{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/62.1-275.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/62.1-275.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/62.1-275.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/62.1-275.html"}],"law_id":86087,"edition_id":1,"section_id":86087,"structure_id":16555,"section_number":"62.1-275","catch_line":"Cessation of injection","history":"2019, cc. 54, 58.","full_text":"A\n\nHRSD shall operate and monitor the SWIFT Project advanced treatment process and recharge operations in accordance with any applicable permit or authorization issued by the U.S. Environmental Protection Agency at all times, including during the cessation of injection and the implementation of other required measures, when applicable, in accordance with the terms and conditions of the permitted contingency plan.B\n\nIf HRSD fails to comply with the requirements of any applicable permit or authorization issued by the U.S. Environmental Protection Agency, the State Water Control Board may issue to HRSD a special order or emergency special order pursuant to subdivisions (8a) and (8b) of &#xA7; 62.1-44.15, or the State Health Commissioner may issue to HRSD an emergency order pursuant to &#xA7; 32.1-13 or 32.1-175, directing HRSD to cease injections or make necessary corrections to the SWIFT Project&#8217;s advanced treatment processes or recharge operations. This subsection shall not be construed to prohibit or limit the Department, the State Water Control Board, or the State Health Commissioner from taking any lawful action related to the SWIFT Project.","order_by":null,"text":{"0":{"id":308230,"text":"HRSD shall operate and monitor the SWIFT Project advanced treatment process and recharge operations in accordance with any applicable permit or authorization issued by the U.S. Environmental Protection Agency at all times, including during the cessation of injection and the implementation of other required measures, when applicable, in accordance with the terms and conditions of the permitted contingency plan.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":308231,"text":"If HRSD fails to comply with the requirements of any applicable permit or authorization issued by the U.S. Environmental Protection Agency, the State Water Control Board may issue to HRSD a special order or emergency special order pursuant to subdivisions (8a) and (8b) of &#xA7; 62.1-44.15, or the State Health Commissioner may issue to HRSD an emergency order pursuant to &#xA7; 32.1-13 or 32.1-175, directing HRSD to cease injections or make necessary corrections to the SWIFT Project&#8217;s advanced treatment processes or recharge operations. This subsection shall not be construed to prohibit or limit the Department, the State Water Control Board, or the State Health Commissioner from taking any lawful action related to the SWIFT Project.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A"}},"ancestry":[{"id":16555,"edition_id":1,"name":"Potomac Aquifer Recharge Monitoring","identifier":"26","label":"chapter","depth":2,"order_by":1,"parent_id":12909,"metadata":{},"date_created":"2026-06-26 04:23:57","date_modified":"2026-06-26 04:23:57","permalink":{"id":269141,"object_type":"structure","relational_id":16555,"identifier":"26","token":"62.1\/26","url":"\/62.1\/26\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12909,"edition_id":1,"name":"Waters of the State, Ports and Harbors","identifier":"62.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:44:00","date_modified":"2026-06-26 03:44:00","permalink":{"id":268199,"object_type":"structure","relational_id":12909,"identifier":"62.1","token":"62.1","url":"\/62.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":71109,"structure_id":16555,"section_number":"62.1-271","catch_line":"Definitions","url":"\/62.1-271\/","token":"62.1\/26\/62.1-271","metadata":false},{"id":83152,"structure_id":16555,"section_number":"62.1-272","catch_line":"Potomac Aquifer Recharge Oversight Committee","url":"\/62.1-272\/","token":"62.1\/26\/62.1-272","metadata":false},{"id":87444,"structure_id":16555,"section_number":"62.1-273","catch_line":"Committee duties and functions","url":"\/62.1-273\/","token":"62.1\/26\/62.1-273","metadata":false},{"id":87125,"structure_id":16555,"section_number":"62.1-274","catch_line":"Potomac Aquifer Recharge Monitoring Laboratory","url":"\/62.1-274\/","token":"62.1\/26\/62.1-274","metadata":false},{"id":86087,"structure_id":16555,"section_number":"62.1-275","catch_line":"Cessation of injection","url":"\/62.1-275\/","token":"62.1\/26\/62.1-275","metadata":false}],"previous_section":{"id":87125,"structure_id":16555,"section_number":"62.1-274","catch_line":"Potomac Aquifer Recharge