{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-596.3.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-596.3.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-596.3.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-596.3.html"}],"law_id":71672,"edition_id":1,"section_id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","history":"2018, c. 296.","full_text":"The Commission shall submit a report and make recommendations to the Governor and the General Assembly annually on or before December 1 of each year assessing (i) the reliability of electrical transmission or distribution systems; (ii) the integration of utility or customer owned renewable electric generation resources with the utility&#8217;s electric distribution grid; (iii) the level of investment in generation, transmission, or distribution of electricity; (iv) the need for additional generation of electricity during times of peak demand; and (v) distribution system hardening projects and enhanced physical security measures. The Commission shall submit copies of such annual reports to the Chairman of the House Committee on Labor and Commerce, the Chairman of the Senate Committee on Commerce and Labor and the Chairman of the Commission on Electric Utility Regulation.","order_by":null,"text":{"0":{"id":258270,"text":"The Commission shall submit a report and make recommendations to the Governor and the General Assembly annually on or before December 1 of each year assessing (i) the reliability of electrical transmission or distribution systems; (ii) the integration of utility or customer owned renewable electric generation resources with the utility&#8217;s electric distribution grid; (iii) the level of investment in generation, transmission, or distribution of electricity; (iv) the need for additional generation of electricity during times of peak demand; and (v) distribution system hardening projects and enhanced physical security measures. The Commission shall submit copies of such annual reports to the Chairman of the House Committee on Labor and Commerce, the Chairman of the Senate Committee on Commerce and Labor and the Chairman of the Commission on Electric Utility Regulation.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":13084,"edition_id":1,"name":"Virginia Electric Utility Regulation Act","identifier":"23","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:15","date_modified":"2026-06-26 03:44:15","permalink":{"id":250597,"object_type":"structure","relational_id":13084,"identifier":"23","token":"56\/23","url":"\/56\/23\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":62210,"structure_id":13084,"section_number":"56-576","catch_line":"Definitions","url":"\/56-576\/","token":"56\/23\/56-576","metadata":false},{"id":79838,"structure_id":13084,"section_number":"56-577","catch_line":"Schedule for transition to retail competition; Commission authority; exemptions; pilot programs","url":"\/56-577\/","token":"56\/23\/56-577","metadata":false},{"id":69790,"structure_id":13084,"section_number":"56-577.1","catch_line":"Electric utilities; retail competition; pilot program","url":"\/56-577.1\/","token":"56\/23\/56-577.1","metadata":false},{"id":66769,"structure_id":13084,"section_number":"56-578","catch_line":"Nondiscriminatory access to transmission and distribution system","url":"\/56-578\/","token":"56\/23\/56-578","metadata":false},{"id":76158,"structure_id":13084,"section_number":"56-579","catch_line":"Regional transmission entities","url":"\/56-579\/","token":"56\/23\/56-579","metadata":false},{"id":77551,"structure_id":13084,"section_number":"56-580","catch_line":"Transmission and distribution of electric energy","url":"\/56-580\/","token":"56\/23\/56-580","metadata":false},{"id":76009,"structure_id":13084,"section_number":"56-581","catch_line":"Regulation of rates subject to Commission's jurisdiction","url":"\/56-581\/","token":"56\/23\/56-581","metadata":false},{"id":70038,"structure_id":13084,"section_number":"56-581.1","catch_line":"Repealed","url":"\/56-581.1\/","token":"56\/23\/56-581.1","metadata":false},{"id":75586,"structure_id":13084,"section_number":"56-582","catch_line":"Rate caps","url":"\/56-582\/","token":"56\/23\/56-582","metadata":false},{"id":60164,"structure_id":13084,"section_number":"56-583","catch_line":"Repealed","url":"\/56-583\/","token":"56\/23\/56-583","metadata":false},{"id":60319,"structure_id":13084,"section_number":"56-584","catch_line":"Stranded costs","url":"\/56-584\/","token":"56\/23\/56-584","metadata":false},{"id":66252,"structure_id":13084,"section_number":"56-585","catch_line":"Default