{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-596.2_1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-596.2_1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-596.2_1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-596.2_1.html"}],"law_id":80361,"edition_id":1,"section_id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","history":"2019, c. 748; 2020, c. 801.","full_text":"A\n\nEach Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of &#xA7; 56-585.1, shall submit a petition for approval to design, implement, and operate a three-year program of energy conservation measures providing incentives to low-income, elderly, and disabled individuals in an amount not to exceed $25 million in the aggregate for the installation of measures that reduce residential heating or cooling costs and enhance the health and safety of residents, including repairs and improvements to home heating or cooling systems and installation of energy-saving measures in the house, such as insulation and air sealing. In developing such incentive program, each utility shall utilize the stakeholder process set forth in &#xA7; 56-596.2. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program shall be deemed to be a part of the $140 million in energy efficiency programs that a Phase I utility is required to develop pursuant to &#xA7; 56-596.2 and a part of the $870 million in energy efficiency programs that a Phase II utility is required to develop pursuant to &#xA7; 56-596.2; provided that no portion of such incentive programs shall be deemed to be a part of the required five percent of such energy conservation measures set aside for low-income, elderly, and disabled individuals.B\n\nFor (i) low-income, elderly, and disabled individuals or (ii) organizations providing residential services to low-income, elderly, and disabled individuals who participate in, or have already participated in, an incentive program, including the incentive program described in subsection A, for the installation of measures that reduce heating or cooling costs at any premises where people reside, each Phase I and Phase II Utility shall submit a petition for approval to design, implement, and operate a separate three-year incentive program, in an amount not to exceed $25 million in the aggregate, to enable the installation of, or access to, equipment to generate electric energy derived from sunlight. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program may include installation of equipment directly on the premises or access to equipment located elsewhere, provided such installation or access reduces the total energy costs for persons described in clause (i) or (ii). Such incentive program shall not be deemed to be a part of the $140 million in energy efficiency programs that a Phase I utility is required to develop pursuant to &#xA7; 56-596.2 nor a part of the $870 million in energy efficiency programs that a Phase II utility is required to develop pursuant to &#xA7; 56-596.2.C\n\nIn developing such incentive programs, each utility shall give consideration to low-income, elderly, and disabled persons residing in housing that a redevelopment and housing authority owns or controls.","order_by":null,"text":{"0":{"id":287847,"text":"Each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of &#xA7; 56-585.1, shall submit a petition for approval to design, implement, and operate a three-year program of energy conservation measures providing incentives to low-income, elderly, and disabled individuals in an amount not to exceed $25 million in the aggregate for the installation of measures that reduce residential heating or cooling costs and enhance the health and safety of residents, including repairs and improvements to home heating or cooling systems and installation of energy-saving measures in the house, such as insulation and air sealing. In developing such incentive program, each utility shall utilize the stakeholder process set forth in &#xA7; 56-596.2. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program shall be deemed to be a part of the $140 million in energy efficiency programs that a Phase I utility is required to develop pursuant to &#xA7; 56-596.2 and a part of the $870 million in energy efficiency programs that a Phase II utility is required to develop pursuant to &#xA7; 56-596.2; provided that no portion of such incentive programs shall be deemed to be a part of the required five percent of such energy conservation measures set aside for low-income, elderly, and disabled individuals.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":287848,"text":"For (i) low-income, elderly, and disabled individuals or (ii) organizations providing residential services to low-income, elderly, and disabled individuals who participate in, or have already participated in, an incentive program, including the incentive program described in subsection A, for the installation of measures that reduce heating or cooling costs at any premises where people reside, each Phase I and Phase II Utility shall submit a petition for approval to design, implement, and operate a separate three-year incentive program, in an amount not to exceed $25 million in the aggregate, to enable the installation of, or access to, equipment to generate electric energy derived from sunlight. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program may include installation of equipment directly on the premises or access to equipment located elsewhere, provided such installation or access reduces the total energy costs for persons described in clause (i) or (ii). Such incentive program shall not be deemed to be a part of the $140 million in energy efficiency programs that a Phase I utility is required to develop pursuant to &#xA7; 56-596.2 nor a part of the $870 million in energy efficiency programs that a Phase II utility is required to develop pursuant to &#xA7; 56-596.2.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":287849,"text":"In developing such incentive programs, each utility shall give consideration to low-income, elderly, and disabled persons residing in housing that a redevelopment and housing authority owns or controls.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},"next_section":{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-596.2:1\/","history_text":"<p>This law was first created in 2019. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?191+ful+CHAP0748\">748<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year. It has been modified 1 time. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. That modification is as follows: in 2020, chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?201+ful+CHAP0801\">801<\/a>.