{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-585.1_7.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-585.1_7.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-585.1_7.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-585.1_7.html"}],"law_id":73105,"edition_id":1,"section_id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","history":"2018, c. 415.","full_text":"A\n\nThe Commission shall require a Phase II Utility as defined in subdivision A 1 of &#xA7; 56-585.1 to submit a proposal to the Commission to conduct a pilot program, not to exceed 10 megawatts in the aggregate, in its certificated service territory to allow any school in a public school division in the Commonwealth that generates electricity from a wind-powered or solar-powered renewable energy generation facility located at the school in amounts that exceed the amount of electricity consumed by the school in a billing period, at the option of the school board, to either (i) credit such excess electricity to the metered accounts of one or more other schools in the same public school division, as directed by the school board, in a manner that reduces the amount of electricity for which the other school or schools are billed and provides the other school or schools with a credit against the amount billed to the other school or schools, which credit shall be at the same rate that the school or schools would otherwise be charged for such amount of electricity, without the assessment by the supplier of any service charges or fees in connection with or arising out of such crediting or (ii) receive payment for such excess electricity from the electric utility at the contractually negotiated rate. The duration of any pilot program approved by the Commission pursuant to this section shall be six years.B\n\nThe Commission shall, by December 1, 2018, adopt such rules or establish such guidelines as may be necessary for its general administration of the pilot program established under this section.C\n\nAny electric utility participating in the pilot program established under this section shall report to the General Assembly by December 1 of each year the pilot program is in effect, commencing in 2020, regarding the status of the pilot program&#8217;s enrollment and any other information that may be appropriate.","order_by":null,"text":{"0":{"id":263250,"text":"The Commission shall require a Phase II Utility as defined in subdivision A 1 of &#xA7; 56-585.1 to submit a proposal to the Commission to conduct a pilot program, not to exceed 10 megawatts in the aggregate, in its certificated service territory to allow any school in a public school division in the Commonwealth that generates electricity from a wind-powered or solar-powered renewable energy generation facility located at the school in amounts that exceed the amount of electricity consumed by the school in a billing period, at the option of the school board, to either (i) credit such excess electricity to the metered accounts of one or more other schools in the same public school division, as directed by the school board, in a manner that reduces the amount of electricity for which the other school or schools are billed and provides the other school or schools with a credit against the amount billed to the other school or schools, which credit shall be at the same rate that the school or schools would otherwise be charged for such amount of electricity, without the assessment by the supplier of any service charges or fees in connection with or arising out of such crediting or (ii) receive payment for such excess electricity from the electric utility at the contractually negotiated rate. The duration of any pilot program approved by the Commission pursuant to this section shall be six years.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":263251,"text":"The Commission shall, by December 1, 2018, adopt such rules or establish such guidelines as may be necessary for its general administration of the pilot program established under this section.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":263252,"text":"Any electric utility participating in the pilot program established under this section shall report to the General Assembly by December 1 of each year the pilot program is in effect, commencing in 2020, regarding the status of the pilot program&#8217;s enrollment and any other information that may be appropriate.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},"next_section":{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-585.1:7\/","history_text":"<p>This law was first created in 2018. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?181+ful+CHAP0415\">415<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":67687,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","order_by":null,"url":"\/56-585.1\/"}],"permalink":{"id":250703,"object_type":"law","relational_id":73105,"identifier":"56-585.1:7","token":"56\/23\/56-585.1_7","url":"\/56-585.1_7\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","dublin_core":{"Title":"Pilot program for electric generation by public schools","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-585.1:7","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> The <span class=\"dictionary\">Commission<\/span> shall require a Phase II Utility as defined in subdivision A 1 of &#xA7; <a class=\"law\" title=\"Generation, distribution, and transmission rates after capped rates terminate or expire\" href=\"\/56-585.1\/\">56-585.1<\/a> to submit a proposal to the <span class=\"dictionary\">Commission<\/span> to conduct a pilot program, not to exceed 10 megawatts in the aggregate, in its certificated service territory to allow any school in a public school division in the Commonwealth that generates electricity from a wind-powered or solar-powered <span class=\"dictionary\">renewable energy<\/span> generation facility located at the school in amounts that exceed the amount of electricity consumed by the school in a billing period, at the option of the school board, to either (i) credit such excess electricity to the metered accounts of one or more other schools in the same public school division, as directed by the school board, in a manner that reduces the amount of electricity for which the other school or schools are billed and provides the other school or schools with a credit against the amount billed to the other school or schools, which credit shall be at the same <span class=\"dictionary\">rate<\/span> that the school or schools would otherwise be charged for such amount of electricity, without the assessment by the <span class=\"dictionary\">supplier<\/span> of any service charges or fees in connection with or arising out of such crediting or (ii) receive payment for such excess electricity from the <span class=\"dictionary\">electric utility<\/span> at the contractually negotiated <span class=\"dictionary\">rate<\/span>. The duration of any pilot program approved by the <span class=\"dictionary\">Commission<\/span> pursuant to this section shall be six years. <a id=\"paragraph-263250\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-585.1_7\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> The <span class=\"dictionary\">Commission<\/span> shall, by December 1, 2018, adopt such rules or establish such guidelines as may be necessary for its general administration of the pilot program established under this section. <a id=\"paragraph-263251\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-585.1_7\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> Any <span class=\"dictionary\">electric utility<\/span> participating in the pilot program established under this section shall report to the General Assembly by December 1 of each year the pilot program is in effect, commencing in 2020, regarding the status of the pilot program&#8217;s enrollment and any other information that may be appropriate. <a id=\"paragraph-263252\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-585.1_7\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nPILOT PROGRAM FOR ELECTRIC GENERATION BY PUBLIC SCHOOLS (\u00a7 56-585.1:7)\n\nA. The Commission shall require a Phase II Utility as defined in subdivision A 1\nof &#xA7; 56-585.1 to submit a proposal to the Commission to conduct a pilot\nprogram, not to exceed 10 megawatts in the aggregate, in its certificated\nservice territory to allow any school in a public school division in the\nCommonwealth that generates electricity from a wind-powered or solar-powered\nrenewable energy generation facility located at the school in amounts that\nexceed the amount of electricity consumed by the school in a billing period, at\nthe option of the school board, to either (i) credit such excess electricity to\nthe metered accounts of one or more other schools in the same public school\ndivision, as directed by the school board, in a manner that reduces the amount\nof electricity for which the other school or schools are billed and provides the\nother school or schools with a credit against the amount billed to the other\nschool or schools, which credit shall be at the same rate that the school or\nschools would otherwise be charged for such amount of electricity, without the\nassessment by the supplier of any service charges or fees in connection with or\narising out of such crediting or (ii) receive payment for such excess\nelectricity from the electric utility at the contractually negotiated rate. The\nduration of any pilot program approved by the Commission pursuant to this\nsection shall be six years.\n\nB. The Commission shall, by December 1, 2018, adopt such rules or establish such\nguidelines as may be necessary for its general administration of the pilot\nprogram established under this section.\n\nC. Any electric utility participating in the pilot program established under\nthis section shall report to the General Assembly by December 1 of each year the\npilot program is in effect, commencing in 2020, regarding the status of the\npilot program&#8217;s enrollment and any other information that may be\nappropriate.\n\nHISTORY: 2018, c. 415.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}