service","url":"\/56-585\/","token":"56\/23\/56-585","metadata":false},{"id":67687,"structure_id":13084,"section_number":"56-585.1","catch_line":"Generation, distribution, and transmission rates after capped rates terminate or expire","url":"\/56-585.1\/","token":"56\/23\/56-585.1","metadata":false},{"id":75688,"structure_id":13084,"section_number":"56-585.1:1","catch_line":"Transitional Rate Period: review of rates, terms and conditions for utility generation facilities","url":"\/56-585.1_1\/","token":"56\/23\/56-585.1_1","metadata":false},{"id":86211,"structure_id":13084,"section_number":"56-585.1:10","catch_line":"Program for electric infrastructure serving business parks","url":"\/56-585.1_10\/","token":"56\/23\/56-585.1_10","metadata":false},{"id":82389,"structure_id":13084,"section_number":"56-585.1:11","catch_line":"Development of offshore wind capacity","url":"\/56-585.1_11\/","token":"56\/23\/56-585.1_11","metadata":false},{"id":82816,"structure_id":13084,"section_number":"56-585.1:12","catch_line":"Multi-family shared solar program","url":"\/56-585.1_12\/","token":"56\/23\/56-585.1_12","metadata":false},{"id":84410,"structure_id":13084,"section_number":"56-585.1:13","catch_line":"Recovery of costs associated with investment in transportation electrification","url":"\/56-585.1_13\/","token":"56\/23\/56-585.1_13","metadata":false},{"id":68074,"structure_id":13084,"section_number":"56-585.1:14","catch_line":"(Effective until December 31, 2029) Recovery of development costs associated with small modular reactor","url":"\/56-585.1_14\/","token":"56\/23\/56-585.1_14","metadata":false},{"id":86919,"structure_id":13084,"section_number":"56-585.1:15","catch_line":"(Effective until July 1, 2034) Recovery of development costs associated with small modular nuclear facility","url":"\/56-585.1_15\/","token":"56\/23\/56-585.1_15","metadata":false},{"id":54669,"structure_id":13084,"section_number":"56-585.1:16","catch_line":"Virtual power plant pilot program","url":"\/56-585.1_16\/","token":"56\/23\/56-585.1_16","metadata":false},{"id":68837,"structure_id":13084,"section_number":"56-585.1:2","catch_line":"Pilot program for energy assistance and weatherization","url":"\/56-585.1_2\/","token":"56\/23\/56-585.1_2","metadata":false},{"id":78934,"structure_id":13084,"section_number":"56-585.1:3","catch_line":"Pilot programs for community solar development","url":"\/56-585.1_3\/","token":"56\/23\/56-585.1_3","metadata":false},{"id":86978,"structure_id":13084,"section_number":"56-585.1:4","catch_line":"Development of solar and wind generation and energy storage capacity in the Commonwealth","url":"\/56-585.1_4\/","token":"56\/23\/56-585.1_4","metadata":false},{"id":75808,"structure_id":13084,"section_number":"56-585.1:5","catch_line":"Pilot program for underground transmission lines","url":"\/56-585.1_5\/","token":"56\/23\/56-585.1_5","metadata":false},{"id":73594,"structure_id":13084,"section_number":"56-585.1:6","catch_line":"Pilot Programs to deploy electric power storage batteries","url":"\/56-585.1_6\/","token":"56\/23\/56-585.1_6","metadata":false},{"id":73105,"structure_id":13084,"section_number":"56-585.1:7","catch_line":"Pilot program for electric generation by public schools","url":"\/56-585.1_7\/","token":"56\/23\/56-585.1_7","metadata":false},{"id":83744,"structure_id":13084,"section_number":"56-585.1:8","catch_line":"Pilot program for municipal net energy metering","url":"\/56-585.1_8\/","token":"56\/23\/56-585.1_8","metadata":false},{"id":78790,"structure_id":13084,"section_number":"56-585.1:9","catch_line":"Provision of broadband capacity to unserved areas of the Commonwealth","url":"\/56-585.1_9\/","token":"56\/23\/56-585.1_9","metadata":false},{"id":56958,"structure_id":13084,"section_number":"56-585.2","catch_line":"Repealed","url":"\/56-585.2\/","token":"56\/23\/56-585.2","metadata":false},{"id":87343,"structure_id":13084,"section_number":"56-585.3","catch_line":"Regulation of cooperative rates after rate caps","url":"\/56-585.3\/","token":"56\/23\/56-585.3","metadata":false},{"id":80324,"structure_id":13084,"section_number":"56-585.4","catch_line":"Net energy metering transition provisions for electric cooperatives","url":"\/56-585.4\/","token":"56\/23\/56-585.4","metadata":false},{"id":81665,"structure_id":13084,"section_number":"56-585.5","catch_line":"Generation of electricity from renewable and zero carbon sources","url":"\/56-585.5\/","token":"56\/23\/56-585.5","metadata":false},{"id":57139,"structure_id":13084,"section_number":"56-585.6","catch_line":"Universal