{"formats":[{"name":"JSON","format":"json","url":"\/downloads\/2025\/code-json\/62.1-85.json"},{"name":"Plain Text","format":"text","url":"\/downloads\/2025\/code-text\/62.1-85.txt"},{"name":"XML","format":"xml","url":"\/downloads\/2025\/code-xml\/62.1-85.xml"},{"name":"HTML","format":"html","url":"\/downloads\/2025\/code-html\/62.1-85.html"}],"law_id":55141,"edition_id":1,"section_id":55141,"structure_id":13566,"section_number":"62.1-85","catch_line":"License required to construct dam; application","history":"Code 1950, \u00a7 62-73; 1968, c. 659; 1982, c. 183.","full_text":"The construction or reconstruction of any such dam as is mentioned in \u00a7 62.1-83 shall not be begun until the person, firm, association, corporation, private or municipal, or public utility as defined in \u00a7 56-232 proposing to construct or reconstruct the same shall first obtain a license so to do from the State Corporation Commission. The application for such license shall be filed with the Commission and in it all the essential facts shall be stated to enable the Commission to pass upon its merits. A copy of such application shall also be filed by the applicant with the Executive Director of the State Water Control Board within ten days after filing such application with the State Corporation Commission. Each application for license shall be accompanied by such maps, plans and other information as may be necessary to give a clear and full understanding of the proposed scheme of development, and of dams, generating stations or other major structures, if any, involved therein.","order_by":null,"text":{"0":{"id":202158,"text":"The construction or reconstruction of any such dam as is mentioned in \u00a7 62.1-83 shall not be begun until the person, firm, association, corporation, private or municipal, or public utility as defined in \u00a7 56-232 proposing to construct or reconstruct the same shall first obtain a license so to do from the State Corporation Commission. The application for such license shall be filed with the Commission and in it all the essential facts shall be stated to enable the Commission to pass upon its merits. A copy of such application shall also be filed by the applicant with the Executive Director of the State Water Control Board within ten days after filing such application with the State Corporation Commission. Each application for license shall be accompanied by such maps, plans and other information as may be necessary to give a clear and full understanding of the proposed scheme of development, and of dams, generating stations or other major structures, if any, involved therein.","type":"section","prefixes":[""],"prefix":"","entire_prefix":"","prefix_anchor":"","level":1}},"ancestry":[{"id":13566,"edition_id":1,"name":"Water-Power Development, Conservation of Hydroelectric Power Dams and Works","identifier":"7","label":"chapter","depth":2,"order_by":1,"parent_id":12909,"metadata":{},"date_created":"2026-06-26 03:45:16","date_modified":"2026-06-26 03:45:16","permalink":{"id":270449,"object_type":"structure","relational_id":13566,"identifier":"7","token":"62.1\/7","url":"\/62.1\/7\/","edition_id":1,"permalink":0,"preferred":1}},{"id":12909,"edition_id":1,"name":"Waters of the State, Ports and Harbors","identifier":"62.1","label":"title","depth":1,"order_by":1,"parent_id":null,"metadata":{},"date_created":"2026-06-26 03:44:00","date_modified":"2026-06-26 03:44:00","permalink":{"id":268199,"object_type":"structure","relational_id":12909,"identifier":"62.1","token":"62.1","url":"\/62.1\/","edition_id":1,"permalink":0,"preferred":1}}],"structure_contents":[{"id":54529,"structure_id":13566,"section_number":"62.1-100","catch_line":"Rules of Commission; reports; employment of experts, etc","url":"\/62.1-100\/","token":"62.1\/7\/62.1-100","metadata":false},{"id":64266,"structure_id":13566,"section_number":"62.1-101","catch_line":"Licenses not affected by alteration, amendment or repeal of chapter","url":"\/62.1-101\/","token":"62.1\/7\/62.1-101","metadata":false},{"id":62102,"structure_id":13566,"section_number":"62.1-102","catch_line":"Alteration or amendment of license","url":"\/62.1-102\/","token":"62.1\/7\/62.1-102","metadata":false},{"id":62125,"structure_id":13566,"section_number":"62.1-103","catch_line":"Jurisdiction