Monitoring Laboratory","url":"\/62.1-274\/","token":"62.1\/26\/62.1-274","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/62.1-275\/","history_text":"<p>This law was first created in 2019. The record of its establishment is cataloged in chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?191+ful+CHAP0054\">54<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?191+ful+CHAP0058\">58<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":64338,"section_number":"32.1-13","catch_line":"Emergency orders and regulations","order_by":null,"url":"\/32.1-13\/"},{"id":86295,"section_number":"32.1-175","catch_line":"Emergency orders; appeal","order_by":null,"url":"\/32.1-175\/"},{"id":56006,"section_number":"62.1-44.15","catch_line":"Powers and duties; civil penalties","order_by":null,"url":"\/62.1-44.15\/"}],"permalink":{"id":269159,"object_type":"law","relational_id":86087,"identifier":"62.1-275","token":"62.1\/26\/62.1-275","url":"\/62.1-275\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/62.1-275\/","token":"62.1\/26\/62.1-275","dublin_core":{"Title":"Cessation of injection","Type":"Text","Format":"text\/html","Identifier":"\u00a7 62.1-275","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> <span class=\"dictionary\">HRSD<\/span> shall operate and monitor the <span class=\"dictionary\">SWIFT Project<\/span> advanced treatment process and recharge operations in accordance with any applicable permit or authorization issued by the U.S. Environmental Protection Agency at all times, including during the cessation of injection and the implementation of other required measures, when applicable, in accordance with the terms and conditions of the permitted contingency plan. <a id=\"paragraph-308230\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/62.1-275\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> If <span class=\"dictionary\">HRSD<\/span> fails to comply with the requirements of any applicable permit or authorization issued by the U.S. Environmental Protection Agency, the State Water Control Board may <span class=\"dictionary\">issue<\/span> to <span class=\"dictionary\">HRSD<\/span> a special <span class=\"dictionary\">order<\/span> or emergency special <span class=\"dictionary\">order<\/span> pursuant to subdivisions (8a) and (8b) of &#xA7; <a class=\"law\" title=\"Powers and duties; civil penalties\" href=\"\/62.1-44.15\/\">62.1-44.15<\/a>, or the State Health Commissioner may <span class=\"dictionary\">issue<\/span> to <span class=\"dictionary\">HRSD<\/span> an emergency <span class=\"dictionary\">order<\/span> pursuant to &#xA7; <a class=\"law\" title=\"Emergency orders and regulations\" href=\"\/32.1-13\/\">32.1-13<\/a> or <a class=\"law\" title=\"Emergency orders; appeal\" href=\"\/32.1-175\/\">32.1-175<\/a>, directing <span class=\"dictionary\">HRSD<\/span> to cease injections or make necessary corrections to the <span class=\"dictionary\">SWIFT Project<\/span>&#8217;s advanced treatment processes or recharge operations. This subsection shall not be construed to prohibit or limit the <span class=\"dictionary\">Department<\/span>, the State Water Control Board, or the State Health Commissioner from taking any lawful action related to the <span class=\"dictionary\">SWIFT Project<\/span>. <a id=\"paragraph-308231\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/62.1-275\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nCESSATION OF INJECTION (\u00a7 62.1-275)\n\nA. HRSD shall operate and monitor the SWIFT Project advanced treatment process\nand recharge operations in accordance with any applicable permit or\nauthorization issued by the U.S. Environmental Protection Agency at all times,\nincluding during the cessation of injection and the implementation of other\nrequired measures, when applicable, in accordance with the terms and conditions\nof the permitted contingency plan.\n\nB. If HRSD fails to comply with the requirements of any applicable permit or\nauthorization issued by the U.S. Environmental Protection Agency, the State\nWater Control Board may issue to HRSD a special order or emergency special order\npursuant to subdivisions (8a) and (8b) of &#xA7; 62.1-44.15, or the State Health\nCommissioner may issue to HRSD an emergency order pursuant to &#xA7; 32.1-13 or\n32.1-175, directing HRSD to cease injections or make necessary corrections to\nthe SWIFT Project&#8217;s advanced treatment processes or recharge operations.\nThis subsection shall not be construed to prohibit or limit the Department, the\nState Water Control Board, or the State Health Commissioner from taking any\nlawful action related to the SWIFT Project.\n\nHISTORY: 2019, cc. 54, 58.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}