{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-244.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-244.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-244.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-244.html"}],"law_id":84025,"edition_id":1,"section_id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","history":"1934, p. 366; Michie Code 1942, \u00a7 4071a.","full_text":"If upon a final disposition of the issues involved in a proceeding mentioned in \u00a7 56-242, the rates or charges as finally determined by the Commission, or the court having jurisdiction of the subject matter, are in excess of the rates and charges prescribed in any temporary order issued in such proceeding, then such public utility shall be permitted, over such reasonable time as the Commission shall fix, to amortize and recover, by means of a temporary increase over and above the rates and charges finally determined, such sum as shall represent the difference between the gross income obtained from the rates and charges prescribed in such temporary reduction order, and the gross income which would have obtained, during the period such temporary reduction order was in effect, based upon the same volume, from the rates and charges finally determined.","order_by":null,"text":{"0":{"id":301142,"text":"If upon a final disposition of the issues involved in a proceeding mentioned in \u00a7 56-242, the rates or charges as finally determined by the Commission, or the court having jurisdiction of the subject matter, are in excess of the rates and charges prescribed in any temporary order issued in such proceeding, then such public utility shall be permitted, over such reasonable time as the Commission shall fix, to amortize and recover, by means of a temporary increase over and above the rates and charges finally determined, such sum as shall represent the difference between the gross income obtained from the rates and charges prescribed in such temporary reduction order, and the gross income which would have obtained, during the period such temporary reduction order was in effect, based upon the same volume, from the rates and charges finally determined.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":14465,"edition_id":1,"name":"Services, Rates, Charges, Etc","identifier":"2","label":"article","depth":3,"order_by":1,"parent_id":13238,"metadata":{},"date_created":"2026-06-26 03:48:13","date_modified":"2026-06-26 03:48:13","permalink":{"id":248755,"object_type":"structure","relational_id":14465,"identifier":"2","token":"56\/10\/2","url":"\/56\/10\/2\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13238,"edition_id":1,"name":"Heat, Light, Power, Water and Other Utility Companies Generally","identifier":"10","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:30","date_modified":"2026-06-26 03:44:30","permalink":{"id":248721,"object_type":"structure","relational_id":13238,"identifier":"10","token":"56\/10","url":"\/56\/10\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":87361,"structure_id":14465,"section_number":"56-234","catch_line":"Duty to furnish adequate service at reasonable and uniform rates","url":"\/56-234\/","token":"56\/10\/2\/56-234","metadata":false},{"id":74382,"structure_id":14465,"section_number":"56-234.1","catch_line":"Liability to customer for violation of duty to determine and charge lowest rate applicable","url":"\/56-234.1\/","token":"56\/10\/2\/56-234.1","metadata":false},{"id":56457,"structure_id":14465,"section_number":"56-234.2","catch_line":"Review of rates","url":"\/56-234.2\/","token":"56\/10\/2\/56-234.2","metadata":false},{"id":78493,"structure_id":14465,"section_number":"56-234.3","catch_line":"Approval of expenditures for and monitoring of new generation facilities and projected operation programs of electric utilities","url":"\/56-234.3\/","token":"56\/10\/2\/56-234.3","metadata":false},{"id":72152,"structure_id":14465,"section_number":"56-234.4","catch_line":"Authority to investigate utility operations to determine efficiency","url":"\/56-234.4\/","token":"56\/10\/2\/56-234.4","metadata":false},{"id":84236,"structure_id":14465,"section_number":"56-234.5","catch_line":"Required disclosure by certain officers and directors of certain utilities","url":"\/56-234.5\/","token":"56\/10\/2\/56-234.5","metadata":false},{"id":77453,"structure_id":14465,"section_number":"56-235","catch_line":"When Commission may fix rates, schedules, etc.; conformance with chapter","url":"\/56-235\/","token":"56\/10\/2\/56-235","metadata":false},{"id":85095,"structure_id":14465,"section_number":"56-235.1","catch_line":"Conservation of energy and capital resources","url":"\/56-235.1\/","token":"56\/10\/2\/56-235.1","metadata":false},{"id":57116,"structure_id":14465,"section_number":"56-235.10","catch_line":"Recovery of eligible safety activity costs; administration; procedure","url":"\/56-235.10\/","token":"56\/10\/2\/56-235.10","metadata":false},{"id":68057,"structure_id":14465,"section_number":"56-235.11","catch_line":"Retail rates of affiliated water utilities","url":"\/56-235.11\/","token":"56\/10\/2\/56-235.11","metadata":false},{"id":69890,"structure_id":14465,"section_number":"56-235.12","catch_line":"Economic