{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-265.22_1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-265.22_1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-265.22_1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-265.22_1.html"}],"law_id":66270,"edition_id":1,"section_id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","history":"2002, c. 841.","full_text":"A\n\nAny person planning excavation or demolition in such proximity to the underground utility lines that the utility lines may be destroyed, damaged, dislocated, or disturbed may request a meeting with the operator whose underground utility lines are located in the area of the proposed excavation or demolition to discuss the marking of such lines. The project requiring excavation shall be of sufficient complexity to require a pre-marking meeting. The meeting notice shall include all information required by &#xA7; 56-265.18 and a specific time and location for the meeting.B\n\nThe notification center shall, upon receiving a meeting notice, notify all member operators whose underground utility lines are located in the area of the proposed excavation or demolition. The notification center shall provide to the excavator the names of those operators being notified of the meeting.C\n\nThe operators notified by the notification center shall meet with the excavator by 7:00 a.m. on the third working day following the excavator&#8217;s meeting notice. If an operator does not agree to the excavator&#8217;s suggested time and location, the operator shall set up a mutually agreeable time and location to meet no later than 7:00 a.m. on the third working day following the meeting notice.D\n\nThe excavator&#8217;s meeting notice shall not be the notice to excavate required under &#xA7; 56-265.17. The notice to excavate required under &#xA7; 56-265.17 for the project shall not be submitted to the notification center until after the meeting referenced in subsection A of this section has occurred, or after 7:00 a.m. on the third working day following the meeting notice.","order_by":null,"text":{"0":{"id":240672,"text":"Any person planning excavation or demolition in such proximity to the underground utility lines that the utility lines may be destroyed, damaged, dislocated, or disturbed may request a meeting with the operator whose underground utility lines are located in the area of the proposed excavation or demolition to discuss the marking of such lines. The project requiring excavation shall be of sufficient complexity to require a pre-marking meeting. The meeting notice shall include all information required by &#xA7; 56-265.18 and a specific time and location for the meeting.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":240673,"text":"The notification center shall, upon receiving a meeting notice, notify all member operators whose underground utility lines are located in the area of the proposed excavation or demolition. The notification center shall provide to the excavator the names of those operators being notified of the meeting.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":240674,"text":"The operators notified by the notification center shall meet with the excavator by 7:00 a.m. on the third working day following the excavator&#8217;s meeting notice. If an operator does not agree to the excavator&#8217;s suggested time and location, the operator shall set up a mutually agreeable time and location to meet no later than 7:00 a.m. on the third working day following the meeting notice.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B","next_prefix":"D"},"3":{"id":240675,"text":"The excavator&#8217;s meeting notice shall not be the notice to excavate required under &#xA7; 56-265.17. The notice to excavate required under &#xA7; 56-265.17 for the project shall not be submitted to the notification center until after the meeting referenced in subsection A of this section has occurred, or after 7:00 a.m. on the third working day following the meeting notice.","type":"section","prefixes":["D"],"prefix":"D","entire_prefix":"D","prefix_anchor":"D","level":1,"prior_prefix":"C"}},"ancestry":[{"id":12882,"edition_id":1,"name":"Underground Utility Damage Prevention Act","identifier":"10.3","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":249261,"object_type":"structure","relational_id":12882,"identifier":"10.3","token":"56\/10.3","url":"\/56\/10.3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":67078,"structure_id":12882,"section_number":"56-265.14","catch_line":"Short title","url":"\/56-265.14\/","token":"56\/10.3\/56-265.14","metadata":false},{"id":58284,"structure_id":12882,"section_number":"56-265.15","catch_line":"Definitions; calculation of time periods","url":"\/56-265.15\/","token":"56\/10.3\/56-265.15","metadata":false},{"id":77182,"structure_id":12882,"section_number":"56-265.15:1","catch_line":" Exemptions; routine maintenance","url":"\/56-265.15_1\/","token":"56\/10.3\/56-265.15_1","metadata":false},{"id":84032,"structure_id":12882,"section_number":"56-265.16","catch_line":"Repealed","url":"\/56-265.16\/","token":"56\/10.3\/56-265.16","metadata":false},{"id":56272,"structure_id":12882,"section_number":"56-265.16:1","catch_line":"Operators