{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/62.1-44.15_26.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/62.1-44.15_26.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/62.1-44.15_26.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/62.1-44.15_26.1.html"}],"law_id":86687,"edition_id":1,"section_id":86687,"structure_id":13470,"section_number":"62.1-44.15:26.1","catch_line":"Termination of Construction General Permit coverage","history":"2018, c. 630.","full_text":"A\n\nA VSMP authority shall recommend that the Department of Environmental Quality terminate coverage under a General Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) within 60 days of receiving a complete notice of termination from the operator of the construction activity.B\n\nCoverage under a Construction General Permit shall be deemed to be terminated 90 days after the receipt by the VSMP authority of a complete notice of termination from the operator of the construction activity.C\n\nIf a VSMP authority receives a notice of termination of a Construction General Permit that it determines to be incomplete, the VSMP authority shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice.","order_by":null,"text":{"0":{"id":310454,"text":"A VSMP authority shall recommend that the Department of Environmental Quality terminate coverage under a General Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) within 60 days of receiving a complete notice of termination from the operator of the construction activity.","type":"section","prefixes":["A"],"prefix":"A","entire_prefix":"A","prefix_anchor":"A","level":1,"next_prefix":"B"},"1":{"id":310455,"text":"Coverage under a Construction General Permit shall be deemed to be terminated 90 days after the receipt by the VSMP authority of a complete notice of termination from the operator of the construction activity.","type":"section","prefixes":["B"],"prefix":"B","entire_prefix":"B","prefix_anchor":"B","level":1,"prior_prefix":"A","next_prefix":"C"},"2":{"id":310456,"text":"If a VSMP authority receives a notice of termination of a Construction General Permit that it determines to be incomplete, the VSMP authority shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice.","type":"section","prefixes":["C"],"prefix":"C","entire_prefix":"C","prefix_anchor":"C","level":1,"prior_prefix":"B"}},"ancestry":[{"id":13470,"edition_id":1,"name":"Virginia Erosion and Stormwater Management Act (VESMA)","identifier":"2.3","label":"article","depth":3,"order_by":1,"parent_id":13014,"metadata":{},"date_created":"2026-06-26 03:44:57","date_modified":"2026-06-26 03:44:57","permalink":{"id":269481,"object_type":"structure","relational_id":13470,"identifier":"2.3","token":"62.1\/3.1\/2.3","url":"\/62.1\/3.1\/2.3\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13014,"edition_id":1,"name":"State Water Control Law","identifier":"3.1","label":"chapter","depth":2,"order_by":1,"parent_id":12909,"metadata":{},"date_created":"2026-06-26 03:44:08","date_modified":"2026-06-26 03:44:08","permalink":{"id":269169,"object_type":"structure","relational_id":13014,"identifier":"3.1","token":"62.1\/3.1","url":"\/62.1\/3.1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12909,"edition_id":1,"name":"Waters of the State, Ports and Harbors","identifier":"62.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:44:00","date_modified":"2026-06-26 03:44:00","permalink":{"id":268199,"object_type":"structure","relational_id":12909,"identifier":"62.1","token":"62.1","url":"\/62.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":71282,"structure_id":13470,"section_number":"62.1-44.15:24","catch_line":"Definitions","url":"\/62.1-44.15_24\/","token":"62.1\/3.1\/2.3\/62.1-44.15_24","metadata":false},{"id":75035,"structure_id":13470,"section_number":"62.1-44.15:25","catch_line":"Further powers and duties of the State Water Control Board","url":"\/62.1-44.15_25\/","token":"62.1\/3.1\/2.3\/62.1-44.15_25","metadata":false},{"id":60262,"structure_id":13470,"section_number":"62.1-44.15:25.1","catch_line":"Additional local authority","url":"\/62.1-44.15_25.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_25.1","metadata":false},{"id":62390,"structure_id":13470,"section_number":"62.1-44.15:26","catch_line":"Repealed","url":"\/62.1-44.15_26\/","token":"62.1\/3.1\/2.3\/62.1-44.15_26","metadata":false},{"id":86687,"structure_id":13470,"section_number":"62.1-44.15:26.1","catch_line":"Termination of Construction General Permit coverage","url":"\/62.1-44.15_26.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_26.1","metadata":false},{"id":81987,"structure_id":13470,"section_number":"62.1-44.15:27","catch_line":"Virginia Programs for Erosion Control and Stormwater Management","url":"\/62.1-44.15_27\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27","metadata":false},{"id":78889,"structure_id":13470,"section_number":"62.1-44.15:27.1","catch_line":"Virginia Stormwater Management Programs administered by the Board","url":"\/62.1-44.15_27.