service fee; Percentage of Income Payment Program and Fund","url":"\/56-585.6\/","token":"56\/23\/56-585.6","metadata":false},{"id":63065,"structure_id":13084,"section_number":"56-585.7","catch_line":"On-bill tariff program; electric cooperatives","url":"\/56-585.7\/","token":"56\/23\/56-585.7","metadata":false},{"id":84206,"structure_id":13084,"section_number":"56-585.8","catch_line":"Biennial rate reviews","url":"\/56-585.8\/","token":"56\/23\/56-585.8","metadata":false},{"id":78391,"structure_id":13084,"section_number":"56-586","catch_line":"Emergency service provider","url":"\/56-586\/","token":"56\/23\/56-586","metadata":false},{"id":60930,"structure_id":13084,"section_number":"56-586.1","catch_line":"Electric energy emergencies","url":"\/56-586.1\/","token":"56\/23\/56-586.1","metadata":false},{"id":63919,"structure_id":13084,"section_number":"56-587","catch_line":"Licensure of retail electric energy suppliers and persons providing other competitive services","url":"\/56-587\/","token":"56\/23\/56-587","metadata":false},{"id":69085,"structure_id":13084,"section_number":"56-588","catch_line":"Licensing of aggregators","url":"\/56-588\/","token":"56\/23\/56-588","metadata":false},{"id":57502,"structure_id":13084,"section_number":"56-589","catch_line":"Municipal and state aggregation","url":"\/56-589\/","token":"56\/23\/56-589","metadata":false},{"id":59256,"structure_id":13084,"section_number":"56-589.1","catch_line":"Energy generation by public school buildings and facilities","url":"\/56-589.1\/","token":"56\/23\/56-589.1","metadata":false},{"id":86105,"structure_id":13084,"section_number":"56-590","catch_line":"Divestiture, functional separation and other corporate relationships","url":"\/56-590\/","token":"56\/23\/56-590","metadata":false},{"id":67461,"structure_id":13084,"section_number":"56-591","catch_line":"Application of antitrust laws","url":"\/56-591\/","token":"56\/23\/56-591","metadata":false},{"id":85339,"structure_id":13084,"section_number":"56-592","catch_line":"Consumer education and marketing practices","url":"\/56-592\/","token":"56\/23\/56-592","metadata":false},{"id":75703,"structure_id":13084,"section_number":"56-592.1","catch_line":"Consumer education program; scope and funding","url":"\/56-592.1\/","token":"56\/23\/56-592.1","metadata":false},{"id":77066,"structure_id":13084,"section_number":"56-593","catch_line":"Retail customers' private right of action; marketing practices","url":"\/56-593\/","token":"56\/23\/56-593","metadata":false},{"id":76060,"structure_id":13084,"section_number":"56-594","catch_line":"Net energy metering provisions","url":"\/56-594\/","token":"56\/23\/56-594","metadata":false},{"id":74615,"structure_id":13084,"section_number":"56-594.01","catch_line":"Net energy metering provisions for electric cooperative service territories","url":"\/56-594.01\/","token":"56\/23\/56-594.01","metadata":false},{"id":56626,"structure_id":13084,"section_number":"56-594.01:1","catch_line":"Local facilities usage charges; electric cooperatives","url":"\/56-594.01_1\/","token":"56\/23\/56-594.01_1","metadata":false},{"id":66346,"structure_id":13084,"section_number":"56-594.02","catch_line":"Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs","url":"\/56-594.02\/","token":"56\/23\/56-594.02","metadata":false},{"id":82596,"structure_id":13084,"section_number":"56-594.1","catch_line":"Interconnection by farms","url":"\/56-594.1\/","token":"56\/23\/56-594.1","metadata":false},{"id":78424,"structure_id":13084,"section_number":"56-594.2","catch_line":"Small agricultural generators","url":"\/56-594.2\/","token":"56\/23\/56-594.2","metadata":false},{"id":54132,"structure_id":13084,"section_number":"56-594.3","catch_line":"Shared solar programs; Phase II Utility","url":"\/56-594.3\/","token":"56\/23\/56-594.3","metadata":false},{"id":80234,"structure_id":13084,"section_number":"56-594.4","catch_line":"Shared solar programs; Phase I Utility","url":"\/56-594.4\/","token":"56\/23\/56-594.4","metadata":false},{"id":77419,"structure_id":13084,"section_number":"56-595","catch_line":"Repealed","url":"\/56-595\/","token":"56\/23\/56-595","metadata":false},{"id":69517,"structure_id":13084,"section_number":"56-596","catch_line":"Consideration of economic development; report","url":"\/56-596\/","token":"56\/23\/56-596","metadata":false},{"id":82462,"structure_id":13084,"section_number":"56-596.1","catch_line":"New generating facilities utilizing energy derived from sunlight and from