{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-575.13.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-575.13.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-575.13.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-575.13.html"}],"law_id":82966,"edition_id":1,"section_id":82966,"structure_id":13265,"section_number":"56-575.13","catch_line":"Utility crossing","history":"2002, c. 571; 2005, c. 865.","full_text":"The private entity and each public service company, public utility, railroad, and cable television provider, whose facilities are to be crossed or affected shall cooperate fully with the other entity in planning and arranging the manner of the crossing or relocation of the facilities. Any such entity possessing the power of condemnation is hereby expressly granted such powers in connection with the moving or relocation of facilities to be crossed by the qualifying project or that must be relocated to the extent that such moving or relocation is made necessary or desirable by construction of, renovation to, or improvements to the qualifying project, which shall be construed to include construction of, renovation to, or improvements to temporary facilities for the purpose of providing service during the period of construction or improvement. Any amount to be paid for such crossing, construction, moving or relocating of facilities shall be paid for by the private entity. Should the private entity and any such public service company, public utility, railroad, and cable television provider not be able to agree upon a plan for the crossing or relocation, the Commission may determine the manner in which the crossing or relocation is to be accomplished and any damages due arising out of the crossing or relocation. The Commission may employ expert engineers who shall examine the location and plans for such crossing or relocation, hear any objections and consider modifications, and make a recommendation to the Commission. In such a case, the cost of the experts is to be borne by the private entity. Such determination shall be made by the Commission within ninety days of notification by the private entity that the qualifying project will cross utilities subject to the Commission&#8217;s jurisdiction.","order_by":null,"text":{"0":{"id":297358,"text":"The private entity and each public service company, public utility, railroad, and cable television provider, whose facilities are to be crossed or affected shall cooperate fully with the other entity in planning and arranging the manner of the crossing or relocation of the facilities. Any such entity possessing the power of condemnation is hereby expressly granted such powers in connection with the moving or relocation of facilities to be crossed by the qualifying project or that must be relocated to the extent that such moving or relocation is made necessary or desirable by construction of, renovation to, or improvements to the qualifying project, which shall be construed to include construction of, renovation to, or improvements to temporary facilities for the purpose of providing service during the period of construction or improvement. Any amount to be paid for such crossing, construction, moving or relocating of facilities shall be paid for by the private entity. Should the private entity and any such public service company, public utility, railroad, and cable television provider not be able to agree upon a plan for the crossing or relocation, the Commission may determine the manner in which the crossing or relocation is to be accomplished and any damages due arising out of the crossing or relocation. The Commission may employ expert engineers who shall examine the location and plans for such crossing or relocation, hear any objections and consider modifications, and make a recommendation to the Commission. In such a case, the cost of the experts is to be borne by the private entity. Such determination shall be made by the Commission within ninety days of notification by the private entity that the qualifying project will cross utilities subject to the Commission&#8217;s jurisdiction.