to join notification centers; certification","url":"\/56-265.16_1\/","token":"56\/10.3\/56-265.16_1","metadata":false},{"id":71572,"structure_id":12882,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","url":"\/56-265.17\/","token":"56\/10.3\/56-265.17","metadata":false},{"id":83153,"structure_id":12882,"section_number":"56-265.17:1","catch_line":"Notification and procedures for designers","url":"\/56-265.17_1\/","token":"56\/10.3\/56-265.17_1","metadata":false},{"id":61626,"structure_id":12882,"section_number":"56-265.17:2","catch_line":"Procedures for project owners","url":"\/56-265.17_2\/","token":"56\/10.3\/56-265.17_2","metadata":false},{"id":81609,"structure_id":12882,"section_number":"56-265.17:3","catch_line":"Procedures for operators in response to a designer notice","url":"\/56-265.17_3\/","token":"56\/10.3\/56-265.17_3","metadata":false},{"id":87274,"structure_id":12882,"section_number":"56-265.18","catch_line":"Notification requirements","url":"\/56-265.18\/","token":"56\/10.3\/56-265.18","metadata":false},{"id":56575,"structure_id":12882,"section_number":"56-265.19","catch_line":"Duties of operator; regulations","url":"\/56-265.19\/","token":"56\/10.3\/56-265.19","metadata":false},{"id":76344,"structure_id":12882,"section_number":"56-265.19:1","catch_line":"Private sewer laterals and sewer system laterals","url":"\/56-265.19_1\/","token":"56\/10.3\/56-265.19_1","metadata":false},{"id":61252,"structure_id":12882,"section_number":"56-265.20","catch_line":"Repealed","url":"\/56-265.20\/","token":"56\/10.3\/56-265.20","metadata":false},{"id":80434,"structure_id":12882,"section_number":"56-265.20:1","catch_line":"Locating nonmetallic underground utility lines","url":"\/56-265.20_1\/","token":"56\/10.3\/56-265.20_1","metadata":false},{"id":77696,"structure_id":12882,"section_number":"56-265.21","catch_line":"Marking by color","url":"\/56-265.21\/","token":"56\/10.3\/56-265.21","metadata":false},{"id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},{"id":66270,"structure_id":12882,"section_number":"56-265.22:1","catch_line":"Meetings between excavators and operators","url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","metadata":false},{"id":87171,"structure_id":12882,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},{"id":68853,"structure_id":12882,"section_number":"56-265.24","catch_line":"Duties of excavator","url":"\/56-265.24\/","token":"56\/10.3\/56-265.24","metadata":false},{"id":84234,"structure_id":12882,"section_number":"56-265.24:1","catch_line":"Request to cease operation; immediate threat; penalty","url":"\/56-265.24_1\/","token":"56\/10.3\/56-265.24_1","metadata":false},{"id":57821,"structure_id":12882,"section_number":"56-265.25","catch_line":"Liability of operator and excavator; penalties","url":"\/56-265.25\/","token":"56\/10.3\/56-265.25","metadata":false},{"id":54008,"structure_id":12882,"section_number":"56-265.26","catch_line":"Repealed","url":"\/56-265.26\/","token":"56\/10.3\/56-265.26","metadata":false},{"id":84847,"structure_id":12882,"section_number":"56-265.26:1","catch_line":"Utility line depth requirement","url":"\/56-265.26_1\/","token":"56\/10.3\/56-265.26_1","metadata":false},{"id":77994,"structure_id":12882,"section_number":"56-265.27","catch_line":"Repealed","url":"\/56-265.27\/","token":"56\/10.3\/56-265.27","metadata":false},{"id":86798,"structure_id":12882,"section_number":"56-265.28","catch_line":"Sovereign immunity","url":"\/56-265.28\/","token":"56\/10.3\/56-265.28","metadata":false},{"id":79358,"structure_id":12882,"section_number":"56-265.29","catch_line":"Other similar laws","url":"\/56-265.29\/","token":"56\/10.3\/56-265.29","metadata":false},{"id":56066,"structure_id":12882,"section_number":"56-265.30","catch_line":"Authority of the State Corporation Commission","url":"\/56-265.30\/","token":"56\/10.3\/56-265.30","metadata":false},{"id":54014,"structure_id":12882,"section_number":"56-265.31","catch_line":"Commission to establish advisory committee","url":"\/56-265.31\/","token":"56\/10.3\/56-265.31","metadata":false},{"id":73298,"structure_id":12882,"section_number":"56-265.32","catch_line":"Commission to impose civil penalties for certain violations; establishment of Underground Utility Damage Prevention Special Fund","url":"\/56-265.32\/","token":"56\/10.3\/56-265.32","metadata":false}],"previous_section":{"id":64117,"structure_id":12882,"section_number":"56-265.22","catch_line":"Duties of notification center upon notification by person intending to excavate; record of notification made by telephone required","url":"\/56-265.22\/","token":"56\/10.3\/56-265.22","metadata":false},"next_section":{"id":87171,"structure_id":12882,"section_number":"56-265.23","catch_line":"Exemption for roadway maintenance operations by the Virginia Department of Transportation and certain counties, cities, and towns","url":"\/56-265.23\/","token":"56\/10.3\/56-265.23","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-265.22:1\/","history_text":"<p>This law was first created in 2002. