<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>83474</law_id><section_number>10.1-1408.1</section_number><catch_line>Permit required; open dumps prohibited</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>10.1-1411</reference><reference>10.1-1413.2</reference><reference>10.1-1418.2</reference><reference>10.1-1457</reference><reference>15.2-931</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="10.1">Conservation</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Activities Administered by Other Entities</unit><unit label="chapter" level="3" order_by="1" identifier="14">Virginia Waste Management Act</unit><unit label="article" level="4" order_by="1" identifier="2">Solid Waste Management</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> No <span class="dictionary">person</span> shall operate any <span class="dictionary">sanitary landfill</span> or other facility for the <span class="dictionary">disposal</span>, <span class="dictionary">treatment</span> or storage of nonhazardous <span class="dictionary">solid waste</span> without a permit from the <span class="dictionary">Director</span>. <a id="paragraph-299134" class="section-permalink" href="https://vacode.org/10.1-1408.1/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> No application for (i) a new <span class="dictionary">solid waste management facility</span> permit or (ii) application for a permit amendment or variance allowing a category 2 landfill, as defined in this section, to expand or increase in capacity shall be complete unless it contains the following: <a id="paragraph-299135" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> Certification from the governing body of the county, city or town in which the facility is to be located that the location and operation of the facility are consistent with all applicable <span class="dictionary">ordinances</span>. The governing body shall inform the <span class="dictionary">applicant</span> and the <span class="dictionary">Department</span> of the facility&#x2019;s compliance or noncompliance not more than 120 days from receipt of a request from the <span class="dictionary">applicant</span>. No such certification shall be required for the application for the renewal of a permit or transfer of a permit as authorized by regulations of the <span class="dictionary">Board</span>; <a id="paragraph-299136" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> A <span class="dictionary">disclosure statement</span>, except that the <span class="dictionary">Director</span>, upon request and in his sole discretion, and when in his <span class="dictionary">judgment</span> other information is sufficient and available, may <span class="dictionary">waive</span> the requirement for a <span class="dictionary">disclosure statement</span> for a captive industrial landfill when such a statement would not serve the purposes of this chapter; <a id="paragraph-299137" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="B3" class="indent-1"><p><span class="prefix-number">3.</span> If the <span class="dictionary">applicant</span> proposes to locate the facility on property not governed by any county, city or town zoning <span class="dictionary">ordinance</span>, certification from the governing body that it has held a public <span class="dictionary">hearing</span>, in accordance with the applicable provisions of &#xA7; <a class="law" title="Advertisement of plans, ordinances, etc.; joint public hearings; written notice of certain amendments" href="/15.2-2204/">15.2-2204</a>, to receive public comment on the proposed facility. Such certification shall be provided to the <span class="dictionary">applicant</span> and the <span class="dictionary">Department</span> within 120 days from receipt of a request from the <span class="dictionary">applicant</span>; <a id="paragraph-299138" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B3"><i class="fa fa-link"/></a></p></section>
						<section id="B4" class="indent-1"><p><span class="prefix-number">4.</span> If the <span class="dictionary">applicant</span> proposes to operate a new <span class="dictionary">sanitary landfill</span> or transfer station, a statement, including a description of the steps taken by the <span class="dictionary">applicant</span> to seek the comments of the residents of the area where the <span class="dictionary">sanitary landfill</span> or transfer station is proposed to be located, regarding the siting and operation of the proposed <span class="dictionary">sanitary landfill</span> or transfer station. The public comment steps shall be taken prior to filing with the <span class="dictionary">Department</span> the notice of <span class="dictionary">intent</span> to apply for a permit for the <span class="dictionary">sanitary landfill</span> or transfer station as required by the <span class="dictionary">Department</span>&#x2019;s solid waste management regulations. The public comment steps shall include publication of a public notice once a week for two consecutive weeks in a newspaper of general circulation serving the locality where the <span class="dictionary">sanitary landfill</span> or transfer station is proposed to be located and holding at least one public meeting within the locality to identify <span class="dictionary">issues</span> of concern, to facilitate communication and to establish a dialogue between the <span class="dictionary">applicant</span> and <span class="dictionary">persons</span> who may be affected by the issuance of a permit for the <span class="dictionary">sanitary landfill</span> or transfer station. The public notice shall include a statement of the <span class="dictionary">applicant</span>&#x2019;s <span class="dictionary">intent</span> to apply for a permit to operate the proposed <span class="dictionary">sanitary landfill</span> or transfer station, the proposed <span class="dictionary">sanitary landfill</span> or transfer station site location, the date, time and location of the public meeting the <span class="dictionary">applicant</span> will hold and the name, address and telephone number of a <span class="dictionary">person</span> employed by the <span class="dictionary">applicant</span>, who can be contacted by interested <span class="dictionary">persons</span> to answer questions or receive comments on the siting and operation of the proposed <span class="dictionary">sanitary landfill</span> or transfer station. The first publication of the public notice shall be at least fourteen days prior to the public meeting date.