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27.1","metadata":false},{"id":75881,"structure_id":13470,"section_number":"62.1-44.15:27.2","catch_line":"Rural Tidewater localities; water quantity technical criteria; tiered approach","url":"\/62.1-44.15_27.2\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27.2","metadata":false},{"id":61469,"structure_id":13470,"section_number":"62.1-44.15:27.3","catch_line":"Acceptance of signed and sealed plan in lieu of local plan review","url":"\/62.1-44.15_27.3\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27.3","metadata":false},{"id":77656,"structure_id":13470,"section_number":"62.1-44.15:27.4","catch_line":"Department acceptance of plans in lieu of plan review","url":"\/62.1-44.15_27.4\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27.4","metadata":false},{"id":59650,"structure_id":13470,"section_number":"62.1-44.15:28","catch_line":"Development of regulations","url":"\/62.1-44.15_28\/","token":"62.1\/3.1\/2.3\/62.1-44.15_28","metadata":false},{"id":64215,"structure_id":13470,"section_number":"62.1-44.15:28.1","catch_line":"Pollutant removal by dredging","url":"\/62.1-44.15_28.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_28.1","metadata":false},{"id":81310,"structure_id":13470,"section_number":"62.1-44.15:29","catch_line":"Virginia Stormwater Management Fund","url":"\/62.1-44.15_29\/","token":"62.1\/3.1\/2.3\/62.1-44.15_29","metadata":false},{"id":57904,"structure_id":13470,"section_number":"62.1-44.15:29.1","catch_line":"Stormwater Local Assistance Fund","url":"\/62.1-44.15_29.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_29.1","metadata":false},{"id":54435,"structure_id":13470,"section_number":"62.1-44.15:29.2","catch_line":"Stormwater Local Assistance Fund, estimate of requests","url":"\/62.1-44.15_29.2\/","token":"62.1\/3.1\/2.3\/62.1-44.15_29.2","metadata":false},{"id":63117,"structure_id":13470,"section_number":"62.1-44.15:30","catch_line":"Training and certification","url":"\/62.1-44.15_30\/","token":"62.1\/3.1\/2.3\/62.1-44.15_30","metadata":false},{"id":84021,"structure_id":13470,"section_number":"62.1-44.15:31","catch_line":"Standards and specifications for state agencies, federal entities, and other specified entities","url":"\/62.1-44.15_31\/","token":"62.1\/3.1\/2.3\/62.1-44.15_31","metadata":false},{"id":64929,"structure_id":13470,"section_number":"62.1-44.15:32","catch_line":"Repealed","url":"\/62.1-44.15_32\/","token":"62.1\/3.1\/2.3\/62.1-44.15_32","metadata":false},{"id":76099,"structure_id":13470,"section_number":"62.1-44.15:33","catch_line":"Authorization for more stringent ordinances","url":"\/62.1-44.15_33\/","token":"62.1\/3.1\/2.3\/62.1-44.15_33","metadata":false},{"id":87045,"structure_id":13470,"section_number":"62.1-44.15:34","catch_line":"Regulated activities; submission and approval of a permit application; security for performance; exemptions","url":"\/62.1-44.15_34\/","token":"62.1\/3.1\/2.3\/62.1-44.15_34","metadata":false},{"id":67780,"structure_id":13470,"section_number":"62.1-44.15:35","catch_line":"Nutrient credit use and additional offsite options for construction activities","url":"\/62.1-44.15_35\/","token":"62.1\/3.1\/2.3\/62.1-44.15_35","metadata":false},{"id":59039,"structure_id":13470,"section_number":"62.1-44.15:36","catch_line":"Repealed","url":"\/62.1-44.15_36\/","token":"62.1\/3.1\/2.3\/62.1-44.15_36","metadata":false},{"id":75769,"structure_id":13470,"section_number":"62.1-44.15:37","catch_line":"Notices to comply and stop work orders","url":"\/62.1-44.15_37\/","token":"62.1\/3.1\/2.3\/62.1-44.15_37","metadata":false},{"id":61921,"structure_id":13470,"section_number":"62.1-44.15:37.1","catch_line":"Inspections; land-disturbing activities of natural gas pipelines; stop work instructions","url":"\/62.1-44.15_37.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_37.1","metadata":false},{"id":73042,"structure_id":13470,"section_number":"62.1-44.15:38","catch_line":"Repealed","url":"\/62.1-44.15_38\/","token":"62.1\/3.1\/2.3\/62.1-44.15_38","metadata":false},{"id":73631,"structure_id":13470,"section_number":"62.1-44.15:39","catch_line":"Right of entry","url":"\/62.1-44.15_39\/","token":"62.1\/3.1\/2.3\/62.1-44.15_39","metadata":false},{"id":81100,"structure_id":13470,"section_number":"62.1-44.15:40","catch_line":"Information to be furnished","url":"\/62.1-44.15_40\/","token":"62.1\/3.1\/2.3\/62.1-44.15_40","metadata":false},{"id":73244,"structure_id":13470,"section_number":"62.1-44.15:41","catch_line":"Liability of common interest communities","url":"\/62.1-44.15_41\/","token":"62.1\/3.1\/2.3\/62.1-44.15_41","metadata":false},{"id":67967,"structure_id":13470,"section_number":"62.1-44.15:42","catch_line":"Repealed","url":"\/62.1-44.15_42\/","token":"62.1\/3.1\/2.3\/62.1-44.15_42","metadata":false},{"id":86790,"structure_id":13470,"section_number":"62.1-44.15:46","catch_line":"Appeals","url":"\/62.1-44.15_46\/","token":"62.1\/3.1\/2.3\/62.1-44.15_46","metadata":false},{"id":63762,"structure_id":13470,"section_number":"62.1-44.15:47","catch_line":"Repealed","url":"\/62.1-44.15_47\/","token":"62.1\/3.1\/2.3\/62.1-44.15_47","metadata":false},{"id":71859,"structure_id":13470,"section_number":"62.1-44.15:48","catch_line":"Penalties, injunctions, and other legal actions","url":"\/62.1-44.15_48\/","token":"62.1\/3.1\/2.3\/62.1-44.15_48","metadata":false},{"id":82760,"structure_id":13470,"section_number":"62.1-44.15:49","catch_line":"Enforcement authority of MS4 localities","url":"\/62.1-44.15_49\/","token":"62.1\/3.1\/2.3\/62.1-44.15_49","metadata":false},{"id":73375,"structure_id":13470,"section_number":"62.1-44.15:49.1","catch_line":"MS4 industrial and high-risk programs","url":"\/62.1-44.15_49.