{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/56-621.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/56-621.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/56-621.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/56-621.html"}],"law_id":86269,"edition_id":1,"section_id":86269,"structure_id":13340,"section_number":"56-621","catch_line":" Cost to Commonwealth in connection with inspection and coordination of construction of line to be paid by renewable generator","history":"2009, c. 807, \u00a7 67-1107; 2021, Sp. Sess. I, c. 387.","full_text":"The actual costs and expenses of the Commonwealth for the inspection or coordination of the construction or installation of any of the distribution facilities of the renewable generator, under the provisions of this chapter, under any permit of the Commonwealth Transportation Board shall be borne by the renewable generator. The sum of the payment required by this section shall be paid to the Department of Transportation within 30 days from the receipt of a progress or final bill from the Department of Transportation.","order_by":null,"text":{"0":{"id":308979,"text":"The actual costs and expenses of the Commonwealth for the inspection or coordination of the construction or installation of any of the distribution facilities of the renewable generator, under the provisions of this chapter, under any permit of the Commonwealth Transportation Board shall be borne by the renewable generator. The sum of the payment required by this section shall be paid to the Department of Transportation within 30 days from the receipt of a progress or final bill from the Department of Transportation.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":13340,"edition_id":1,"name":"Renewable Energy Co-Location of Distribution Facilities","identifier":"29","label":"chapter","depth":2,"order_by":1,"parent_id":12881,"metadata":{},"date_created":"2026-06-26 03:44:40","date_modified":"2026-06-26 03:44:40","permalink":{"id":250937,"object_type":"structure","relational_id":13340,"identifier":"29","token":"56\/29","url":"\/56\/29\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12881,"edition_id":1,"name":"Public Service Companies","identifier":"56","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:43:58","date_modified":"2026-06-26 03:43:58","permalink":{"id":248473,"object_type":"structure","relational_id":12881,"identifier":"56","token":"56","url":"\/56\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":57707,"structure_id":13340,"section_number":"56-614","catch_line":" Definitions","url":"\/56-614\/","token":"56\/29\/56-614","metadata":false},{"id":79640,"structure_id":13340,"section_number":"56-615","catch_line":" Right to occupy rights-of-way; location of rights-of-way","url":"\/56-615\/","token":"56\/29\/56-615","metadata":false},{"id":54322,"structure_id":13340,"section_number":"56-616","catch_line":" Occupation of property of certain localities; imposition of terms and conditions as to use of property","url":"\/56-616\/","token":"56\/29\/56-616","metadata":false},{"id":57231,"structure_id":13340,"section_number":"56-617","catch_line":" Public rights-of-way use fee","url":"\/56-617\/","token":"56\/29\/56-617","metadata":false},{"id":73796,"structure_id":13340,"section_number":"56-618","catch_line":" Reimbursement for relocation costs","url":"\/56-618\/","token":"56\/29\/56-618","metadata":false},{"id":54677,"structure_id":13340,"section_number":"56-619","catch_line":" Relocation of lines or works of renewable generator acquired by Commonwealth Transportation Board","url":"\/56-619\/","token":"56\/29\/56-619","metadata":false},{"id":83122,"structure_id":13340,"section_number":"56-620","catch_line":" How consent of appropriate authorities obtained; terms of use","url":"\/56-620\/","token":"56\/29\/56-620","metadata":false},{"id":86269,"structure_id":13340,"section_number":"56-621","catch_line":" Cost to Commonwealth in connection with inspection and coordination of construction of line to be paid by renewable generator","url":"\/56-621\/","token":"56\/29\/56-621","metadata":false},{"id":83203,"structure_id":13340,"section_number":"56-622","catch_line":" Renewable generator may contract for right-of-way","url":"\/56-622\/","token":"56\/29\/56-622","metadata":false},{"id":78392,"structure_id":13340,"section_number":"56-623","catch_line":" Construction of transmission facilities","url":"\/56-623\/","token":"56\/29\/56-623","metadata":false},{"id":77988,"structure_id":13340,"section_number":"56-624","catch_line":" Restoring condition of ground","url":"\/56-624\/","token":"56\/29\/56-624","metadata":false}],"previous_section":{"id":83122,"structure_id":13340,"section_number":"56-620","catch_line":" How consent of appropriate authorities obtained; terms of use","url":"\/56-620\/","token":"56\/29\/56-620","metadata":false},"next_section":{"id":83203,"structure_id":13340,"section_number":"56-622","catch_line":" Renewable generator may contract for right-of-way","url":"\/56-622\/","token":"56\/29\/56-622","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/56-621\/","history_text":"<p>This law was first created in 2009. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?091+ful+CHAP0807\">807<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":false,"permalink":{"id":250967,"object_type":"law","relational_id":86269,"identifier":"56-621","token":"56\/29\/56-621","url":"\/56-621\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/56-621\/","token":"56\/29\/56-621","dublin_core":{"Title":" Cost to Commonwealth in connection with inspection and coordination of construction of line to be paid by renewable generator","Type":"Text","Format":"text\/html","Identifier":"\u00a7 56-621","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The actual costs and expenses of the Commonwealth for the inspection or coordination of the construction or installation of any of the <span class=\"dictionary\">distribution facilities<\/span> of the <span class=\"dictionary\">renewable generator<\/span>, under the provisions of this chapter, under any permit of the Commonwealth Transportation Board shall be borne by the <span class=\"dictionary\">renewable generator<\/span>. The sum of the payment required by this section shall be paid to the Department of Transportation within 30 days from the receipt of a progress or final bill from the Department of Transportation.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\n COST TO COMMONWEALTH IN CONNECTION WITH INSPECTION AND COORDINATION OF\nCONSTRUCTION OF LINE TO BE PAID BY RENEWABLE GENERATOR (\u00a7 56-621)\n\nThe actual costs and expenses of the Commonwealth for the inspection or\ncoordination of the construction or installation of any of the distribution\nfacilities of the renewable generator, under the provisions of this chapter,\nunder any permit of the Commonwealth Transportation Board shall be borne by the\nrenewable generator. The sum of the payment required by this section shall be\npaid to the Department of Transportation within 30 days from the receipt of a\nprogress or final bill from the Department of Transportation.\n\nHISTORY: 2009, c. 807, \u00a7 67-1107; 2021, Sp. Sess. I, c. 387.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}