<\/p>","references":false,"refers_to":[{"id":67687,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","order_by":null,"url":"\/56-585.1\/"},{"id":57383,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","order_by":null,"url":"\/56-596.2\/"}],"permalink":{"id":250835,"object_type":"law","relational_id":80361,"identifier":"56-596.2:1","token":"56\/23\/56-596.2_1","url":"\/56-596.2_1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","dublin_core":{"Title":"Incentives for energy conservation measures and solar energy equipment","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-596.2:1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> Each Phase I and Phase II Utility, as such terms are defined in subdivision A 1 of &#xA7; <a class=\"law\" title=\"Generation, distribution, and transmission rates after capped rates terminate or expire\" href=\"\/56-585.1\/\">56-585.1<\/a>, shall submit a <span class=\"dictionary\">petition<\/span> for approval to design, implement, and operate a three-year program of energy conservation measures providing incentives to low-income, elderly, and disabled individuals in an amount not to exceed $25 million in the aggregate for the installation of measures that reduce residential heating or cooling costs and enhance the health and safety of residents, including repairs and improvements to home heating or cooling systems and installation of energy-saving measures in the house, such as insulation and air sealing. In developing such incentive program, each utility shall utilize the stakeholder process set forth in &#xA7; <a class=\"law\" title=\"Energy efficiency policy and programs; financial assistance for low-income customers\" href=\"\/56-596.2\/\">56-596.2<\/a>. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program shall be deemed to be a part of the $140 million in <span class=\"dictionary\">energy efficiency programs<\/span> that a Phase I utility is required to develop pursuant to &#xA7; <a class=\"law\" title=\"Energy efficiency policy and programs; financial assistance for low-income customers\" href=\"\/56-596.2\/\">56-596.2<\/a> and a part of the $870 million in <span class=\"dictionary\">energy efficiency programs<\/span> that a Phase II utility is required to develop pursuant to &#xA7; <a class=\"law\" title=\"Energy efficiency policy and programs; financial assistance for low-income customers\" href=\"\/56-596.2\/\">56-596.2<\/a>; provided that no portion of such incentive programs shall be deemed to be a part of the required five percent of such energy conservation measures set aside for low-income, elderly, and disabled individuals. <a id=\"paragraph-287847\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-596.2_1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> For (i) low-income, elderly, and disabled individuals or (ii) organizations providing residential services to low-income, elderly, and disabled individuals who participate in, or have already participated in, an incentive program, including the incentive program described in subsection A, for the installation of measures that reduce heating or cooling costs at any premises where people reside, each Phase I and Phase II Utility shall submit a <span class=\"dictionary\">petition<\/span> for approval to design, implement, and operate a separate three-year incentive program, in an amount not to exceed $25 million in the aggregate, to enable the installation of, or access to, equipment to generate electric energy derived from sunlight. The utility may provide such incentives directly to customers or to organizations that assist low-income, elderly, and disabled individuals. Such incentive program may include installation of equipment directly on the premises or access to equipment located elsewhere, provided such installation or access reduces the total energy costs for <span class=\"dictionary\">persons<\/span> described in clause (i) or (ii). Such incentive program shall not be deemed to be a part of the $140 million in <span class=\"dictionary\">energy efficiency programs<\/span> that a Phase I utility is required to develop pursuant to &#xA7; <a class=\"law\" title=\"Energy efficiency policy and programs; financial assistance for low-income customers\" href=\"\/56-596.2\/\">56-596.2<\/a> nor a part of the $870 million in <span class=\"dictionary\">energy efficiency programs<\/span> that a Phase II utility is required to develop pursuant to &#xA7; <a class=\"law\" title=\"Energy efficiency policy and programs; financial assistance for low-income customers\" href=\"\/56-596.2\/\">56-596.2<\/a>. <a id=\"paragraph-287848\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-596.2_1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> In developing such incentive programs, each utility shall give consideration to low-income, elderly, and disabled <span class=\"dictionary\">persons<\/span> residing in housing that a redevelopment and housing authority owns or controls. <a id=\"paragraph-287849\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/56-596.2_1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nINCENTIVES FOR ENERGY CONSERVATION MEASURES AND SOLAR ENERGY EQUIPMENT (\u00a7\n56-596.2:1)\n\nA. Each Phase I and Phase II Utility, as such terms are defined in subdivision A\n1 of &#xA7; 56-585.1, shall submit a petition for approval to design, implement,\nand operate a three-year program of energy conservation measures providing\nincentives to low-income, elderly, and disabled individuals in an amount not to\nexceed $25 million in the aggregate for the installation of measures that reduce\nresidential heating or cooling costs and enhance the health and safety of\nresidents, including repairs and improvements to home heating or cooling systems\nand installation of energy-saving measures in the house, such as insulation and\nair sealing. In developing such incentive program, each utility shall utilize\nthe stakeholder process set forth in &#xA7; 56-596.2. The utility may provide\nsuch incentives directly to customers or to organizations that assist\nlow-income, elderly, and disabled individuals. Such incentive program shall be\ndeemed to be a part of the $140 million in energy efficiency programs that a\nPhase I utility is required to develop pursuant to &#xA7; 56-596.2 and a part of\nthe $870 million in energy efficiency programs that a Phase II utility is\nrequired to develop pursuant to &#xA7; 56-596.2; provided that no portion of\nsuch incentive programs shall be deemed to be a part of the required five\npercent of such energy conservation measures set aside for low-income, elderly,\nand disabled individuals.\n\nB. For (i) low-income, elderly, and disabled individuals or (ii) organizations\nproviding residential services to low-income, elderly, and disabled individuals\nwho participate in, or have already participated in, an incentive program,\nincluding the incentive program described in subsection A, for the installation\nof measures that reduce heating or cooling costs at any premises where people\nreside, each Phase I and Phase II Utility shall submit a petition for approval\nto design, implement, and operate a separate three-year incentive program, in an\namount not to exceed $25 million in the aggregate, to enable the installation\nof, or access to, equipment to generate electric energy derived from sunlight.\nThe utility may provide such incentives directly to customers or to\norganizations that assist low-income, elderly, and disabled individuals. Such\nincentive program may include installation of equipment directly on the premises\nor access to equipment located elsewhere, provided such installation or access\nreduces the total energy costs for persons described in clause (i) or (ii). Such\nincentive program shall not be deemed to be a part of the $140 million in energy\nefficiency programs that a Phase I utility is required to develop pursuant to\n&#xA7; 56-596.2 nor a part of the $870 million in energy efficiency programs\nthat a Phase II utility is required to develop pursuant to &#xA7; 56-596.2.\n\nC. In developing such incentive programs, each utility shall give consideration\nto low-income, elderly, and disabled persons residing in housing that a\nredevelopment and housing authority owns or controls.\n\nHISTORY: 2019, c. 748; 2020, c. 801.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}