{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-265.17_1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-265.17_1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-265.17_1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-265.17_1.html"}],"law_id":83153,"edition_id":1,"section_id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","history":"2002, c. 841.","full_text":"A\n\nEach designer, who prepares drawings and plans for projects requiring excavation or demolition work, may notify the notification center and provide the center with the information required by &#xA7; 56-265.18 and the designer&#8217;s professional license number.B\n\nIf a designer notifies the notification center to receive underground utility line information in accordance with \u00a7 56-265.17:3, the designer shall:1\n\nIndicate on the construction drawings, the type of underground utility lines, the horizontal location of these lines as provided by the operators, and the names of the operators of these lines;2\n\nConsider, when designing a project and preparing drawings therefor, the location of existing underground lines so as to minimize damage or interference with the existing facilities;3\n\nIndicate, on the construction plans or drawings, the designer ticket number and the notification center&#8217;s toll-free number; and4\n\nRequest only one designer ticket per project through the notification center at no cost.","order_by":null,"text":{"0":{"id":297967,"text":"Each designer, who prepares drawings and plans for projects requiring excavation or demolition work, may notify the notification center and provide the center with the information required by &#xA7; 56-265.18 and the designer&#8217;s professional license number.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":297968,"text":"If a designer notifies the notification center to receive underground utility line information in accordance with \u00a7 56-265.17:3, the designer shall:","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"B1"},"2":{"id":297969,"text":"Indicate on the construction drawings, the type of underground utility lines, the horizontal location of these lines as provided by the operators, and the names of the operators of these lines;","type":"section","prefixes":["B","1"],"prefix":"1","entire_prefix":"B1","prefix_anchor":"B1","level":2,"prior_prefix":"B","next_prefix":"B2"},"3":{"id":297970,"text":"Consider, when designing a project and preparing drawings therefor, the location of existing underground lines so as to minimize damage or interference with the existing facilities;","type":"section","prefixes":["B","2"],"prefix":"2","entire_prefix":"B2","prefix_anchor":"B2","level":2,"prior_prefix":"B1","next_prefix":"B3"},"4":{"id":297971,"text":"Indicate, on the construction plans or drawings, the designer ticket number and the notification center&#8217;s toll-free number; and","type":"section","prefixes":["B","3"],"prefix":"3","entire_prefix":"B3","prefix_anchor":"B3","level":2,"prior_prefix":"B2","next_prefix":"B4"},"5":{"id":297972,"text":"Request only one designer ticket per project through the notification center at no cost.","type":"section","prefixes":["B","4"],"prefix":"4","entire_prefix":"B4","prefix_anchor":"B4","level":2,"prior_prefix":"B3"}},"ancestry":[{"id":12882,"edition_id":1,"name":"Underground Utility Damage Prevention Act","identifier":"10.3","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":249261,"object_type":"structure","relational_id":12882,"identifier":"10.3","token":"56\/10.3","url":"\/56\/10.3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":67078,"structure_id":12882,"section_number":"56-265.14","catch_line":"Short title","url":"\/56-265.14\/","token":"56\/10.3\/56-265.14","metadata":false},{"id":58284,"structure_id":12882,"section_number":"56-265.15","catch_line":"Definitions; calculation of time periods","url":"\/56-265.15\/","token":"56\/10.3\/56-265.15","metadata":false},{"id":77182,"structure_id":12882,"section_number":"56-265.15:1","catch_line":" Exemptions; routine maintenance","url":"\/56-265.15_1\/","token":"56\/10.3\/56-265.15_1","metadata":false},{"id":84032,"structure_id":12882,"section_number":"56-265.16","catch_line":"Repealed","url":"\/56-265.16\/","token":"56\/10.3\/56-265.16","metadata":false},{"id":56272,"structure_id":12882,"section_number":"56-265.16:1","catch_line":"Operators to join notification centers; certification","url":"\/56-265.16_1\/","token":"56\/10.3\/56-265.16_1","metadata":false},{"id":71572,"structure_id":12882,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},{"id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},{"id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},{"id":81609,"structure_id":12882,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},{"id":87274,"structure_id":12882,"section_number":"56-265.18","catch_line":"Notification requirements","url":"\/56-265.18\/","token":"56\/10.3\/56-265.18","metadata":false},{"id":56575,"structure_id":12882,"section_number":"56-265.19","catch_line":"Duties of operator; regulations","url":"\/56-265.19\/","token":"56\/10.3\/56-265.19","metadata":false},{"id":76344,"structure_id":12882,"section_number":"56-265.19:1","catch_line":"Private sewer laterals and sewer system laterals","url":"\/56-265.19_1\/","token":"56\/10.3\/56-265.19_1","metadata":false},{"id":61252,"structure_id":12882,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},{"id":80434,"structure_id":12882,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","metadata":false},{"id":77696,"structure_id":12882,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},{"id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},{"id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},{"id":87171,"structure_id":12882,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},{"id":68853,"structure_id":12882,"section_number":"56-265.24","catch_line":"Duties of excavator","url":"\/56-265.24\/","token":"56\/10.3\/56-265.24","metadata":false},{"id":84234,"structure_id":12882,"section_number":"56-265.24:1","catch_line":"Request to cease