{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-577.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-577.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-577.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-577.1.html"}],"law_id":69790,"edition_id":1,"section_id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","history":"2020, c. 796.","full_text":"A\n\nThe Commission shall conduct a pilot program under which two or more nonresidential customers that, as of February 25, 2019, had filed applications seeking to aggregate their load pursuant to subdivision A 4 of \u00a7 56-577 within the service territory of a Phase II Utility, as that term is defined in subsection A of \u00a7 56-585.1, shall be permitted to purchase electric energy from any supplier of electric energy licensed to sell electric energy within the Commonwealth, subject to the following terms, conditions, and restrictions:1\n\nA pilot program shall be conducted within the certified service territory of the Phase II Utility in which such nonresidential customers are located.2\n\nThe aggregated load participating in the pilot program shall not exceed 200 megawatts.3\n\nAll customers participating in the pilot program shall be subject in all respects to the provisions of subdivision A 3 of &#xA7; 56-577, with participation in this pilot program being deemed to satisfy subdivision A 4 of &#xA7; 56-577 and with the load set forth in each application being treated as a single, individual customer for purposes of said subdivision, and shall submit an annual report to the Commission by March 31 each year to demonstrate that, for the preceding calendar year, such load continued to meet the demand limitations of subdivision A 3 of &#xA7; 56-577.B\n\nThe Commission shall review the pilot program established pursuant to subsection A in 2022.","order_by":null,"text":{"0":{"id":252217,"text":"The Commission shall conduct a pilot program under which two or more nonresidential customers that, as of February 25, 2019, had filed applications seeking to aggregate their load pursuant to subdivision A 4 of \u00a7 56-577 within the service territory of a Phase II Utility, as that term is defined in subsection A of \u00a7 56-585.1, shall be permitted to purchase electric energy from any supplier of electric energy licensed to sell electric energy within the Commonwealth, subject to the following terms, conditions, and restrictions:","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"A1"},"1":{"id":252218,"text":"A pilot program shall be conducted within the certified service territory of the Phase II Utility in which such nonresidential customers are located.","type":"section","prefixes":["A","1"],"prefix":"1","entire_prefix":"A1","prefix_anchor":"A1","level":2,"prior_prefix":"A","next_prefix":"A2"},"2":{"id":252219,"text":"The aggregated load participating in the pilot program shall not exceed 200 megawatts.","type":"section","prefixes":["A","2"],"prefix":"2","entire_prefix":"A2","prefix_anchor":"A2","level":2,"prior_prefix":"A1","next_prefix":"A3"},"3":{"id":252220,"text":"All customers participating in the pilot program shall be subject in all respects to the provisions of subdivision A 3 of &#xA7; 56-577, with participation in this pilot program being deemed to satisfy subdivision A 4 of &#xA7; 56-577 and with the load set forth in each application being treated as a single, individual customer for purposes of said subdivision, and shall submit an annual report to the Commission by March 31 each year to demonstrate that, for the preceding calendar year, such load continued to meet the demand limitations of subdivision A 3 of &#xA7; 56-577.","type":"section","prefixes":["A","3"],"prefix":"3","entire_prefix":"A3","prefix_anchor":"A3","level":2,"prior_prefix":"A2","next_prefix":"B"},"4":{"id":252221,"text":"The Commission shall review the pilot program established pursuant to subsection A in 2022.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A3"}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},"next_section":{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-577.1\/","history_text":"<p>This law was first created in 2020. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?201+ful+CHAP0796\">796<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":55979,"section_number":"56-249.6:1","catch_line":"Financing for certain deferred fuel costs; Phase I Utilities.","order_by":null,"url":"\/56-249.6_1\/"},{"id":74921,"section_number":"56-249.6:2","catch_line":"Financing for certain deferred fuel costs; Phase II Utilities","order_by":null,"url":"\/56-249.6_2\/"}],"refers_to":[{"id":79838,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","order_by":null,"url":"\/56-577\/"},{"id":67687,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","order_by":null,"url":"\/56-585.1\/"}],"permalink":{"id":250607,"object_type":"law","relational_id":69790,"identifier":"56-577.1","token":"56\/23\/56-577.1","url":"\/56-577.