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0841\">841<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":71572,"section_number":"56-265.17","catch_line":"Notification required prior to excavation or demolition; waiting periods; marking of proposed site","order_by":null,"url":"\/56-265.17\/"},{"id":87274,"section_number":"56-265.18","catch_line":"Notification requirements","order_by":null,"url":"\/56-265.18\/"}],"permalink":{"id":249327,"object_type":"law","relational_id":66270,"identifier":"56-265.22:1","token":"56\/10.3\/56-265.22_1","url":"\/56-265.22_1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-265.22_1\/","token":"56\/10.3\/56-265.22_1","dublin_core":{"Title":"Meetings between excavators and operators","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-265.22:1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Any <span class=\"dictionary\">person<\/span> planning excavation or demolition in such proximity to the underground utility lines that the utility lines may be destroyed, damaged, dislocated, or disturbed may request a meeting with the operator whose underground utility lines are located in the area of the proposed excavation or demolition to discuss the marking of such lines. The project requiring excavation shall be of sufficient complexity to require a pre-marking meeting. The meeting notice shall include all information required by &#xA7; <a class=\"law\" title=\"Notification requirements\" href=\"\/56-265.18\/\">56-265.18<\/a> and a specific time and location for the meeting. <a id=\"paragraph-240672\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22_1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The notification center shall, upon receiving a meeting notice, notify all member operators whose underground utility lines are located in the area of the proposed excavation or demolition. The notification center shall provide to the excavator the names of those operators being notified of the meeting. <a id=\"paragraph-240673\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22_1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> The operators notified by the notification center shall meet with the excavator by 7:00 a.m. on the third working day following the excavator&#8217;s meeting notice. If an operator does not agree to the excavator&#8217;s suggested time and location, the operator shall set up a mutually agreeable time and location to meet no later than 7:00 a.m. on the third working day following the meeting notice. <a id=\"paragraph-240674\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22_1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"D\"><p><span class=\"prefix-number\">D.<\/span> The excavator&#8217;s meeting notice shall not be the notice to excavate required under &#xA7; <a class=\"law\" title=\"Notification required prior to excavation or demolition; waiting periods; marking of proposed site\" href=\"\/56-265.17\/\">56-265.17<\/a>. The notice to excavate required under &#xA7; <a class=\"law\" title=\"Notification required prior to excavation or demolition; waiting periods; marking of proposed site\" href=\"\/56-265.17\/\">56-265.17<\/a> for the project shall not be submitted to the notification center until after the meeting referenced in subsection A of this section has occurred, or after 7:00 a.m. on the third working day following the meeting notice. <a id=\"paragraph-240675\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-265.22_1\/#D\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nMEETINGS BETWEEN EXCAVATORS AND OPERATORS (\u00a7 56-265.22:1)\n\nA. Any person planning excavation or demolition in such proximity to the\nunderground utility lines that the utility lines may be destroyed, damaged,\ndislocated, or disturbed may request a meeting with the operator whose\nunderground utility lines are located in the area of the proposed excavation or\ndemolition to discuss the marking of such lines. The project requiring\nexcavation shall be of sufficient complexity to require a pre-marking meeting.\nThe meeting notice shall include all information required by &#xA7; 56-265.18\nand a specific time and location for the meeting.\n\nB. The notification center shall, upon receiving a meeting notice, notify all\nmember operators whose underground utility lines are located in the area of the\nproposed excavation or demolition. The notification center shall provide to the\nexcavator the names of those operators being notified of the meeting.\n\nC. The operators notified by the notification center shall meet with the\nexcavator by 7:00 a.m. on the third working day following the excavator&#8217;s\nmeeting notice. If an operator does not agree to the excavator&#8217;s suggested\ntime and location, the operator shall set up a mutually agreeable time and\nlocation to meet no later than 7:00 a.m. on the third working day following the\nmeeting notice.\n\nD. The excavator&#8217;s meeting notice shall not be the notice to excavate\nrequired under &#xA7; 56-265.17. The notice to excavate required under &#xA7;\n56-265.17 for the project shall not be submitted to the notification center\nuntil after the meeting referenced in subsection A of this section has occurred,\nor after 7:00 a.m. on the third working day following the meeting notice.\n\nHISTORY: 2002, c. 841.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}