				The provisions of this subdivision shall not apply to <span class="dictionary">applicants</span> for a permit to operate a new captive industrial landfill or a new construction-demolition-debris landfill; <a id="paragraph-299139" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B4"><i class="fa fa-link"/></a></p></section>
						<section id="B5" class="indent-1"><p><span class="prefix-number">5.</span> If the <span class="dictionary">applicant</span> is a local government or public authority that proposes to operate a new municipal <span class="dictionary">sanitary landfill</span> or transfer station, a statement, including a description of the steps taken by the <span class="dictionary">applicant</span> to seek the comments of the residents of the area where the <span class="dictionary">sanitary landfill</span> or transfer station is proposed to be located, regarding the siting and operation of the proposed <span class="dictionary">sanitary landfill</span> or transfer station. The public comment steps shall be taken prior to filing with the <span class="dictionary">Department</span> the notice of <span class="dictionary">intent</span> to apply for a permit for the <span class="dictionary">sanitary landfill</span> or transfer station as required by the <span class="dictionary">Department</span>&#x2019;s solid waste management regulations. The public comment steps shall include the formation of a citizens&#x2019; advisory group to assist the locality or public authority with the selection of a proposed site for the <span class="dictionary">sanitary landfill</span> or transfer station, publication of a public notice once a week for two consecutive weeks in a newspaper of general circulation serving the locality where the <span class="dictionary">sanitary landfill</span> or transfer station is proposed to be located, and holding at least one public meeting within the locality to identify <span class="dictionary">issues</span> of concern, to facilitate communication and to establish a dialogue between the <span class="dictionary">applicant</span> and <span class="dictionary">persons</span> who may be affected by the issuance of a permit for the <span class="dictionary">sanitary landfill</span> or transfer station. The public notice shall include a statement of the <span class="dictionary">applicant</span>&#x2019;s <span class="dictionary">intent</span> to apply for a permit to operate the proposed <span class="dictionary">sanitary landfill</span> or transfer station, the proposed <span class="dictionary">sanitary landfill</span> or transfer station site location, the date, time and location of the public meeting the <span class="dictionary">applicant</span> will hold and the name, address and telephone number of a <span class="dictionary">person</span> employed by the <span class="dictionary">applicant</span>, who can be contacted by interested <span class="dictionary">persons</span> to answer questions or receive comments on the siting and operation of the proposed <span class="dictionary">sanitary landfill</span> or transfer station. The first publication of the public notice shall be at least fourteen days prior to the public meeting date. For local governments that have zoning <span class="dictionary">ordinances</span>, such public comment steps as required under &#xA7;&#xA7; <a class="law" title="Advertisement of plans, ordinances, etc.; joint public hearings; written notice of certain amendments" href="/15.2-2204/">15.2-2204</a> and <a class="law" title="Preparation and adoption of zoning ordinance and map and amendments thereto; appeal" href="/15.2-2285/">15.2-2285</a> shall satisfy the public comment requirements for public <span class="dictionary">hearings</span> and public notice as required under this section. Any <span class="dictionary">applicant</span> which is a local government or public authority that proposes to operate a new transfer station on land where a municipal <span class="dictionary">sanitary landfill</span> is already located shall be exempt from the public comment requirements for public <span class="dictionary">hearing</span> and public notice otherwise required under this section; <a id="paragraph-299140" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B5"><i class="fa fa-link"/></a></p></section>
						<section id="B6" class="indent-1"><p><span class="prefix-number">6.</span> If the application is for a new municipal solid waste landfill or for an expansion of an existing municipal solid waste landfill, a statement, signed by the <span class="dictionary">applicant</span>, guaranteeing that sufficient <span class="dictionary">disposal</span> capacity will be available in the facility to enable localities within the Commonwealth to comply with solid waste management plans developed pursuant to &#xA7; <a class="law" title="Regional and local solid waste management plans" href="/10.1-1411/">10.1-1411</a>, and certifying that such localities will be allowed to <span class="dictionary">contract</span> for and to reserve <span class="dictionary">disposal</span> capacity in the facility. This provision shall not apply to permit applications from one or more political subdivisions for new landfills or expanded landfills that will only accept municipal solid waste generated within those political subdivisions&#x2019; <span class="dictionary">jurisdiction</span> or municipal solid waste generated within other political subdivisions pursuant to an interjurisdictional agreement; <a id="paragraph-299141" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B6"><i class="fa fa-link"/></a></p></section>