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":13265,"edition_id":1,"name":"The Public-Private Education Facilities and Infrastructure Act of 2002","identifier":"22.1","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:33","date_modified":"2026-06-26 03:44:33","permalink":{"id":250511,"object_type":"structure","relational_id":13265,"identifier":"22.1","token":"56\/22.1","url":"\/56\/22.1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":54549,"structure_id":13265,"section_number":"56-575.1","catch_line":"Definitions","url":"\/56-575.1\/","token":"56\/22.1\/56-575.1","metadata":false},{"id":54274,"structure_id":13265,"section_number":"56-575.10","catch_line":"Federal, state and local assistance","url":"\/56-575.10\/","token":"56\/22.1\/56-575.10","metadata":false},{"id":56009,"structure_id":13265,"section_number":"56-575.11","catch_line":"Material default; remedies","url":"\/56-575.11\/","token":"56\/22.1\/56-575.11","metadata":false},{"id":87080,"structure_id":13265,"section_number":"56-575.12","catch_line":"Condemnation","url":"\/56-575.12\/","token":"56\/22.1\/56-575.12","metadata":false},{"id":82966,"structure_id":13265,"section_number":"56-575.13","catch_line":"Utility crossing","url":"\/56-575.13\/","token":"56\/22.1\/56-575.13","metadata":false},{"id":81141,"structure_id":13265,"section_number":"56-575.14","catch_line":"Police powers; violations of law","url":"\/56-575.14\/","token":"56\/22.1\/56-575.14","metadata":false},{"id":73223,"structure_id":13265,"section_number":"56-575.15","catch_line":"Sovereign immunity","url":"\/56-575.15\/","token":"56\/22.1\/56-575.15","metadata":false},{"id":63083,"structure_id":13265,"section_number":"56-575.16","catch_line":"Procurement","url":"\/56-575.16\/","token":"56\/22.1\/56-575.16","metadata":false},{"id":80943,"structure_id":13265,"section_number":"56-575.17","catch_line":"Posting of conceptual proposals; public comment; public access to procurement records","url":"\/56-575.17\/","token":"56\/22.1\/56-575.17","metadata":false},{"id":77861,"structure_id":13265,"section_number":"56-575.17:1","catch_line":"Contributions and gifts; prohibition during approval process","url":"\/56-575.17_1\/","token":"56\/22.1\/56-575.17_1","metadata":false},{"id":71889,"structure_id":13265,"section_number":"56-575.18","catch_line":"Auditor of Public Accounts","url":"\/56-575.18\/","token":"56\/22.1\/56-575.18","metadata":false},{"id":79879,"structure_id":13265,"section_number":"56-575.2","catch_line":"Declaration of public purpose","url":"\/56-575.2\/","token":"56\/22.1\/56-575.2","metadata":false},{"id":62611,"structure_id":13265,"section_number":"56-575.3","catch_line":"Prerequisite for operation of a qualifying project","url":"\/56-575.3\/","token":"56\/22.1\/56-575.3","metadata":false},{"id":80801,"structure_id":13265,"section_number":"56-575.3:1","catch_line":"Adoption of guidelines by responsible public entities","url":"\/56-575.3_1\/","token":"56\/22.1\/56-575.3_1","metadata":false},{"id":78855,"structure_id":13265,"section_number":"56-575.4","catch_line":"Approval of qualifying projects by the responsible public entity","url":"\/56-575.4\/","token":"56\/22.1\/56-575.4","metadata":false},{"id":54265,"structure_id":13265,"section_number":"56-575.5","catch_line":"Service contracts","url":"\/56-575.5\/","token":"56\/22.1\/56-575.5","metadata":false},{"id":71324,"structure_id":13265,"section_number":"56-575.6","catch_line":"Affected local jurisdictions","url":"\/56-575.6\/","token":"56\/22.1\/56-575.6","metadata":false},{"id":83102,"structure_id":13265,"section_number":"56-575.7","catch_line":"Dedication of public property","url":"\/56-575.7\/","token":"56\/22.1\/56-575.7","metadata":false},{"id":58668,"structure_id":13265,"section_number":"56-575.8","catch_line":"Powers and duties of the private entity","url":"\/56-575.8\/","token":"56\/22.1\/56-575.8","metadata":false},{"id":70640,"structure_id":13265,"section_number":"56-575.9","catch_line":"Comprehensive agreement","url":"\/56-575.9\/","token":"56\/22.1\/56-575.9","metadata":false},{"id":86484,"structure_id":13265,"section_number":"56-575.9:1","catch_line":"Interim agreement","url":"\/56-575.9_1\/","token":"56\/22.1\/56-575.9_1","metadata":false}],"previous_section":{"id":87080,"structure_id":13265,"section_number":"56-575.12","catch_line":"Condemnation","url":"\/56-575.12\/","token":"56\/22.1\/56-575.12","metadata":false},"next_section":{"id":81141,"structure_id":13265,"section_number":"56-575.14","catch_line":"Police powers; violations of law","url":"\/56-575.14\/","token":"56\/22.1\/56-575.14","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-575.13\/","history_text":"<p>This law was first created in 2002. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?021+ful+CHAP0571\">571<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2005, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?051+ful+CHAP0865\">865<\/a>.