development programs","url":"\/56-235.12\/","token":"56\/10\/2\/56-235.12","metadata":false},{"id":80899,"structure_id":14465,"section_number":"56-235.1:1","catch_line":"Rates for stand-by electric service at renewable cogeneration facilities","url":"\/56-235.1_1\/","token":"56\/10\/2\/56-235.1_1","metadata":false},{"id":80993,"structure_id":14465,"section_number":"56-235.1:2","catch_line":"Costs of using small, women-owned, or minority-owned businesses","url":"\/56-235.1_2\/","token":"56\/10\/2\/56-235.1_2","metadata":false},{"id":62621,"structure_id":14465,"section_number":"56-235.2","catch_line":"All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies","url":"\/56-235.2\/","token":"56\/10\/2\/56-235.2","metadata":false},{"id":66652,"structure_id":14465,"section_number":"56-235.3","catch_line":"Procedures for investigation of rate applications","url":"\/56-235.3\/","token":"56\/10\/2\/56-235.3","metadata":false},{"id":63163,"structure_id":14465,"section_number":"56-235.4","catch_line":"Prohibition of multiple rate increases within any twelve-month period; exception","url":"\/56-235.4\/","token":"56\/10\/2\/56-235.4","metadata":false},{"id":55844,"structure_id":14465,"section_number":"56-235.5","catch_line":"Telephone regulatory alternatives","url":"\/56-235.5\/","token":"56\/10\/2\/56-235.5","metadata":false},{"id":87078,"structure_id":14465,"section_number":"56-235.5:1","catch_line":"Local exchange telephone service competition policy","url":"\/56-235.5_1\/","token":"56\/10\/2\/56-235.5_1","metadata":false},{"id":71641,"structure_id":14465,"section_number":"56-235.6","catch_line":"Optional performance-based regulation of certain utilities","url":"\/56-235.6\/","token":"56\/10\/2\/56-235.6","metadata":false},{"id":77670,"structure_id":14465,"section_number":"56-235.7","catch_line":"Jurisdiction of Commission when federal governmental facility ceases to be retail customer of electric utility","url":"\/56-235.7\/","token":"56\/10\/2\/56-235.7","metadata":false},{"id":78685,"structure_id":14465,"section_number":"56-235.8","catch_line":"Retail supply choice for natural gas customers","url":"\/56-235.8\/","token":"56\/10\/2\/56-235.8","metadata":false},{"id":62516,"structure_id":14465,"section_number":"56-235.9","catch_line":"Recovery of funds used for capital projects prior to a rate case for strategic natural gas facilities","url":"\/56-235.9\/","token":"56\/10\/2\/56-235.9","metadata":false},{"id":59697,"structure_id":14465,"section_number":"56-236","catch_line":"Public utilities required to file schedules of rates and charges; rules and regulations; when detariffing of telephone services to be permitted","url":"\/56-236\/","token":"56\/10\/2\/56-236","metadata":false},{"id":85571,"structure_id":14465,"section_number":"56-236.1","catch_line":"Rates to be charged churches","url":"\/56-236.1\/","token":"56\/10\/2\/56-236.1","metadata":false},{"id":74562,"structure_id":14465,"section_number":"56-236.2","catch_line":"Suspension of service to sewerage system","url":"\/56-236.2\/","token":"56\/10\/2\/56-236.2","metadata":false},{"id":57569,"structure_id":14465,"section_number":"56-237","catch_line":"How changes in rates effected; notice required; changes to be indicated on schedules","url":"\/56-237\/","token":"56\/10\/2\/56-237","metadata":false},{"id":64233,"structure_id":14465,"section_number":"56-237.1","catch_line":"Notification of intent to seek rate change in schedules required to be filed under \u00a7 56-236","url":"\/56-237.1\/","token":"56\/10\/2\/56-237.1","metadata":false},{"id":67487,"structure_id":14465,"section_number":"56-237.2","catch_line":"Public hearings on protests or objections to rate changes","url":"\/56-237.2\/","token":"56\/10\/2\/56-237.2","metadata":false},{"id":80068,"structure_id":14465,"section_number":"56-238","catch_line":"Suspension of proposed rates, etc.; investigation; effectiveness of rates pending investigation and subject to bond; fixing reasonable rates, etc","url":"\/56-238\/","token":"56\/10\/2\/56-238","metadata":false},{"id":78378,"structure_id":14465,"section_number":"56-239","catch_line":"Appeal from action of Commission","url":"\/56-239\/","token":"56\/10\/2\/56-239","metadata":false},{"id":64527,"structure_id":14465,"section_number":"56-240","catch_line":"Proposed rates, etc., or changes thereof, not suspended effective subject to later change by Commission; refund or credit; appeal; investor-owned public utilities required to show increase complies with \u00a7 56-235.2","url":"\/56-240\/","token":"56\/10\/2\/56-240","metadata":false},{"id":57241,"structure_id":14465,"section_number":"56-241","catch_line":"Rates of telephone companies","url":"\/56-241\/","token":"56\/10\/2\/56-241","metadata":false},{"id":83712,"structure_id":14465,"section_number":"56-241.1","catch_line":"Flat and measured telephone rates; certain rates prohibited","url":"\/56-241.1\/","token":"56\/10\/2\/56-241.1","metadata":false},{"id":74999,"structure_id":14465,"section_number":"56-241.2","catch_line":"Approval of rates for resale of telephone