						<section id="B7" class="indent-1"><p><span class="prefix-number">7.</span> If the application is for a new municipal solid waste landfill or for an expansion of an existing municipal solid waste landfill, certification from the governing body of the locality in which the facility would be located that a <span class="dictionary">host agreement</span> has been reached between the <span class="dictionary">applicant</span> and the governing body unless the governing body or a public service authority of which the governing body is a member would be the owner and operator of the landfill. The agreement shall, at a minimum, have provisions covering (i) the amount of financial compensation the <span class="dictionary">applicant</span> will provide the host locality, (ii) daily travel routes and traffic volumes, (iii) the daily <span class="dictionary">disposal</span> limit, and (iv) the anticipated service area of the facility. The <span class="dictionary">host agreement</span> shall contain a provision that the <span class="dictionary">applicant</span> will pay the full cost of at least one full-time employee of the locality whose responsibility it will be to monitor and inspect waste <span class="dictionary">transportation</span> and <span class="dictionary">disposal</span> practices in the locality. The <span class="dictionary">host agreement</span> shall also provide that the <span class="dictionary">applicant</span> shall, when requested by the host locality, split air and water samples so that the host locality may independently test the sample, with all associated costs paid for by the <span class="dictionary">applicant</span>. All such sampling results shall be provided to the <span class="dictionary">Department</span>. For purposes of this subdivision, &#x201C;<span class="dictionary">host agreement</span>&#x201D; means any lease, <span class="dictionary">contract</span>, agreement or land use permit entered into or issued by the locality in which the landfill is situated which includes terms or conditions governing the operation of the landfill; <a id="paragraph-299142" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B7"><i class="fa fa-link"/></a></p></section>
						<section id="B8" class="indent-1"><p><span class="prefix-number">8.</span> If the application is for a locality-owned and locality-operated new municipal solid waste landfill or for an expansion of an existing such municipal solid waste landfill, information on the anticipated (i) daily travel routes and traffic volumes, (ii) daily <span class="dictionary">disposal</span> limit, and (iii) service area of the facility; and <a id="paragraph-299143" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B8"><i class="fa fa-link"/></a></p></section>
						<section id="B9" class="indent-1"><p><span class="prefix-number">9.</span> If the application is for a new <span class="dictionary">solid waste management facility</span> permit or for modification of a permit to allow an existing <span class="dictionary">solid waste management facility</span> to expand or increase its capacity, the application shall include certification from the governing body for the locality in which the facility is or will be located that: (i) the proposed new facility or the expansion or increase in capacity of the existing facility is consistent with the applicable local or regional solid waste management plan developed and approved pursuant to &#xA7; <a class="law" title="Regional and local solid waste management plans" href="/10.1-1411/">10.1-1411</a>; or (ii) the local government or solid waste management planning unit has initiated the process to revise the solid waste management plan to include the new or expanded facility. Inclusion of such certification shall be sufficient to allow processing of the permit application, up to but not including publication of the draft permit or permit amendment for public comment, but shall not bind the <span class="dictionary">Director</span> in making the determination required by subdivision D 1. <a id="paragraph-299144" class="section-permalink" href="https://vacode.org/10.1-1408.1/#B9"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> Notwithstanding any other provision of <span class="dictionary">law</span>: <a id="paragraph-299145" class="section-permalink" href="https://vacode.org/10.1-1408.1/#C"><i class="fa fa-link"/></a></p></section>
						<section id="C1" class="indent-1"><p><span class="prefix-number">1.</span> Every holder of a permit issued under this article who has not earlier filed a <span class="dictionary">disclosure statement</span> shall, prior to July 1, 1991, file a <span class="dictionary">disclosure statement</span> with the <span class="dictionary">Director</span>. <a id="paragraph-299146" class="section-permalink" href="https://vacode.org/10.1-1408.1/#C1"><i class="fa fa-link"/></a></p></section>
						<section id="C2" class="indent-1"><p><span class="prefix-number">2.</span> Every <span class="dictionary">applicant</span> for a permit under this article shall file a <span class="dictionary">disclosure statement</span> with the <span class="dictionary">Director</span>, together with the permit application or prior to September 1, 1990, whichever comes later. No permit application shall be deemed incomplete for lack of a <span class="dictionary">disclosure statement</span> prior to September 1, 1990. <a id="paragraph-299147" class="section-permalink" href="https://vacode.org/10.1-1408.1/#C2"><i class="fa fa-link"/></a></p></section>
