{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-594.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-594.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-594.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-594.1.html"}],"law_id":82596,"edition_id":1,"section_id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","history":"2009, c. 746.","full_text":"A\n\nAs used in this section, &#8220;eligible farm&#8221; means an entity that owns or operates facilities within the Commonwealth for the generation of electric energy, which entity is described in subdivision (b)(10) of &#xA7; 56-265.1.B\n\nEligible farms shall be permitted to connect to the electrical grid in order to feed into the grid electricity generated by the eligible farm from its facilities that generate electricity from a waste-to-energy technology.C\n\nThe Commission shall adopt regulations to implement this section pursuant to &#xA7; 56-578.","order_by":null,"text":{"0":{"id":295927,"text":"As used in this section, &#8220;eligible farm&#8221; means an entity that owns or operates facilities within the Commonwealth for the generation of electric energy, which entity is described in subdivision (b)(10) of &#xA7; 56-265.1.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":295928,"text":"Eligible farms shall be permitted to connect to the electrical grid in order to feed into the grid electricity generated by the eligible farm from its facilities that generate electricity from a waste-to-energy technology.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":295929,"text":"The Commission shall adopt regulations to implement this section pursuant to &#xA7; 56-578.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},"next_section":{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-594.1\/","history_text":"<p>This law was first created in 2009. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?091+ful+CHAP0746\">746<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":66769,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","order_by":null,"url":"\/56-578\/"}],"permalink":{"id":250803,"object_type":"law","relational_id":82596,"identifier":"56-594.1","token":"56\/23\/56-594.1","url":"\/56-594.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-594.1\/","token":"56\/23\/56-594.1","dublin_core":{"Title":"Interconnection by farms","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-594.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> As used in this section, &#8220;<span class=\"dictionary\">eligible farm<\/span>&#8221; means an entity that owns or operates facilities within the Commonwealth for the <span class=\"dictionary\">generation of<\/span> electric energy, which entity is described in subdivision (b)(10) of &#xA7; <a class=\"law\" title=\"Definitions\" href=\"\/56-265.1\/\">56-265.1<\/a>. <a id=\"paragraph-295927\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-594.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> <span class=\"dictionary\">Eligible farms<\/span> shall be permitted to connect to the electrical grid in <span class=\"dictionary\">order<\/span> to feed into the grid electricity generated by the <span class=\"dictionary\">eligible farm<\/span> from its facilities that generate electricity from a waste-to-energy technology. <a id=\"paragraph-295928\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-594.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> The <span class=\"dictionary\">Commission<\/span> shall adopt regulations to implement this section pursuant to &#xA7; <a class=\"law\" title=\"Nondiscriminatory access to transmission and distribution system\" href=\"\/56-578\/\">56-578<\/a>. <a id=\"paragraph-295929\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-594.1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nINTERCONNECTION BY FARMS (\u00a7 56-594.1)\n\nA. As used in this section, &#8220;eligible farm&#8221; means an entity that\nowns or operates facilities within the Commonwealth for the generation of\nelectric energy, which entity is described in subdivision (b)(10) of &#xA7;\n56-265.1.\n\nB. Eligible farms shall be permitted to connect to the electrical grid in order\nto feed into the grid electricity generated by the eligible farm from its\nfacilities that generate electricity from a waste-to-energy technology.\n\nC. The Commission shall adopt regulations to implement this section pursuant to\n&#xA7; 56-578.\n\nHISTORY: 2009, c. 746.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}