wind; report","url":"\/56-596.1\/","token":"56\/23\/56-596.1","metadata":false},{"id":57383,"structure_id":13084,"section_number":"56-596.2","catch_line":"Energy efficiency policy and programs; financial assistance for low-income customers","url":"\/56-596.2\/","token":"56\/23\/56-596.2","metadata":false},{"id":80361,"structure_id":13084,"section_number":"56-596.2:1","catch_line":"Incentives for energy conservation measures and solar energy equipment","url":"\/56-596.2_1\/","token":"56\/23\/56-596.2_1","metadata":false},{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},{"id":71672,"structure_id":13084,"section_number":"56-596.3","catch_line":"Electric generation, transmission, and distribution; report","url":"\/56-596.3\/","token":"56\/23\/56-596.3","metadata":false},{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},{"id":75595,"structure_id":13084,"section_number":"56-596.5","catch_line":"Rate increases in certain months prohibited; Phase I Utility","url":"\/56-596.5\/","token":"56\/23\/56-596.5","metadata":false},{"id":80765,"structure_id":13084,"section_number":"56-596.6","catch_line":"Distribution cost sharing program","url":"\/56-596.6\/","token":"56\/23\/56-596.6","metadata":false}],"previous_section":{"id":70146,"structure_id":13084,"section_number":"56-596.2:2","catch_line":"(Expires January 1, 2031) Energy efficiency savings targets for certain customers","url":"\/56-596.2_2\/","token":"56\/23\/56-596.2_2","metadata":false},"next_section":{"id":54473,"structure_id":13084,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","url":"\/56-596.4\/","token":"56\/23\/56-596.4","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-596.3\/","history_text":"<p>This law was first created in 2018. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?181+ful+CHAP0296\">296<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":[{"id":54473,"section_number":"56-596.4","catch_line":"Electric utilities; local reliability data","order_by":null,"url":"\/56-596.4\/"}],"refers_to":false,"permalink":{"id":250843,"object_type":"law","relational_id":71672,"identifier":"56-596.3","token":"56\/23\/56-596.3","url":"\/56-596.3\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-596.3\/","token":"56\/23\/56-596.3","dublin_core":{"Title":"Electric generation, transmission, and distribution; report","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-596.3","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The <span class=\"dictionary\">Commission<\/span> shall submit a report and make recommendations to the Governor and the General Assembly annually on or before December 1 of each year assessing (i) the reliability of electrical transmission or distribution systems; (ii) the integration of utility or customer owned renewable electric generation resources with the utility&#8217;s electric distribution grid; (iii) the level of investment in generation, transmission, or <span class=\"dictionary\">distribution of<\/span> electricity; (iv) the need for additional <span class=\"dictionary\">generation of<\/span> electricity during times of peak demand; and (v) distribution system hardening projects and enhanced physical security measures. The <span class=\"dictionary\">Commission<\/span> shall submit copies of such annual reports to the Chairman of the House Committee on Labor and Commerce, the Chairman of the Senate Committee on Commerce and Labor and the Chairman of the <span class=\"dictionary\">Commission<\/span> on <span class=\"dictionary\">Electric Utility<\/span> Regulation.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nELECTRIC GENERATION, TRANSMISSION, AND DISTRIBUTION; REPORT (\u00a7 56-596.3)\n\nThe Commission shall submit a report and make recommendations to the Governor\nand the General Assembly annually on or before December 1 of each year assessing\n(i) the reliability of electrical transmission or distribution systems; (ii) the\nintegration of utility or customer owned renewable electric generation resources\nwith the utility&#8217;s electric distribution grid; (iii) the level of\ninvestment in generation, transmission, or distribution of electricity; (iv) the\nneed for additional generation of electricity during times of peak demand; and\n(v) distribution system hardening projects and enhanced physical security\nmeasures. The Commission shall submit copies of such annual reports to the\nChairman of the House Committee on Labor and Commerce, the Chairman of the\nSenate Committee on Commerce and Labor and the Chairman of the Commission on\nElectric Utility Regulation.\n\nHISTORY: 2018, c. 296.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}