{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-265.17_2.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-265.17_2.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-265.17_2.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-265.17_2.html"}],"law_id":61626,"edition_id":1,"section_id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","history":"2002, c. 841.","full_text":"The project owner shall provide copies of those portions of the drawings that affect the respective operator with underground utility lines in the project area who have responded in accordance with \u00a7 56-265.17:3.","order_by":null,"text":{"0":{"id":224988,"text":"The project owner shall provide copies of those portions of the drawings that affect the respective operator with underground utility lines in the project area who have responded in accordance with \u00a7 56-265.17:3.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":12882,"edition_id":1,"name":"Underground Utility Damage Prevention Act","identifier":"10.3","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":249261,"object_type":"structure","relational_id":12882,"identifier":"10.3","token":"56\/10.3","url":"\/56\/10.3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":67078,"structure_id":12882,"section_number":"56-265.14","catch_line":"Short title","url":"\/56-265.14\/","token":"56\/10.3\/56-265.14","metadata":false},{"id":58284,"structure_id":12882,"section_number":"56-265.15","catch_line":"Definitions; calculation of time periods","url":"\/56-265.15\/","token":"56\/10.3\/56-265.15","metadata":false},{"id":77182,"structure_id":12882,"section_number":"56-265.15:1","catch_line":" Exemptions; routine maintenance","url":"\/56-265.15_1\/","token":"56\/10.3\/56-265.15_1","metadata":false},{"id":84032,"structure_id":12882,"section_number":"56-265.16","catch_line":"Repealed","url":"\/56-265.16\/","token":"56\/10.3\/56-265.16","metadata":false},{"id":56272,"structure_id":12882,"section_number":"56-265.16:1","catch_line":"Operators to join notification centers; certification","url":"\/56-265.16_1\/","token":"56\/10.3\/56-265.16_1","metadata":false},{"id":71572,"structure_id":12882,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},{"id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},{"id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},{"id":81609,"structure_id":12882,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},{"id":87274,"structure_id":12882,"section_number":"56-265.18","catch_line":"Notification requirements","url":"\/56-265.18\/","token":"56\/10.3\/56-265.18","metadata":false},{"id":56575,"structure_id":12882,"section_number":"56-265.19","catch_line":"Duties of operator; regulations","url":"\/56-265.19\/","token":"56\/10.3\/56-265.19","metadata":false},{"id":76344,"structure_id":12882,"section_number":"56-265.19:1","catch_line":"Private sewer laterals and sewer system laterals","url":"\/56-265.19_1\/","token":"56\/10.3\/56-265.19_1","metadata":false},{"id":61252,"structure_id":12882,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},{"id":80434,"structure_id":12882,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","metadata":false},{"id":77696,"structure_id":12882,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},{"id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},{"id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},{"id":87171,"structure_id":12882,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},{"id":68853,"structure_id":12882,"section_number":"56-265.24","catch_line":"Duties of excavator","url":"\/56-265.24\/","token":"56\/10.3\/56-265.24","metadata":false},{"id":84234,"structure_id":12882,"section_number":"56-265.24:1","catch_line":"Request to cease operation; immediate threat; penalty","url":"\/56-265.24_1\/","token":"56\/10.3\/56-265.24_1","metadata":false},{"id":57821,"structure_id":12882,"section_number":"56-265.25","catch_line":"Liability of operator and excavator; penalties","url":"\/56-265.25\/","token":"56\/10.3\/56-265.25","metadata":false},{"id":54008,"structure_id":12882,"section_number":"56-265.26","catch_line":"Repealed","url":"\/56-265.26\/","token":"56\/10.3\/56-265.26","metadata":false},{"id":84847,"structure_id":12882,"section_number":"56-265.26:1","catch_line":"Utility line depth requirement","url":"\/56-265.26_1\/","token":"56\/10.3\/56-265.26_1","metadata":false},{"id":77994,"structure_id":12882,"section_number":"56-265.27","catch_line":"Repealed","url":"\/56-265.27\/","token":"56\/10.3\/56-265.27","metadata":false},{"id":86798,"structure_id":12882,"section_number":"56-265.28","catch_line":"Sovereign immunity","url":"\/56-265.28\/","token":"56\/10.3\/56-265.28","metadata":false},{"id":79358,"structure_id":12882,"section_number":"56-265.29","catch_line":"Other similar laws","url":"\/56-265.29\/","token":"56\/10.3\/56-265.29","metadata":false},{"id":56066,"structure_id":12882,"section_number":"56-265.30","catch_line":"Authority of the State Corporation Commission","url":"\/56-265.30\/","token":"56\/10.3\/56-265.30","metadata":false},{"id":54014,"structure_id":12882,"section_number":"56-265.31","catch_line":"Commission to establish advisory committee","url":"\/56-265.31\/","token":"56\/10.3\/56-265.31","metadata":false},{"id":73298,"structure_id":12882,"section_number":"56-265.32","catch_line":"Commission to impose civil penalties for certain violations; establishment of Underground Utility Damage Prevention Special Fund","url":"\/56-265.32\/","token":"56\/10.3\/56-265.32","metadata":false}],"previous_section":{"id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},"next_section":{"id":81609,"structure_id":12882,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-265.17:2\/","history_text":"<p>This law was first created in 2002. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0841\">841<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":81609,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","order_by":null,"url":"\/56-265.17_3\/"}],"permalink":{"id":249291,"object_type":"law","relational_id":61626,"identifier":"56-265.17:2","token":"56\/10.3\/56-265.17_2","url":"\/56-265.17_2\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","dublin_core":{"Title":"Procedures for project owners","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-265.17:2","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The project owner shall provide copies of those portions of the drawings that affect the respective operator with underground utility lines in the project area who have responded in accordance with \u00a7&nbsp;<a class=\"law\" title=\"Procedures for operators in response to a designer notice\" href=\"\/56-265.17_3\/\">56-265.17:3<\/a>.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nPROCEDURES FOR PROJECT OWNERS (\u00a7 56-265.17:2)\n\nThe project owner shall provide copies of those portions of the drawings that\naffect the respective operator with underground utility lines in the project\narea who have responded in accordance with \u00a7 56-265.17:3.\n\nHISTORY: 2002, c. 841.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}