{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-265.22.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-265.22.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-265.22.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-265.22.html"}],"law_id":64117,"edition_id":1,"section_id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","history":"1979, c. 291; 1994, c. 890; 2002, c. 841; 2023, cc. 299, 300.","full_text":"A\n\nThe notification center shall, upon receiving notice by a person, notify all member operators whose utility lines are present in the area of the proposed project, excavation, or demolition. The notification center shall also indicate the names of those operators being notified to the person providing notice.B\n\nIf the notification required by this chapter is made by telephone, a record of such notification shall be maintained by the operators or notification center notified to document compliance with the requirements of this chapter, and such records shall be maintained in compliance with the applicable statute of limitations.C\n\nThe notification center shall notify excavators, within the time frame allowed by the law to mark underground utility lines, of any responses placed on the positive response system by a locator. Such notification shall occur by mutually acceptable means of automatically transmitting and receiving this information.\n\t\t\tIf the excavator cannot provide the notification center with mutually acceptable means of automatically transmitting and receiving this information, it shall be the excavator&#8217;s responsibility to contact the positive response system after the period allowed by law to mark underground facilities and prior to commencing excavation in order to determine if any responses to the notice have been recorded.","order_by":null,"text":{"0":{"id":233439,"text":"The notification center shall, upon receiving notice by a person, notify all member operators whose utility lines are present in the area of the proposed project, excavation, or demolition. The notification center shall also indicate the names of those operators being notified to the person providing notice.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":233440,"text":"If the notification required by this chapter is made by telephone, a record of such notification shall be maintained by the operators or notification center notified to document compliance with the requirements of this chapter, and such records shall be maintained in compliance with the applicable statute of limitations.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":233441,"text":"The notification center shall notify excavators, within the time frame allowed by the law to mark underground utility lines, of any responses placed on the positive response system by a locator. Such notification shall occur by mutually acceptable means of automatically transmitting and receiving this information.\n\t\t\tIf the excavator cannot provide the notification center with mutually acceptable means of automatically transmitting and receiving this information, it shall be the excavator&#8217;s responsibility to contact the positive response system after the period allowed by law to mark underground facilities and prior to commencing excavation in order to determine if any responses to the notice have been recorded.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":12882,"edition_id":1,"name":"Underground Utility Damage Prevention Act","identifier":"10.3","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":249261,"object_type":"structure","relational_id":12882,"identifier":"10.3","token":"56\/10.3","url":"\/56\/10.3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":67078,"structure_id":12882,"section_number":"56-265.14","catch_line":"Short title","url":"\/56-265.14\/","token":"56\/10.3\/56-265.14","metadata":false},{"id":58284,"structure_id":12882,"section_number":"56-265.15","catch_line":"Definitions; calculation of time periods","url":"\/56-265.15\/","token":"56\/10.3\/56-265.15","metadata":false},{"id":77182,"structure_id":12882,"section_number":"56-265.15:1","catch_line":" Exemptions; routine maintenance","url":"\/56-265.15_1\/","token":"56\/10.3\/56-265.15_1","metadata":false},{"id":84032,"structure_id":12882,"section_number":"56-265.16","catch_line":"Repealed","url":"\/56-265.16\/","token":"56\/10.3\/56-265.16","metadata":false},{"id":56272,"structure_id":12882,"section_number":"56-265.16:1","catch_line":"Operators to join notification centers; certification","url":"\/56-265.16_1\/","token":"56\/10.3\/56-265.16_1","metadata":false},{"id":71572,"structure_id":12882,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},{"id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},{"id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},{"id":81609,"structure_id":12882,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},{"id":87274,"structure_id":12882,"section_number":"56-265.18","catch_line":"Notification requirements","url":"\/56-265.18\/","token":"56\/10.3\/56-265.18","metadata":false},{"id":56575,"structure_id":12882,"section_number":"56-265.19","catch_line":"Duties of operator; regulations","url":"\/56-265.19\/","token":"56\/10.3\/56-265.19","metadata":false},{"id":76344,"structure_id":12882,"section_number":"56-265.19:1","catch_line":"Private sewer laterals and sewer system laterals","url":"\/56-265.19_1\/","token":"56\/10.3\/56-265.19_1","metadata":false},{"id":61252,"structure_id":12882,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},{"id":80434,"structure_id":12882,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","metadata":false},{"id":77696,"structure_id":12882,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},{"id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},{"id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},{"id":87171,"structure_id":12882,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},{"id":68853,"structure_id":12882,"section_number":"56-265.24","catch_line":"Duties of excavator","url":"\/56-265.24\/","token":"56\/10.3\/56-265.24","metadata":false},{"id":84234,"structure_id":12882,"section_number":"56-265.24:1","catch_line":"Request to cease operation; immediate threat; penalty","url":"\/56-265.24_1\/","token":"56\/10.3\/56-265.24_1","metadata":false},{"id":57821,"structure_id":12882,"section_number":"56-265.25","catch_line":"Liability