operation; immediate threat; penalty","url":"\/56-265.24_1\/","token":"56\/10.3\/56-265.24_1","metadata":false},{"id":57821,"structure_id":12882,"section_number":"56-265.25","catch_line":"Liability of operator and excavator; penalties","url":"\/56-265.25\/","token":"56\/10.3\/56-265.25","metadata":false},{"id":54008,"structure_id":12882,"section_number":"56-265.26","catch_line":"Repealed","url":"\/56-265.26\/","token":"56\/10.3\/56-265.26","metadata":false},{"id":84847,"structure_id":12882,"section_number":"56-265.26:1","catch_line":"Utility line depth requirement","url":"\/56-265.26_1\/","token":"56\/10.3\/56-265.26_1","metadata":false},{"id":77994,"structure_id":12882,"section_number":"56-265.27","catch_line":"Repealed","url":"\/56-265.27\/","token":"56\/10.3\/56-265.27","metadata":false},{"id":86798,"structure_id":12882,"section_number":"56-265.28","catch_line":"Sovereign immunity","url":"\/56-265.28\/","token":"56\/10.3\/56-265.28","metadata":false},{"id":79358,"structure_id":12882,"section_number":"56-265.29","catch_line":"Other similar laws","url":"\/56-265.29\/","token":"56\/10.3\/56-265.29","metadata":false},{"id":56066,"structure_id":12882,"section_number":"56-265.30","catch_line":"Authority of the State Corporation Commission","url":"\/56-265.30\/","token":"56\/10.3\/56-265.30","metadata":false},{"id":54014,"structure_id":12882,"section_number":"56-265.31","catch_line":"Commission to establish advisory committee","url":"\/56-265.31\/","token":"56\/10.3\/56-265.31","metadata":false},{"id":73298,"structure_id":12882,"section_number":"56-265.32","catch_line":"Commission to impose civil penalties for certain violations; establishment of Underground Utility Damage Prevention Special Fund","url":"\/56-265.32\/","token":"56\/10.3\/56-265.32","metadata":false}],"previous_section":{"id":71572,"structure_id":12882,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},"next_section":{"id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-265.17:1\/","history_text":"<p>This law was first created in 2002. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0841\">841<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":81609,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","order_by":null,"url":"\/56-265.17_3\/"}],"refers_to":[{"id":81609,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","order_by":null,"url":"\/56-265.17_3\/"},{"id":87274,"section_number":"56-265.18","catch_line":"Notification requirements","order_by":null,"url":"\/56-265.18\/"}],"permalink":{"id":249287,"object_type":"law","relational_id":83153,"identifier":"56-265.17:1","token":"56\/10.3\/56-265.17_1","url":"\/56-265.17_1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","dublin_core":{"Title":"Notification and procedures for designers","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-265.17:1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Each designer, who prepares drawings and plans for projects requiring excavation or demolition work, may notify the notification center and provide the center with the information required by &#xA7; <a class=\"law\" title=\"Notification requirements\" href=\"\/56-265.18\/\">56-265.18<\/a> and the designer&#8217;s professional license number. <a id=\"paragraph-297967\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> If a designer notifies the notification center to receive underground utility line information in accordance with \u00a7&nbsp;<a class=\"law\" title=\"Procedures for operators in response to a designer notice\" href=\"\/56-265.17_3\/\">56-265.17:3<\/a>, the designer shall: <a id=\"paragraph-297968\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> Indicate on the construction drawings, the type of underground utility lines, the horizontal location of these lines as provided by the operators, and the names of the operators of these lines; <a id=\"paragraph-297969\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#B1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> Consider, when designing a project and preparing drawings therefor, the location of existing underground lines so as to minimize damage or interference with the existing facilities; <a id=\"paragraph-297970\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#B2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> Indicate, on the construction plans or drawings, the designer ticket number and the notification center&#8217;s toll-free number; and <a id=\"paragraph-297971\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#B3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B4\" class=\"indent-1\"><p><span class=\"prefix-number\">4.<\/span> Request only one designer ticket per project through the notification center at no cost. <a id=\"paragraph-297972\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.17_1\/#B4\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nNOTIFICATION AND PROCEDURES FOR DESIGNERS (\u00a7 56-265.17:1)\n\nA. Each designer, who prepares drawings and plans for projects requiring\nexcavation or demolition work, may notify the notification center and provide\nthe center with the information required by &#xA7; 56-265.18 and the\ndesigner&#8217;s professional license number.\n\nB. If a designer notifies the notification center to receive underground utility\nline information in accordance with \u00a7 56-265.17:3, the designer shall:\n\n   1. Indicate on the construction drawings, the type of underground utility\n   lines, the horizontal location of these lines as provided by the operators,\n   and the names of the operators of these lines;\n\n   2. Consider, when designing a project and preparing drawings therefor, the\n   location of existing underground lines so as to minimize damage or\n   interference with the existing facilities;\n\n   3. Indicate, on the construction plans or drawings, the designer ticket number\n   and the notification center&#8217;s toll-free number; and\n\n   4. Request only one designer ticket per project through the notification\n   center at no cost.\n\nHISTORY: 2002, c. 841.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}