service","url":"\/56-241.2\/","token":"56\/10\/2\/56-241.2","metadata":false},{"id":72101,"structure_id":14465,"section_number":"56-242","catch_line":"Temporary reduction of rates","url":"\/56-242\/","token":"56\/10\/2\/56-242","metadata":false},{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},{"id":84025,"structure_id":14465,"section_number":"56-244","catch_line":"Increase to make up for losses due to excessive temporary reduction","url":"\/56-244\/","token":"56\/10\/2\/56-244","metadata":false},{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},{"id":75868,"structure_id":14465,"section_number":"56-245.1","catch_line":"Meters to be kept in good working condition; defective meters","url":"\/56-245.1\/","token":"56\/10\/2\/56-245.1","metadata":false},{"id":80955,"structure_id":14465,"section_number":"56-245.1:1","catch_line":"Customers to be notified about nuclear emergency evacuation plans","url":"\/56-245.1_1\/","token":"56\/10\/2\/56-245.1_1","metadata":false},{"id":61620,"structure_id":14465,"section_number":"56-245.1:2","catch_line":"Customers to be notified of renewable power options","url":"\/56-245.1_2\/","token":"56\/10\/2\/56-245.1_2","metadata":false},{"id":70183,"structure_id":14465,"section_number":"56-245.1:3","catch_line":"Disconnection suspension for utilities","url":"\/56-245.1_3\/","token":"56\/10\/2\/56-245.1_3","metadata":false},{"id":86241,"structure_id":14465,"section_number":"56-245.1:4","catch_line":"Notice procedures for nonpayment; disconnecting utility service","url":"\/56-245.1_4\/","token":"56\/10\/2\/56-245.1_4","metadata":false}],"previous_section":{"id":79154,"structure_id":14465,"section_number":"56-243","catch_line":"Duration of such temporary reduction","url":"\/56-243\/","token":"56\/10\/2\/56-243","metadata":false},"next_section":{"id":67793,"structure_id":14465,"section_number":"56-245","catch_line":"Temporary increase in rates","url":"\/56-245\/","token":"56\/10\/2\/56-245","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-244\/","history_text":false,"references":false,"refers_to":[{"id":72101,"section_number":"56-242","catch_line":"Temporary reduction of rates","order_by":null,"url":"\/56-242\/"}],"permalink":{"id":248901,"object_type":"law","relational_id":84025,"identifier":"56-244","token":"56\/10\/2\/56-244","url":"\/56-244\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-244\/","token":"56\/10\/2\/56-244","dublin_core":{"Title":"Increase to make up for losses due to excessive temporary reduction","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-244","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>If upon a final <span class=\"dictionary\">disposition<\/span> of the <span class=\"dictionary\">issues<\/span> involved in a proceeding mentioned in \u00a7&nbsp;<a class=\"law\" title=\"Temporary reduction of rates\" href=\"\/56-242\/\">56-242<\/a>, the <span class=\"dictionary\">rates<\/span> or charges as finally determined by the <span class=\"dictionary\">Commission<\/span>, or the <span class=\"dictionary\">court<\/span> having <span class=\"dictionary\">jurisdiction<\/span> of the subject matter, are in excess of the <span class=\"dictionary\">rates<\/span> and charges prescribed in any temporary <span class=\"dictionary\">order<\/span> issued in such proceeding, then such public utility shall be permitted, over such reasonable time as the <span class=\"dictionary\">Commission<\/span> shall fix, to amortize and recover, by means of a temporary increase over and above the <span class=\"dictionary\">rates<\/span> and charges finally determined, such sum as shall represent the difference between the gross income obtained from the <span class=\"dictionary\">rates<\/span> and charges prescribed in such temporary reduction <span class=\"dictionary\">order<\/span>, and the gross income which would have obtained, during the period such temporary reduction <span class=\"dictionary\">order<\/span> was in effect, based upon the same volume, from the <span class=\"dictionary\">rates<\/span> and charges finally determined.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nINCREASE TO MAKE UP FOR LOSSES DUE TO EXCESSIVE TEMPORARY REDUCTION (\u00a7 56-244)\n\nIf upon a final disposition of the issues involved in a proceeding mentioned in\n\u00a7 56-242, the rates or charges as finally determined by the Commission, or the\ncourt having jurisdiction of the subject matter, are in excess of the rates and\ncharges prescribed in any temporary order issued in such proceeding, then such\npublic utility shall be permitted, over such reasonable time as the Commission\nshall fix, to amortize and recover, by means of a temporary increase over and\nabove the rates and charges finally determined, such sum as shall represent the\ndifference between the gross income obtained from the rates and charges\nprescribed in such temporary reduction order, and the gross income which would\nhave obtained, during the period such temporary reduction order was in effect,\nbased upon the same volume, from the rates and charges finally determined.\n\nHISTORY: 1934, p. 366; Michie Code 1942, \u00a7 4071a.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}