						<section id="C3" class="indent-1"><p><span class="prefix-number">3.</span> Every <span class="dictionary">applicant</span> shall update its <span class="dictionary">disclosure statement</span> quarterly to indicate any change of condition that renders any portion of the <span class="dictionary">disclosure statement</span> materially incomplete or inaccurate. <a id="paragraph-299148" class="section-permalink" href="https://vacode.org/10.1-1408.1/#C3"><i class="fa fa-link"/></a></p></section>
						<section id="C4" class="indent-1"><p><span class="prefix-number">4.</span> The <span class="dictionary">Director</span>, upon request and in his sole discretion, and when in his <span class="dictionary">judgment</span> other information is sufficient and available, may <span class="dictionary">waive</span> the requirements of this subsection for a captive industrial waste landfill when such requirements would not serve the purposes of this chapter. <a id="paragraph-299149" class="section-permalink" href="https://vacode.org/10.1-1408.1/#C4"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> 1. Except as provided in subdivision D 2, no permit for a new <span class="dictionary">solid waste management facility</span> nor any amendment to a permit allowing facility expansion or an increase in capacity shall be issued until the <span class="dictionary">Director</span> has determined, after an investigation and analysis of the potential human health, environmental, <span class="dictionary">transportation</span> infrastructure, and <span class="dictionary">transportation</span> safety impacts and needs and an evaluation of comments by the host local government, other local governments and interested <span class="dictionary">persons</span>, that (i) the proposed facility, expansion, or increase protects present and future human health and safety and the environment; (ii) there is a need for the additional capacity; (iii) sufficient infrastructure will exist to safely handle the waste flow; (iv) the increase is consistent with locality-imposed or state-imposed daily <span class="dictionary">disposal</span> limits; (v) the public interest will be served by the proposed facility&#x2019;s operation or the expansion or increase in capacity of a facility; and (vi) the proposed <span class="dictionary">solid waste management facility</span>, facility expansion, or additional capacity is consistent with regional and local solid waste management plans developed pursuant to &#xA7;&#xA0;<a class="law" title="Regional and local solid waste management plans" href="/10.1-1411/">10.1-1411</a>. The <span class="dictionary">Department</span> shall hold a public <span class="dictionary">hearing</span> within the said county, city or town prior to the issuance of any such permit for the management of nonhazardous solid waste. Subdivision D 2, in lieu of this subdivision, shall apply to nonhazardous industrial solid waste management facilities owned or operated by the generator of the waste managed at the facility, and that accept only waste generated by the facility owner or operator. The <span class="dictionary">Board</span> shall have the authority to promulgate regulations to implement this subdivision. <a id="paragraph-299150" class="section-permalink" href="https://vacode.org/10.1-1408.1/#D"><i class="fa fa-link"/></a></p></section>
						<section id="D2" class="indent-1"><p><span class="prefix-number">2.</span> No new permit for a nonhazardous industrial <span class="dictionary">solid waste management facility</span> that is owned or operated by the generator of the waste managed at the facility, and that accepts only waste generated by the facility owner or operator, shall be issued until the <span class="dictionary">Director</span> has determined, after investigation and evaluation of comments by the local government, that the proposed facility poses no substantial present or potential danger to human health or the environment. The <span class="dictionary">Department</span> shall hold a public <span class="dictionary">hearing</span> within the county, city or town where the facility is to be located prior to the issuance of any such permit for the management of nonhazardous industrial solid waste. <a id="paragraph-299151" class="section-permalink" href="https://vacode.org/10.1-1408.1/#D2"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> The permit shall contain such conditions or requirements as are necessary to comply with the requirements of this Code and the regulations of the <span class="dictionary">Board</span> and to protect present and future human health and the environment. To the extent allowed by federal <span class="dictionary">law</span>, any <span class="dictionary">person</span> holding a permit that is intending to upgrade the permitted <span class="dictionary">solid waste management facility</span> by installing technology, control equipment, or other apparatus that the permittee demonstrates to the satisfaction of the <span class="dictionary">Director</span> will result in improved energy efficiency, protect waters of the state, including both surface and ground water, and protect air quality shall not be required to obtain a modified or amended permit.
