{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/62.1-44.15_51.1.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/62.1-44.15_51.1.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/62.1-44.15_51.1.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/62.1-44.15_51.1.html"}],"law_id":77325,"edition_id":1,"section_id":77325,"structure_id":15073,"section_number":"62.1-44.15:51.1","catch_line":"Applicability","history":"2016, cc. 68, 758.","full_text":"The requirements of this article shall apply in any locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program (VESMP) pursuant to subdivision B 3 of \u00a7 62.1-44.15:27. Each such locality shall be required to adopt and administer a Board-approved VESCP.","order_by":null,"text":{"0":{"id":277336,"text":"The requirements of this article shall apply in any locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program (VESMP) pursuant to subdivision B 3 of \u00a7 62.1-44.15:27. Each such locality shall be required to adopt and administer a Board-approved VESCP.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":15073,"edition_id":1,"name":"Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program","identifier":"2.4","label":"article","depth":3,"order_by":1,"parent_id":13014,"metadata":{},"date_created":"2026-06-26 03:52:00","date_modified":"2026-06-26 03:52:00","permalink":{"id":269623,"object_type":"structure","relational_id":15073,"identifier":"2.4","token":"62.1\/3.1\/2.4","url":"\/62.1\/3.1\/2.4\/","edition_id":1,"permalink":0,"preferred":1}},{"id":13014,"edition_id":1,"name":"State Water Control Law","identifier":"3.1","label":"chapter","depth":2,"order_by":1,"parent_id":12909,"metadata":{},"date_created":"2026-06-26 03:44:08","date_modified":"2026-06-26 03:44:08","permalink":{"id":269169,"object_type":"structure","relational_id":13014,"identifier":"3.1","token":"62.1\/3.1","url":"\/62.1\/3.1\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12909,"edition_id":1,"name":"Waters of the State, Ports and Harbors","identifier":"62.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:44:00","date_modified":"2026-06-26 03:44:00","permalink":{"id":268199,"object_type":"structure","relational_id":12909,"identifier":"62.1","token":"62.1","url":"\/62.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":59976,"structure_id":15073,"section_number":"62.1-44.15:51","catch_line":"Definitions","url":"\/62.1-44.15_51\/","token":"62.1\/3.1\/2.4\/62.1-44.15_51","metadata":false},{"id":77325,"structure_id":15073,"section_number":"62.1-44.15:51.1","catch_line":"Applicability","url":"\/62.1-44.15_51.1\/","token":"62.1\/3.1\/2.4\/62.1-44.15_51.1","metadata":false},{"id":57827,"structure_id":15073,"section_number":"62.1-44.15:52","catch_line":"Virginia Erosion and Sediment Control Program","url":"\/62.1-44.15_52\/","token":"62.1\/3.1\/2.4\/62.1-44.15_52","metadata":false},{"id":58461,"structure_id":15073,"section_number":"62.1-44.15:53","catch_line":"Certification of program personnel","url":"\/62.1-44.15_53\/","token":"62.1\/3.1\/2.4\/62.1-44.15_53","metadata":false},{"id":59360,"structure_id":15073,"section_number":"62.1-44.15:54","catch_line":"Virginia Erosion and Sediment Control Program","url":"\/62.1-44.15_54\/","token":"62.1\/3.1\/2.4\/62.1-44.15_54","metadata":false},{"id":73356,"structure_id":15073,"section_number":"62.1-44.15:55","catch_line":"Regulated land-disturbing activities; submission and approval of erosion and sediment control plan","url":"\/62.1-44.15_55\/","token":"62.1\/3.1\/2.4\/62.1-44.15_55","metadata":false},{"id":71858,"structure_id":15073,"section_number":"62.1-44.15:55.1","catch_line":"Department review of erosion and sediment control plans for solar projects","url":"\/62.1-44.15_55.1\/","token":"62.1\/3.1\/2.4\/62.1-44.15_55.1","metadata":false},{"id":63528,"structure_id":15073,"section_number":"62.1-44.15:56","catch_line":"Repealed","url":"\/62.1-44.15_56\/","token":"62.1\/3.1\/2.4\/62.1-44.15_56","metadata":false},{"id":60412,"structure_id":15073,"section_number":"62.1-44.15:56.1","catch_line":"Department acceptance of plans in lieu of plan review","url":"\/62.1-44.15_56.1\/","token":"62.1\/3.1\/2.4\/62.1-44.15_56.1","metadata":false},{"id":78583,"structure_id":15073,"section_number":"62.1-44.15:57","catch_line":"Approved plan required for issuance of grading, building, or other permits; security for performance","url":"\/62.1-44.15_57\/","token":"62.1\/3.1\/2.4\/62.1-44.15_57","metadata":false},{"id":58785,"structure_id":15073,"section_number":"62.1-44.15:58","catch_line":"Monitoring, reports, and