{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-237.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-237.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-237.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-237.1.html"}],"law_id":64233,"edition_id":1,"section_id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","history":"1976, c. 763; 2011, cc. 738, 740; 2016, cc. 191, 283.","full_text":"A\n\nEvery public utility, other than a public utility providing water or sewer service, that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules and regulations, shall cause to have published, once a week for four successive weeks, in one or more newspapers in circulation in its franchise area and approved by the Commission, a notice of its intention to change its rates, tolls, charges, rules and regulations. Every public utility providing water or sewer service that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules and regulations, shall cause to have published at least once in one or more newspapers in circulation in its franchise area and approved by the Commission, a notice of its intention to change its rates, tolls, charges, rules and regulations. The last such publication shall appear no less than 30 days prior to the time any changed rates, tolls, charges, rules and regulations shall take effect. This notice shall be in such form and contain such information as prescribed by the Commission.B\n\nEvery public utility that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules, and regulations shall mail to each of its customers who receive periodic statements of charges by mail or send electronically to each of its customers who receive periodic statements of charges electronically, along with its periodic invoice, bill, or other statement advising the customer of its charges, a notice of its intention to change its rates, tolls, charges, rules, and regulations. This notice shall be mailed or sent electronically no less than 30 days prior to the time any such changed rate, toll, charge, rule, and regulation shall take effect. This notice shall be in such form and contain such information as prescribed by the Commission.C\n\nExcept for public utilities providing water or sewer service, the Commission may dispense with either or both of the requirements contained in subsections A and B if either or both such requirements are not necessary to provide adequate notice to all of the public utilities&#8217; customers. The Commission may prescribe additional requirements for notification to a public utility&#8217;s customers of its intention to change its rates, tolls, charges, rules, and regulations.","order_by":null,"text":{"0":{"id":233840,"text":"Every public utility, other than a public utility providing water or sewer service, that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules and regulations, shall cause to have published, once a week for four successive weeks, in one or more newspapers in circulation in its franchise area and approved by the Commission, a notice of its intention to change its rates, tolls, charges, rules and regulations. Every public utility providing water or sewer service that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules and regulations, shall cause to have published at least once in one or more newspapers in circulation in its franchise area and approved by the Commission, a notice of its intention to change its rates, tolls, charges, rules and regulations. The last such publication shall appear no less than 30 days prior to the time any changed rates, tolls, charges, rules and regulations shall take effect. This notice shall be in such form and contain such information as prescribed by the Commission.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":233841,"text":"Every public utility that indicates upon existing required schedules, or upon new schedules required to be filed in lieu thereof, changes in rates, tolls, charges, rules, and regulations shall mail to each of its customers who receive periodic statements of charges by mail or send electronically to each of its customers who receive periodic statements of charges electronically, along with its periodic invoice, bill, or other statement advising the customer of its charges, a notice of its intention to change its rates, tolls, charges, rules, and regulations. This notice shall be mailed or sent electronically no less than 30 days prior to the time any such changed rate, toll, charge, rule, and regulation shall take effect. This notice shall be in such form and contain such information as prescribed by the Commission.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":233842,"text":"Except for public utilities providing water or sewer service, the Commission may dispense with either or both of the requirements contained in subsections A and B if either or both such requirements are not necessary to provide adequate notice to all of the public utilities&#8217; customers. The Commission may prescribe additional requirements for notification to a public utility&#8217;s customers of its intention to change its rates, tolls, charges, rules, and regulations.