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_49.1","metadata":false},{"id":62285,"structure_id":13470,"section_number":"62.1-44.15:50","catch_line":"Cooperation with federal and state agencies","url":"\/62.1-44.15_50\/","token":"62.1\/3.1\/2.3\/62.1-44.15_50","metadata":false}],"previous_section":{"id":62390,"structure_id":13470,"section_number":"62.1-44.15:26","catch_line":"Repealed","url":"\/62.1-44.15_26\/","token":"62.1\/3.1\/2.3\/62.1-44.15_26","metadata":false},"next_section":{"id":81987,"structure_id":13470,"section_number":"62.1-44.15:27","catch_line":"Virginia Programs for Erosion Control and Stormwater Management","url":"\/62.1-44.15_27\/","token":"62.1\/3.1\/2.3\/62.1-44.15_27","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/62.1-44.15:26.1\/","history_text":"<p>This law was first created in 2018. The record of its establishment is cataloged in chapter <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?181+ful+CHAP0630\">630<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":false,"permalink":{"id":269499,"object_type":"law","relational_id":86687,"identifier":"62.1-44.15:26.1","token":"62.1\/3.1\/2.3\/62.1-44.15_26.1","url":"\/62.1-44.15_26.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/62.1-44.15_26.1\/","token":"62.1\/3.1\/2.3\/62.1-44.15_26.1","dublin_core":{"Title":"Termination of Construction General Permit coverage","Type":"Text","Format":"text\/html","Identifier":"\u00a7 62.1-44.15:26.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section id=\"A\"><p><span class=\"prefix-number\">A.<\/span> A <span class=\"dictionary\">VSMP authority<\/span> shall recommend that the <span class=\"dictionary\">Department<\/span> of Environmental Quality terminate coverage under a General <span class=\"dictionary\">Permit<\/span> for Discharges of Stormwater from Construction Activities (Construction General <span class=\"dictionary\">Permit<\/span>) within 60 days of receiving a complete notice of termination from the operator of the construction activity. <a id=\"paragraph-310454\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/62.1-44.15_26.1\/#A\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"B\"><p><span class=\"prefix-number\">B.<\/span> Coverage under a Construction General <span class=\"dictionary\">Permit<\/span> shall be deemed to be terminated 90 days after the receipt by the <span class=\"dictionary\">VSMP authority<\/span> of a complete notice of termination from the operator of the construction activity. <a id=\"paragraph-310455\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/62.1-44.15_26.1\/#B\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>\n\t\t\t\t\t\t<section id=\"C\"><p><span class=\"prefix-number\">C.<\/span> If a <span class=\"dictionary\">VSMP authority<\/span> receives a notice of termination of a Construction General <span class=\"dictionary\">Permit<\/span> that it determines to be incomplete, the <span class=\"dictionary\">VSMP authority<\/span> shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice. <a id=\"paragraph-310456\" class=\"section-permalink\" href=\"https:\/\/vacode.org\/62.1-44.15_26.1\/#C\"><i class=\"fa fa-link\"><\/i><\/a><\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nTERMINATION OF CONSTRUCTION GENERAL PERMIT COVERAGE (\u00a7 62.1-44.15:26.1)\n\nA. A VSMP authority shall recommend that the Department of Environmental Quality\nterminate coverage under a General Permit for Discharges of Stormwater from\nConstruction Activities (Construction General Permit) within 60 days of\nreceiving a complete notice of termination from the operator of the construction\nactivity.\n\nB. Coverage under a Construction General Permit shall be deemed to be terminated\n90 days after the receipt by the VSMP authority of a complete notice of\ntermination from the operator of the construction activity.\n\nC. If a VSMP authority receives a notice of termination of a Construction\nGeneral Permit that it determines to be incomplete, the VSMP authority shall,\nwithin a reasonable time, inform the operator of the construction activity of\nsuch incompleteness and provide the operator with a detailed list itemizing the\nelements of information that are missing from the notice.\n\nHISTORY: 2018, c. 630.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}