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-577.1\/","token":"56\/23\/56-577.1","dublin_core":{"Title":"Electric utilities; retail competition; pilot program","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-577.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The <span class=\"dictionary\">Commission<\/span> shall conduct a pilot program under which two or more nonresidential customers that, as of February 25, 2019, had filed applications seeking to aggregate their load pursuant to subdivision A 4 of \u00a7&nbsp;<a class=\"law\" title=\"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs\" href=\"\/56-577\/\">56-577<\/a> within the service territory of a Phase II Utility, as that term is defined in subsection A of \u00a7&nbsp;<a class=\"law\" title=\"Generation, distribution, and transmission rates after capped rates terminate or expire\" href=\"\/56-585.1\/\">56-585.1<\/a>, shall be permitted to purchase electric energy from any <span class=\"dictionary\">supplier<\/span> of electric energy licensed to sell electric energy within the Commonwealth, subject to the following terms, conditions, and restrictions: <a id=\"paragraph-252217\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-577.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A1\" class=\"indent-1\"><p><span class=\"prefix-number\">1.<\/span> A pilot program shall be conducted within the certified service territory of the Phase II Utility in which such nonresidential customers are located. <a id=\"paragraph-252218\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-577.1\/#A1\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A2\" class=\"indent-1\"><p><span class=\"prefix-number\">2.<\/span> The aggregated load participating in the pilot program shall not exceed 200 megawatts. <a id=\"paragraph-252219\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-577.1\/#A2\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"A3\" class=\"indent-1\"><p><span class=\"prefix-number\">3.<\/span> All customers participating in the pilot program shall be subject in all respects to the provisions of subdivision A 3 of &#xA7; <a class=\"law\" title=\"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs\" href=\"\/56-577\/\">56-577<\/a>, with participation in this pilot program being deemed to satisfy subdivision A 4 of &#xA7; <a class=\"law\" title=\"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs\" href=\"\/56-577\/\">56-577<\/a> and with the load set forth in each application being treated as a single, individual customer for purposes of said subdivision, and shall submit an annual report to the <span class=\"dictionary\">Commission<\/span> by March 31 each year to demonstrate that, for the preceding calendar year, such load continued to meet the demand limitations of subdivision A 3 of &#xA7; <a class=\"law\" title=\"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs\" href=\"\/56-577\/\">56-577<\/a>. <a id=\"paragraph-252220\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-577.1\/#A3\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The <span class=\"dictionary\">Commission<\/span> shall review the pilot program established pursuant to subsection A in 2022. <a id=\"paragraph-252221\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-577.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nELECTRIC UTILITIES; RETAIL COMPETITION; PILOT PROGRAM (\u00a7 56-577.1)\n\nA. The Commission shall conduct a pilot program under which two or more\nnonresidential customers that, as of February 25, 2019, had filed applications\nseeking to aggregate their load pursuant to subdivision A 4 of \u00a7 56-577 within\nthe service territory of a Phase II Utility, as that term is defined in\nsubsection A of \u00a7 56-585.1, shall be permitted to purchase electric energy from\nany supplier of electric energy licensed to sell electric energy within the\nCommonwealth, subject to the following terms, conditions, and restrictions:\n\n   1. A pilot program shall be conducted within the certified service territory\n   of the Phase II Utility in which such nonresidential customers are located.\n\n   2. The aggregated load participating in the pilot program shall not exceed 200\n   megawatts.\n\n   3. All customers participating in the pilot program shall be subject in all\n   respects to the provisions of subdivision A 3 of &#xA7; 56-577, with\n   participation in this pilot program being deemed to satisfy subdivision A 4 of\n   &#xA7; 56-577 and with the load set forth in each application being treated as\n   a single, individual customer for purposes of said subdivision, and shall\n   submit an annual report to the Commission by March 31 each year to demonstrate\n   that, for the preceding calendar year, such load continued to meet the demand\n   limitations of subdivision A 3 of &#xA7; 56-577.\n\nB. The Commission shall review the pilot program established pursuant to\nsubsection A in 2022.\n\nHISTORY: 2020, c. 796.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}