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":14465,"edition_id":1,"name":"Services, Rates, Charges, Etc","identifier":"2","label":"article","depth":3,"order_by":1,"parent_id":13238,"metadata":{},"date_created":"2026-06-26 03:48:13","date_modified":"2026-06-26 03:48:13","permalink":{"id":248755,"object_type":"structure","relational_id":14465,"identifier":"2","token":"56\/10\/2","url":"\/56\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13238,"edition_id":1,"name":"Heat, Light, Power, Water and Other Utility Companies Generally","identifier":"10","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":248721,"object_type":"structure","relational_id":13238,"identifier":"10","token":"56\/10","url":"\/56\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":87361,"structure_id":14465,"section_number":"56-234","catch_line":"Duty to furnish adequate service at reasonable and uniform rates","url":"\/56-234\/","token":"56\/10\/2\/56-234","metadata":false},{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},{"id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","metadata":false},{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},{"id":72152,"structure_id":14465,"section_number":"56-234.4","catch_line":"Authority to investigate utility operations to determine efficiency","url":"\/56-234.4\/","token":"56\/10\/2\/56-234.4","metadata":false},{"id":84236,"structure_id":14465,"section_number":"56-234.5","catch_line":"Required disclosure by certain officers and directors of certain utilities","url":"\/56-234.5\/","token":"56\/10\/2\/56-234.5","metadata":false},{"id":77453,"structure_id":14465,"section_number":"56-235","catch_line":"When Commission may fix rates, schedules, etc.; conformance with chapter","url":"\/56-235\/","token":"56\/10\/2\/56-235","metadata":false},{"id":85095,"structure_id":14465,"section_number":"56-235.1","catch_line":"Conservation of energy and capital resources","url":"\/56-235.1\/","token":"56\/10\/2\/56-235.1","metadata":false},{"id":57116,"structure_id":14465,"section_number":"56-235.10","catch_line":"Recovery of eligible safety activity costs; administration; procedure","url":"\/56-235.10\/","token":"56\/10\/2\/56-235.10","metadata":false},{"id":68057,"structure_id":14465,"section_number":"56-235.11","catch_line":"Retail rates of affiliated water utilities","url":"\/56-235.11\/","token":"56\/10\/2\/56-235.11","metadata":false},{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},{"id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","metadata":false},{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},{"id":62621,"structure_id":14465,"section_number":"56-235.2","catch_line":"All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies","url":"\/56-235.2\/","token":"56\/10\/2\/56-235.2","metadata":false},{"id":66652,"structure_id":14465,"section_number":"56-235.3","catch_line":"Procedures for investigation of rate applications","url":"\/56-235.3\/","token":"56\/10\/2\/56-235.3","metadata":false},{"id":63163,"structure_id":14465,"section_number":"56-235.4","catch_line":"Prohibition of multiple rate increases within any twelve-month period; exception","url":"\/56-235.4\/","token":"56\/10\/2\/56-235.4","metadata":false},{"id":55844,"structure_id":14465,"section_number":"56-235.5","catch_line":"Telephone regulatory alternatives","url":"\/56-235.5\/","token":"56\/10\/2\/56-235.5","metadata":false},{"id":87078,"structure_id":14465,"section_number":"56-235.5:1","catch_line":"Local exchange telephone service competition policy","url":"\/56-235.5_1\/","token":"56\/10\/2\/56-235.5_1","metadata":false},{"id":71641,"structure_id":14465,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","url":"\/56-235.6\/","token":"56\/10\/2\/56-235.6","metadata":false},{"id":77670,"structure_id":14465,"section_number":"56-235.7","catch_line":"Jurisdiction of Commission when federal governmental facility ceases to be retail customer of electric utility","url":"\/56-235.7\/","token":"56\/10\/2\/56-235.7","metadata":false},{"id":78685,"structure_id":14465,"section_number":"56-235.8","catch_line":"Retail supply choice for natural gas customers","url":"\/56-235.8\/","token":"56\/10\/2\/56-235.8","metadata":false},{"id":62516,"structure_id":14465,"section_number":"56-235.9","catch_line":"Recovery of funds used for capital projects prior to a rate case for strategic natural gas facilities","url":"\/56-235.9\/","token":"56\/10\/2\/56-235.9","metadata":false},{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},{"id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","metadata":false},{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},{"id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","metadata":false},{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},{"id":80068,"structure_id":14465,"section_number":"56-238","catch_line":"Suspension of proposed rates, etc.; investigation; effectiveness of rates pending investigation and subject to bond; fixing reasonable rates, etc","url":"\/56-238\/","token":"56\/10\/2\/56-238","metadata":false},{"id":78378,"structure_id":14465,"section_number":"56-239","catch_line":"Appeal