of United States","url":"\/62.1-103\/","token":"62.1\/7\/62.1-103","metadata":false},{"id":65074,"structure_id":13566,"section_number":"62.1-80","catch_line":"Declaration of public policy","url":"\/62.1-80\/","token":"62.1\/7\/62.1-80","metadata":false},{"id":76400,"structure_id":13566,"section_number":"62.1-80.1","catch_line":"Applicability of chapter","url":"\/62.1-80.1\/","token":"62.1\/7\/62.1-80.1","metadata":false},{"id":63281,"structure_id":13566,"section_number":"62.1-81","catch_line":"\"Waters of the Commonwealth\" defined","url":"\/62.1-81\/","token":"62.1\/7\/62.1-81","metadata":false},{"id":72157,"structure_id":13566,"section_number":"62.1-82","catch_line":"Control and regulation by State Corporation Commission; existing rights of riparian owners","url":"\/62.1-82\/","token":"62.1\/7\/62.1-82","metadata":false},{"id":76133,"structure_id":13566,"section_number":"62.1-83","catch_line":"Dams across waters of Commonwealth","url":"\/62.1-83\/","token":"62.1\/7\/62.1-83","metadata":false},{"id":85122,"structure_id":13566,"section_number":"62.1-84","catch_line":"What \"dam\" includes","url":"\/62.1-84\/","token":"62.1\/7\/62.1-84","metadata":false},{"id":55141,"structure_id":13566,"section_number":"62.1-85","catch_line":"License required to construct dam; application","url":"\/62.1-85\/","token":"62.1\/7\/62.1-85","metadata":false},{"id":61496,"structure_id":13566,"section_number":"62.1-86","catch_line":"Notice of hearing on application","url":"\/62.1-86\/","token":"62.1\/7\/62.1-86","metadata":false},{"id":86050,"structure_id":13566,"section_number":"62.1-87","catch_line":"Proceedings at hearing","url":"\/62.1-87\/","token":"62.1\/7\/62.1-87","metadata":false},{"id":68856,"structure_id":13566,"section_number":"62.1-88","catch_line":"Determination and investigation by Commission","url":"\/62.1-88\/","token":"62.1\/7\/62.1-88","metadata":false},{"id":54636,"structure_id":13566,"section_number":"62.1-89","catch_line":"When license granted","url":"\/62.1-89\/","token":"62.1\/7\/62.1-89","metadata":false},{"id":84729,"structure_id":13566,"section_number":"62.1-90","catch_line":"Rejection of application; requiring applicant to modify plans","url":"\/62.1-90\/","token":"62.1\/7\/62.1-90","metadata":false},{"id":61211,"structure_id":13566,"section_number":"62.1-91","catch_line":"Terms and conditions of license; preventing obstruction of navigation or flow; dams across navigable waters of United States","url":"\/62.1-91\/","token":"62.1\/7\/62.1-91","metadata":false},{"id":58754,"structure_id":13566,"section_number":"62.1-92","catch_line":"Priority of location or appropriation; notice to owners of existing developments","url":"\/62.1-92\/","token":"62.1\/7\/62.1-92","metadata":false},{"id":86436,"structure_id":13566,"section_number":"62.1-93","catch_line":"Time limits on construction of proposed dam and works","url":"\/62.1-93\/","token":"62.1\/7\/62.1-93","metadata":false},{"id":70189,"structure_id":13566,"section_number":"62.1-94","catch_line":"Duration of licenses; acquisition of developments by Commonwealth","url":"\/62.1-94\/","token":"62.1\/7\/62.1-94","metadata":false},{"id":81079,"structure_id":13566,"section_number":"62.1-95","catch_line":"Value of license not to be estimated in valuation for rate making, etc.; intangible water-power value","url":"\/62.1-95\/","token":"62.1\/7\/62.1-95","metadata":false},{"id":84567,"structure_id":13566,"section_number":"62.1-96","catch_line":"Transfer or assignment of license","url":"\/62.1-96\/","token":"62.1\/7\/62.1-96","metadata":false},{"id":61160,"structure_id":13566,"section_number":"62.1-97","catch_line":"Proceedings on violation of terms of license or of provisions of chapter or regulations","url":"\/62.1-97\/","token":"62.1\/7\/62.1-97","metadata":false},{"id":55465,"structure_id":13566,"section_number":"62.1-98","catch_line":"Right of eminent domain of public service corporations","url":"\/62.1-98\/","token":"62.1\/7\/62.1-98","metadata":false},{"id":74361,"structure_id":13566,"section_number":"62.1-99","catch_line":"Water-power developments constructed or acquired prior to certain