of operator and excavator; penalties","url":"\/56-265.25\/","token":"56\/10.3\/56-265.25","metadata":false},{"id":54008,"structure_id":12882,"section_number":"56-265.26","catch_line":"Repealed","url":"\/56-265.26\/","token":"56\/10.3\/56-265.26","metadata":false},{"id":84847,"structure_id":12882,"section_number":"56-265.26:1","catch_line":"Utility line depth requirement","url":"\/56-265.26_1\/","token":"56\/10.3\/56-265.26_1","metadata":false},{"id":77994,"structure_id":12882,"section_number":"56-265.27","catch_line":"Repealed","url":"\/56-265.27\/","token":"56\/10.3\/56-265.27","metadata":false},{"id":86798,"structure_id":12882,"section_number":"56-265.28","catch_line":"Sovereign immunity","url":"\/56-265.28\/","token":"56\/10.3\/56-265.28","metadata":false},{"id":79358,"structure_id":12882,"section_number":"56-265.29","catch_line":"Other similar laws","url":"\/56-265.29\/","token":"56\/10.3\/56-265.29","metadata":false},{"id":56066,"structure_id":12882,"section_number":"56-265.30","catch_line":"Authority of the State Corporation Commission","url":"\/56-265.30\/","token":"56\/10.3\/56-265.30","metadata":false},{"id":54014,"structure_id":12882,"section_number":"56-265.31","catch_line":"Commission to establish advisory committee","url":"\/56-265.31\/","token":"56\/10.3\/56-265.31","metadata":false},{"id":73298,"structure_id":12882,"section_number":"56-265.32","catch_line":"Commission to impose civil penalties for certain violations; establishment of Underground Utility Damage Prevention Special Fund","url":"\/56-265.32\/","token":"56\/10.3\/56-265.32","metadata":false}],"previous_section":{"id":77696,"structure_id":12882,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},"next_section":{"id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-265.22\/","history_text":"<p>This law was first created in 1979. The record of its establishment is cataloged in chapter 291 of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. Unfortunately, the 1979 \u201cActs\u201d aren\u2019t available online. It has been modified 3 times. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. Those modifications are as follows: in 1994, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?941+ful+CHAP0890\">890<\/a>; in 2002, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0841\">841<\/a>; in 2023, chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?231+ful+CHAP0299\">299<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?231+ful+CHAP0300\">300<\/a>.<\/p>","references":false,"refers_to":false,"permalink":{"id":249323,"object_type":"law","relational_id":64117,"identifier":"56-265.22","token":"56\/10.3\/56-265.22","url":"\/56-265.22\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","dublin_core":{"Title":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-265.22","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The notification center shall, upon receiving notice by a <span class=\"dictionary\">person<\/span>, notify all member operators whose utility lines are present in the area of the proposed project, excavation, or demolition. The notification center shall also indicate the names of those operators being notified to the <span class=\"dictionary\">person<\/span> providing notice. <a id=\"paragraph-233439\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> If the notification required by this chapter is made by telephone, a record of such notification shall be maintained by the operators or notification center notified to document compliance with the requirements of this chapter, and such records shall be maintained in compliance with the applicable <span class=\"dictionary\">statute of limitations<\/span>. <a id=\"paragraph-233440\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> The notification center shall notify excavators, within the time frame allowed by the <span class=\"dictionary\">law<\/span> to mark underground utility lines, of any responses placed on the positive response system by a locator. Such notification shall occur by mutually acceptable means of automatically transmitting and receiving this information.\n\t\t\tIf the excavator cannot provide the notification center with mutually acceptable means of automatically transmitting and receiving this information, it shall be the excavator&#8217;s responsibility to contact the positive response system after the period allowed by <span class=\"dictionary\">law<\/span> to mark underground facilities and prior to commencing excavation in <span class=\"dictionary\">order<\/span> to determine if any responses to the notice have been recorded. <a id=\"paragraph-233441\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nDUTIES OF NOTIFICATION CENTER UPON NOTIFICATION BY PERSON INTENDING TO EXCAVATE;\nRECORD OF NOTIFICATION MADE BY TELEPHONE REQUIRED (\u00a7 56-265.22)\n\nA. The notification center shall, upon receiving notice by a person, notify all\nmember operators whose utility lines are present in the area of the proposed\nproject, excavation, or demolition. The notification center shall also indicate\nthe names of those operators being notified to the person providing notice.\n\nB. If the notification required by this chapter is made by telephone, a record\nof such notification shall be maintained by the operators or notification center\nnotified to document compliance with the requirements of this chapter, and such\nrecords shall be maintained in compliance with the applicable statute of\nlimitations.\n\nC. The notification center shall notify excavators, within the time frame\nallowed by the law to mark underground utility lines, of any responses placed on\nthe positive response system by a locator. Such notification shall occur by\nmutually acceptable means of automatically transmitting and receiving this\ninformation.\n\t\t\tIf the excavator cannot provide the notification center with mutually\nacceptable means of automatically transmitting and receiving this information,\nit shall be the excavator&#8217;s responsibility to contact the positive\nresponse system after the period allowed by law to mark underground facilities\nand prior to commencing excavation in order to determine if any responses to the\nnotice have been recorded.\n\nHISTORY: 1979, c. 291; 1994, c. 890; 2002, c. 841; 2023, cc. 299, 300.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}