from action of Commission","url":"\/56-239\/","token":"56\/10\/2\/56-239","metadata":false},{"id":64527,"structure_id":14465,"section_number":"56-240","catch_line":"Proposed rates, etc., or changes thereof, not suspended effective subject to later change by Commission; refund or credit; appeal; investor-owned public utilities required to show increase complies with \u00a7 56-235.2","url":"\/56-240\/","token":"56\/10\/2\/56-240","metadata":false},{"id":57241,"structure_id":14465,"section_number":"56-241","catch_line":"Rates of telephone companies","url":"\/56-241\/","token":"56\/10\/2\/56-241","metadata":false},{"id":83712,"structure_id":14465,"section_number":"56-241.1","catch_line":"Flat and measured telephone rates; certain rates prohibited","url":"\/56-241.1\/","token":"56\/10\/2\/56-241.1","metadata":false},{"id":74999,"structure_id":14465,"section_number":"56-241.2","catch_line":"Approval of rates for resale of telephone service","url":"\/56-241.2\/","token":"56\/10\/2\/56-241.2","metadata":false},{"id":72101,"structure_id":14465,"section_number":"56-242","catch_line":"Temporary reduction of rates","url":"\/56-242\/","token":"56\/10\/2\/56-242","metadata":false},{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},{"id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","url":"\/56-244\/","token":"56\/10\/2\/56-244","metadata":false},{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},{"id":75868,"structure_id":14465,"section_number":"56-245.1","catch_line":"Meters to be kept in good working condition; defective meters","url":"\/56-245.1\/","token":"56\/10\/2\/56-245.1","metadata":false},{"id":80955,"structure_id":14465,"section_number":"56-245.1:1","catch_line":"Customers to be notified about nuclear emergency evacuation plans","url":"\/56-245.1_1\/","token":"56\/10\/2\/56-245.1_1","metadata":false},{"id":61620,"structure_id":14465,"section_number":"56-245.1:2","catch_line":"Customers to be notified of renewable power options","url":"\/56-245.1_2\/","token":"56\/10\/2\/56-245.1_2","metadata":false},{"id":70183,"structure_id":14465,"section_number":"56-245.1:3","catch_line":"Disconnection suspension for utilities","url":"\/56-245.1_3\/","token":"56\/10\/2\/56-245.1_3","metadata":false},{"id":86241,"structure_id":14465,"section_number":"56-245.1:4","catch_line":"Notice procedures for nonpayment; disconnecting utility service","url":"\/56-245.1_4\/","token":"56\/10\/2\/56-245.1_4","metadata":false}],"previous_section":{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},"next_section":{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-237.1\/","history_text":"<p>This law was first created in 1976. The record of its establishment is cataloged in chapter 763 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1976 \u201cActs\u201d aren\u2019t available online. It has been modified 2 times. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. Those modifications are as follows: in 2011, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?111+ful+CHAP0738\">738<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?111+ful+CHAP0740\">740<\/a>; in 2016, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?161+ful+CHAP0191\">191<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?161+ful+CHAP0283\">283<\/a>.<\/p>","references":[{"id":57569,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","order_by":null,"url":"\/56-237\/"}],"refers_to":false,"permalink":{"id":248861,"object_type":"law","relational_id":64233,"identifier":"56-237.1","token":"56\/10\/2\/56-237.1","url":"\/56-237.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","dublin_core":{"Title":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-237.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Every public utility, other than a public utility providing water or sewer service, that indicates upon existing required <span class=\"dictionary\">schedules<\/span>, or upon new <span class=\"dictionary\">schedules<\/span> required to be filed in lieu thereof, changes in <span class=\"dictionary\">rates<\/span>, tolls, charges, rules and regulations, shall cause to have published, once a week for four successive weeks, in one or more newspapers in circulation in its franchise area and approved by the <span class=\"dictionary\">Commission<\/span>, a notice of its intention to change its <span class=\"dictionary\">rates<\/span>, tolls, charges, rules and regulations. Every public utility providing water or sewer service that indicates upon existing required <span class=\"dictionary\">schedules<\/span>, or upon new <span class=\"dictionary\">schedules<\/span> required to be filed in lieu thereof, changes in <span class=\"dictionary\">rates<\/span>, tolls, charges, rules and regulations, shall cause to have published at least once in one or more newspapers in circulation in its franchise area and approved by the <span class=\"dictionary\">Commission<\/span>, a notice of its intention to change its <span class=\"dictionary\">rates<\/span>, tolls, charges, rules and regulations. The last such publication shall appear no less than 30 days prior to the time any changed <span class=\"dictionary\">rates<\/span>, tolls, charges, rules and regulations shall take effect. This notice shall be in such form and contain such information as prescribed by the <span class=\"dictionary\">Commission<\/span>. <a id=\"paragraph-233840\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-237.