date","url":"\/62.1-99\/","token":"62.1\/7\/62.1-99","metadata":false}],"previous_section":{"id":85122,"structure_id":13566,"section_number":"62.1-84","catch_line":"What \"dam\" includes","url":"\/62.1-84\/","token":"62.1\/7\/62.1-84","metadata":false},"next_section":{"id":61496,"structure_id":13566,"section_number":"62.1-86","catch_line":"Notice of hearing on application","url":"\/62.1-86\/","token":"62.1\/7\/62.1-86","metadata":false},"metadata":false,"official_url":"https:\/\/law.lis.virginia.gov\/vacode\/62.1-85\/","history_text":"<p>The record of this law\u2019s original creation isn\u2019t available online. It has been modified 2 times. Those modifications are cataloged by \u201cThe Acts of Assembly,\u201d a state publication, by year and chapter. Those modifications that can be read on the General Assembly\u2019s website will be linked accordingly. Those modifications are as follows: in 1968, chapter 659; in 1982, chapter 183.<\/p>","references":false,"refers_to":[{"id":75233,"section_number":"56-232","catch_line":"Public utility and schedules defined","order_by":null,"url":"\/56-232\/"},{"id":76133,"section_number":"62.1-83","catch_line":"Dams across waters of Commonwealth","order_by":null,"url":"\/62.1-83\/"}],"permalink":{"id":270491,"object_type":"law","relational_id":55141,"identifier":"62.1-85","token":"62.1\/7\/62.1-85","url":"\/62.1-85\/","edition_id":1,"permalink":0,"preferred":1},"url":"\/62.1-85\/","token":"62.1\/7\/62.1-85","dublin_core":{"Title":"License required to construct dam; application","Type":"Text","Format":"text\/html","Identifier":"\u00a7 62.1-85","Relation":"Code of Virginia"},"html":"\n\t\t\t\t\t\t<section><p>The construction or reconstruction of any such dam as is mentioned in \u00a7&nbsp;<a class=\"law\" title=\"Dams across waters of Commonwealth\" href=\"\/62.1-83\/\">62.1-83<\/a> shall not be begun until the person, firm, association, corporation, private or municipal, or public utility as defined in \u00a7&nbsp;<a class=\"law\" title=\"Public utility and schedules defined\" href=\"\/56-232\/\">56-232<\/a> proposing to construct or reconstruct the same shall first obtain a license so to do from the State Corporation Commission. The application for such license shall be filed with the Commission and in it all the essential <span class=\"dictionary\">facts<\/span> shall be stated to enable the Commission to pass upon its merits. A copy of such application shall also be filed by the applicant with the Executive Director of the State Water Control Board within ten days after filing such application with the State Corporation Commission. Each application for license shall be accompanied by such maps, plans and other information as may be necessary to give a clear and full understanding of the proposed scheme of development, and of dams, generating stations or other major structures, if any, involved therein.<\/p><\/section>","plain_text":"                                 CODE OF VIRGINIA\n\nLICENSE REQUIRED TO CONSTRUCT DAM; APPLICATION (\u00a7 62.1-85)\n\nThe construction or reconstruction of any such dam as is mentioned in \u00a7 62.1-83\nshall not be begun until the person, firm, association, corporation, private or\nmunicipal, or public utility as defined in \u00a7 56-232 proposing to construct or\nreconstruct the same shall first obtain a license so to do from the State\nCorporation Commission. The application for such license shall be filed with the\nCommission and in it all the essential facts shall be stated to enable the\nCommission to pass upon its merits. A copy of such application shall also be\nfiled by the applicant with the Executive Director of the State Water Control\nBoard within ten days after filing such application with the State Corporation\nCommission. Each application for license shall be accompanied by such maps,\nplans and other information as may be necessary to give a clear and full\nunderstanding of the proposed scheme of development, and of dams, generating\nstations or other major structures, if any, involved therein.\n\nHISTORY: Code 1950, \u00a7 62-73; 1968, c. 659; 1982, c. 183.","edition":{"id":1,"name":"2025","slug":"2025","date_created":"2026-06-21 22:39:22","date_modified":"2026-06-21 22:39:22","current":1,"order_by":1,"last_import":null}}