such time of usage rate.\n\nHISTORY: 1978, c. 531; 1980, c. 259.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}