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Every public utility that indicates upon existing required <span class=\"dictionary\">schedules<\/span>, or upon new <span class=\"dictionary\">schedules<\/span> required to be filed in lieu thereof, changes in <span class=\"dictionary\">rates<\/span>, tolls, charges, rules, and regulations shall <span class=\"dictionary\">mail<\/span> to each of its customers who receive periodic statements of charges by <span class=\"dictionary\">mail<\/span> or send electronically to each of its customers who receive periodic statements of charges electronically, along with its periodic invoice, bill, or other statement advising the customer of its charges, a notice of its intention to change its <span class=\"dictionary\">rates<\/span>, tolls, charges, rules, and regulations. This notice shall be mailed or sent electronically no less than 30 days prior to the time any such changed <span class=\"dictionary\">rate<\/span>, toll, charge, rule, and regulation shall take effect. This notice shall be in such form and contain such information as prescribed by the <span class=\"dictionary\">Commission<\/span>. <a id=\"paragraph-233841\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-237.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> Except for public utilities providing water or sewer service, the <span class=\"dictionary\">Commission<\/span> may dispense with either or both of the requirements contained in subsections A and B if either or both such requirements are not necessary to provide adequate notice to all of the public utilities&#8217; customers. The <span class=\"dictionary\">Commission<\/span> may prescribe additional requirements for notification to a public utility&#8217;s customers of its intention to change its <span class=\"dictionary\">rates<\/span>, tolls, charges, rules, and regulations. <a id=\"paragraph-233842\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-237.1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nNOTIFICATION OF INTENT TO SEEK RATE CHANGE IN SCHEDULES REQUIRED TO BE FILED\nUNDER \u00a7 56-236 (\u00a7 56-237.1)\n\nA. Every public utility, other than a public utility providing water or sewer\nservice, that indicates upon existing required schedules, or upon new schedules\nrequired to be filed in lieu thereof, changes in rates, tolls, charges, rules\nand regulations, shall cause to have published, once a week for four successive\nweeks, in one or more newspapers in circulation in its franchise area and\napproved by the Commission, a notice of its intention to change its rates,\ntolls, charges, rules and regulations. Every public utility providing water or\nsewer service that indicates upon existing required schedules, or upon new\nschedules required to be filed in lieu thereof, changes in rates, tolls,\ncharges, rules and regulations, shall cause to have published at least once in\none or more newspapers in circulation in its franchise area and approved by the\nCommission, a notice of its intention to change its rates, tolls, charges, rules\nand regulations. The last such publication shall appear no less than 30 days\nprior to the time any changed rates, tolls, charges, rules and regulations shall\ntake effect. This notice shall be in such form and contain such information as\nprescribed by the Commission.\n\nB. Every public utility that indicates upon existing required schedules, or upon\nnew schedules required to be filed in lieu thereof, changes in rates, tolls,\ncharges, rules, and regulations shall mail to each of its customers who receive\nperiodic statements of charges by mail or send electronically to each of its\ncustomers who receive periodic statements of charges electronically, along with\nits periodic invoice, bill, or other statement advising the customer of its\ncharges, a notice of its intention to change its rates, tolls, charges, rules,\nand regulations. This notice shall be mailed or sent electronically no less than\n30 days prior to the time any such changed rate, toll, charge, rule, and\nregulation shall take effect. This notice shall be in such form and contain such\ninformation as prescribed by the Commission.\n\nC. Except for public utilities providing water or sewer service, the Commission\nmay dispense with either or both of the requirements contained in subsections A\nand B if either or both such requirements are not necessary to provide adequate\nnotice to all of the public utilities&#8217; customers. The Commission may\nprescribe additional requirements for notification to a public utility&#8217;s\ncustomers of its intention to change its rates, tolls, charges, rules, and\nregulations.\n\nHISTORY: 1976, c. 763; 2011, cc. 738, 740; 2016, cc. 191, 283.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}