{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-586.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-586.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-586.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-586.html"}],"law_id":78391,"edition_id":1,"section_id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","history":"1999, c. 411.","full_text":"On and after January 1, 2001, if any supplier fails to fulfill an obligation, resulting in the failure of retail electric energy to be delivered into the control area serving the supplier&#8217;s retail customer, the entity fulfilling the control area function, or, if applicable, the regional transmission entity or other entity as designated by the Commission, shall be responsible for charging the defaulting supplier for the full cost of replacement energy, including the cost of energy, the cost incurred by others as a result of the default, and the assessment of penalties as may be approved either by the Commission, to the extent not precluded by federal law, or by the Federal Energy Regulatory Commission. The Commission, as part of the rules established under \u00a7 56-587, shall determine the circumstances under which failures to deliver electricity will result in the revocation of the supplier&#8217;s license.","order_by":null,"text":{"0":{"id":280959,"text":"On and after January 1, 2001, if any supplier fails to fulfill an obligation, resulting in the failure of retail electric energy to be delivered into the control area serving the supplier&#8217;s retail customer, the entity fulfilling the control area function, or, if applicable, the regional transmission entity or other entity as designated by the Commission, shall be responsible for charging the defaulting supplier for the full cost of replacement energy, including the cost of energy, the cost incurred by others as a result of the default, and the assessment of penalties as may be approved either by the Commission, to the extent not precluded by federal law, or by the Federal Energy Regulatory Commission. The Commission, as part of the rules established under \u00a7 56-587, shall determine the circumstances under which failures to deliver electricity will result in the revocation of the supplier&#8217;s license.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},"next_section":{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-586\/","history_text":"<p>This law was first created in 1999. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?991+ful+CHAP0411\">411<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":76009,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","order_by":null,"url":"\/56-581\/"}],"refers_to":[{"id":63919,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","order_by":null,"url":"\/56-587\/"}],"permalink":{"id":250743,"object_type":"law","relational_id":78391,"identifier":"56-586","token":"56\/23\/56-586","url":"\/56-586\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-586\/","token":"56\/23\/56-586","dublin_core":{"Title":"Emergency service provider","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-586","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>On and after January 1, 2001, if any <span class=\"dictionary\">supplier<\/span> fails to fulfill an obligation, resulting in the failure of <span class=\"dictionary\">retail electric energy<\/span> to be delivered into the control area serving the <span class=\"dictionary\">supplier<\/span>&#8217;s <span class=\"dictionary\">retail customer<\/span>, the entity fulfilling the control area function, or, if applicable, the regional transmission entity or other entity as designated by the <span class=\"dictionary\">Commission<\/span>, shall be responsible for charging the defaulting <span class=\"dictionary\">supplier<\/span> for the full cost of replacement energy, including the cost of energy, the cost incurred by others as a result of the <span class=\"dictionary\">default<\/span>, and the assessment of penalties as may be approved either by the <span class=\"dictionary\">Commission<\/span>, to the extent not precluded by federal <span class=\"dictionary\">law<\/span>, or by the Federal Energy Regulatory <span class=\"dictionary\">Commission<\/span>. The <span class=\"dictionary\">Commission<\/span>, as part of the rules established under \u00a7&nbsp;<a class=\"law\" title=\"Licensure of retail electric energy suppliers and persons providing other competitive services\" href=\"\/56-587\/\">56-587<\/a>, shall determine the circumstances under which failures to deliver electricity will result in the <span class=\"dictionary\">revocation<\/span> of the <span class=\"dictionary\">supplier<\/span>&#8217;s license.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nEMERGENCY SERVICE PROVIDER (\u00a7 56-586)\n\nOn and after January 1, 2001, if any supplier fails to fulfill an obligation,\nresulting in the failure of retail electric energy to be delivered into the\ncontrol area serving the supplier&#8217;s retail customer, the entity fulfilling\nthe control area function, or, if applicable, the regional transmission entity\nor other entity as designated by the Commission, shall be responsible for\ncharging the defaulting supplier for the full cost of replacement energy,\nincluding the cost of energy, the cost incurred by others as a result of the\ndefault, and the assessment of penalties as may be approved either by the\nCommission, to the extent not precluded by federal law, or by the Federal Energy\nRegulatory Commission. The Commission, as part of the rules established under \u00a7\n56-587, shall determine the circumstances under which failures to deliver\nelectricity will result in the revocation of the supplier&#8217;s license.\n\nHISTORY: 1999, c. 411.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}