<\/p>","references":false,"refers_to":false,"permalink":{"id":250529,"object_type":"law","relational_id":82966,"identifier":"56-575.13","token":"56\/22.1\/56-575.13","url":"\/56-575.13\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-575.13\/","token":"56\/22.1\/56-575.13","dublin_core":{"Title":"Utility crossing","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-575.13","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The <span class=\"dictionary\">private entity<\/span> and each <span class=\"dictionary\">public service company<\/span>, public utility, <span class=\"dictionary\">railroad<\/span>, and cable television provider, whose facilities are to be crossed or affected shall cooperate fully with the other entity in planning and arranging the manner of the crossing or relocation of the facilities. Any such entity possessing the power of condemnation is hereby expressly granted such powers in connection with the moving or relocation of facilities to be crossed by the <span class=\"dictionary\">qualifying project<\/span> or that must be relocated to the extent that such moving or relocation is made necessary or desirable by construction of, renovation to, or improvements to the <span class=\"dictionary\">qualifying project<\/span>, which shall be construed to include construction of, renovation to, or improvements to temporary facilities for the purpose of providing service during the period of construction or improvement. Any amount to be paid for such crossing, construction, moving or relocating of facilities shall be paid for by the <span class=\"dictionary\">private entity<\/span>. Should the <span class=\"dictionary\">private entity<\/span> and any such <span class=\"dictionary\">public service company<\/span>, public utility, <span class=\"dictionary\">railroad<\/span>, and cable television provider not be able to agree upon a plan for the crossing or relocation, the <span class=\"dictionary\">Commission<\/span> may determine the manner in which the crossing or relocation is to be accomplished and any <span class=\"dictionary\">damages<\/span> due arising out of the crossing or relocation. The <span class=\"dictionary\">Commission<\/span> may employ expert engineers who shall examine the location and plans for such crossing or relocation, hear any objections and consider modifications, and make a recommendation to the <span class=\"dictionary\">Commission<\/span>. In such a case, the cost of the experts is to be borne by the <span class=\"dictionary\">private entity<\/span>. Such determination shall be made by the <span class=\"dictionary\">Commission<\/span> within ninety days of notification by the <span class=\"dictionary\">private entity<\/span> that the <span class=\"dictionary\">qualifying project<\/span> will cross utilities subject to the <span class=\"dictionary\">Commission<\/span>&#8217;s <span class=\"dictionary\">jurisdiction<\/span>.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nUTILITY CROSSING (\u00a7 56-575.13)\n\nThe private entity and each public service company, public utility, railroad,\nand cable television provider, whose facilities are to be crossed or affected\nshall cooperate fully with the other entity in planning and arranging the manner\nof the crossing or relocation of the facilities. Any such entity possessing the\npower of condemnation is hereby expressly granted such powers in connection with\nthe moving or relocation of facilities to be crossed by the qualifying project\nor that must be relocated to the extent that such moving or relocation is made\nnecessary or desirable by construction of, renovation to, or improvements to the\nqualifying project, which shall be construed to include construction of,\nrenovation to, or improvements to temporary facilities for the purpose of\nproviding service during the period of construction or improvement. Any amount\nto be paid for such crossing, construction, moving or relocating of facilities\nshall be paid for by the private entity. Should the private entity and any such\npublic service company, public utility, railroad, and cable television provider\nnot be able to agree upon a plan for the crossing or relocation, the Commission\nmay determine the manner in which the crossing or relocation is to be\naccomplished and any damages due arising out of the crossing or relocation. The\nCommission may employ expert engineers who shall examine the location and plans\nfor such crossing or relocation, hear any objections and consider modifications,\nand make a recommendation to the Commission. In such a case, the cost of the\nexperts is to be borne by the private entity. Such determination shall be made\nby the Commission within ninety days of notification by the private entity that\nthe qualifying project will cross utilities subject to the Commission&#8217;s\njurisdiction.\n\nHISTORY: 2002, c. 571; 2005, c. 865.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}