inspections","url":"\/62.1-44.15_58\/","token":"62.1\/3.1\/2.4\/62.1-44.15_58","metadata":false},{"id":68747,"structure_id":15073,"section_number":"62.1-44.15:58.1","catch_line":"Inspections; land-disturbing activities of natural gas pipelines; stop work instructions","url":"\/62.1-44.15_58.1\/","token":"62.1\/3.1\/2.4\/62.1-44.15_58.1","metadata":false},{"id":68955,"structure_id":15073,"section_number":"62.1-44.15:59","catch_line":"Reporting","url":"\/62.1-44.15_59\/","token":"62.1\/3.1\/2.4\/62.1-44.15_59","metadata":false},{"id":66328,"structure_id":15073,"section_number":"62.1-44.15:60","catch_line":"Right of entry","url":"\/62.1-44.15_60\/","token":"62.1\/3.1\/2.4\/62.1-44.15_60","metadata":false},{"id":86487,"structure_id":15073,"section_number":"62.1-44.15:61","catch_line":"Repealed","url":"\/62.1-44.15_61\/","token":"62.1\/3.1\/2.4\/62.1-44.15_61","metadata":false},{"id":63162,"structure_id":15073,"section_number":"62.1-44.15:62","catch_line":"Judicial appeals","url":"\/62.1-44.15_62\/","token":"62.1\/3.1\/2.4\/62.1-44.15_62","metadata":false},{"id":70738,"structure_id":15073,"section_number":"62.1-44.15:63","catch_line":"Penalties, injunctions and other legal actions","url":"\/62.1-44.15_63\/","token":"62.1\/3.1\/2.4\/62.1-44.15_63","metadata":false},{"id":57476,"structure_id":15073,"section_number":"62.1-44.15:64","catch_line":"Stop work orders by Board; civil penalties","url":"\/62.1-44.15_64\/","token":"62.1\/3.1\/2.4\/62.1-44.15_64","metadata":false},{"id":67572,"structure_id":15073,"section_number":"62.1-44.15:65","catch_line":"Authorization for more stringent ordinances","url":"\/62.1-44.15_65\/","token":"62.1\/3.1\/2.4\/62.1-44.15_65","metadata":false},{"id":73284,"structure_id":15073,"section_number":"62.1-44.15:66","catch_line":"No limitation on authority of Department of Energy","url":"\/62.1-44.15_66\/","token":"62.1\/3.1\/2.4\/62.1-44.15_66","metadata":false}],"previous_section":{"id":59976,"structure_id":15073,"section_number":"62.1-44.15:51","catch_line":"Definitions","url":"\/62.1-44.15_51\/","token":"62.1\/3.1\/2.4\/62.1-44.15_51","metadata":false},"next_section":{"id":57827,"structure_id":15073,"section_number":"62.1-44.15:52","catch_line":"Virginia Erosion and Sediment Control Program","url":"\/62.1-44.15_52\/","token":"62.1\/3.1\/2.4\/62.1-44.15_52","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/62.1-44.15:51.1\/","history_text":"<p>This law was first created in 2016. The record of its establishment is cataloged in chapters <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?161+ful+CHAP0068\">68<\/a> and <a href=\"https:\/\/legacylis.virginia.gov\/cgi-bin\/legp604.exe?161+ful+CHAP0758\">758<\/a> of that year\u2019s edition of \u201cActs of Assembly,\u201d the annual state publication listing all changes made to the Code of Virginia in that year.<\/p>","references":false,"refers_to":[{"id":81987,"section_number":"62.1-44.15:27","catch_line":"Virginia Programs for Erosion Control and Stormwater Management","order_by":null,"url":"\/62.1-44.15_27\/"}],"permalink":{"id":269629,"object_type":"law","relational_id":77325,"identifier":"62.1-44.15:51.1","token":"62.1\/3.1\/2.4\/62.1-44.15_51.1","url":"\/62.1-44.15_51.1\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/62.1-44.15_51.1\/","token":"62.1\/3.1\/2.4\/62.1-44.15_51.1","dublin_core":{"Title":"Applicability","Type":"Text","Format":"text\/html","Identifier":"\u00a7 62.1-44.15:51.1","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The requirements of this article shall apply in any locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program (VESMP) pursuant to subdivision B 3 of \u00a7&nbsp;<a class=\"law\" title=\"Virginia Programs for Erosion Control and Stormwater Management\" href=\"\/62.1-44.15_27\/\">62.1-44.15:27<\/a>. Each such locality shall be required to adopt and administer a <span class=\"dictionary\">Board<\/span>-approved <span class=\"dictionary\">VESCP<\/span>.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nAPPLICABILITY (\u00a7 62.1-44.15:51.1)\n\nThe requirements of this article shall apply in any locality that has chosen not\nto establish a Virginia Erosion and Stormwater Management Program (VESMP)\npursuant to subdivision B 3 of \u00a7 62.1-44.15:27. Each such locality shall be\nrequired to adopt and administer a Board-approved VESCP.\n\nHISTORY: 2016, cc. 68, 758.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}