			The <span class="dictionary">Director</span> may include in any permit such recordkeeping, testing and reporting requirements as are necessary to ensure that the local governing body of the county, city or town where the waste management facility is located is kept timely informed regarding the general nature and quantity of waste being disposed of at the facility. Such recordkeeping, testing and reporting requirements shall require disclosure of proprietary information only as is necessary to carry out the purposes of this chapter. At least once every ten years, the <span class="dictionary">Director</span> shall review and <span class="dictionary">issue</span> written <span class="dictionary">findings</span> on the environmental compliance history of each permittee, <span class="dictionary">material</span> changes, if any, in <span class="dictionary">key personnel</span>, and technical limitations, standards, or regulations on which the original permit was based. The time period for review of each category of permits shall be established by <span class="dictionary">Board</span> regulation. If, upon such review, the <span class="dictionary">Director</span> finds that repeated <span class="dictionary">material</span> or substantial violations of the permittee or <span class="dictionary">material</span> changes in the permittee&#x2019;s <span class="dictionary">key personnel</span> would make continued operation of the facility not in the best interests of human health or the environment, the <span class="dictionary">Director</span> shall <span class="dictionary">amend</span> or revoke the permit, in accordance herewith. Whenever such review is undertaken, the <span class="dictionary">Director</span> may <span class="dictionary">amend</span> the permit to include additional limitations, standards, or conditions when the technical limitations, standards, or regulations on which the original permit was based have been changed by <span class="dictionary">statute</span> or amended by regulation or when any of the conditions in subsection B of &#xA7; <a class="law" title="Revocation or amendment of permits" href="/10.1-1409/">10.1-1409</a> exist. The <span class="dictionary">Director</span> may deny, revoke, or suspend any permit for any of the grounds listed under subsection A of &#xA7; <a class="law" title="Revocation or amendment of permits" href="/10.1-1409/">10.1-1409</a>. <a id="paragraph-299152" class="section-permalink" href="https://vacode.org/10.1-1408.1/#E"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> There shall exist no right to operate a landfill or other facility for the <span class="dictionary">disposal</span>, <span class="dictionary">treatment</span> or storage of nonhazardous solid waste or <span class="dictionary">hazardous waste</span> within the Commonwealth. Permits for solid waste management facilities shall not be transferable except as authorized in regulations promulgated by the <span class="dictionary">Board</span>. The issuance of a permit shall not convey or establish any property rights or any exclusive <span class="dictionary">privilege</span>, nor shall it authorize any injury to private property or any invasion of personal rights or any infringement of federal, state, or local <span class="dictionary">law</span> or regulation. <a id="paragraph-299153" class="section-permalink" href="https://vacode.org/10.1-1408.1/#F"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> No <span class="dictionary">person</span> shall dispose of solid waste in an <span class="dictionary">open dump</span> or dispose of or manage solid waste in an unpermitted facility, including by disposing, causing to be disposed, or arranging for the <span class="dictionary">disposal</span> of solid waste upon a property for which the <span class="dictionary">Director</span> has not issued a permit and that is not otherwise exempt from permitting requirements. <a id="paragraph-299154" class="section-permalink" href="https://vacode.org/10.1-1408.1/#G"><i class="fa fa-link"/></a></p></section>
						<section id="H"><p><span class="prefix-number">H.</span> No <span class="dictionary">person</span> shall own, operate or allow to be operated on his property an <span class="dictionary">open dump</span>. <a id="paragraph-299155" class="section-permalink" href="https://vacode.org/10.1-1408.1/#H"><i class="fa fa-link"/></a></p></section>
						<section id="I"><p><span class="prefix-number">I.</span> No <span class="dictionary">person</span> shall allow waste to be disposed of on his property without a permit. Any <span class="dictionary">person</span> who removes trees, brush, or other vegetation from land used for agricultural or forestal purposes shall not be required to obtain a permit if such <span class="dictionary">material</span> is deposited or placed on the same or other property of the same landowner from which such <span class="dictionary">materials</span> were cleared. The <span class="dictionary">Board</span> shall by regulation provide for other reasonable exemptions from permitting requirements for the <span class="dictionary">disposal</span> of trees, brush and other vegetation when such <span class="dictionary">materials</span> are removed for agricultural or forestal purposes.
			When promulgating any regulation pursuant to this section, the <span class="dictionary">Board</span> shall consider the character of the land affected, the density of population, and the volume of waste to be disposed, as well as other relevant factors. <a id="paragraph-299156" class="section-permalink" href="https://vacode.org/10.1-1408.1/#I"><i class="fa fa-link"/></a></p></section>
						<section id="J"><p><span class="prefix-number">J.</span> No permit shall be required pursuant to this section for <span class="dictionary">recycling</span> or for temporary storage incidental to <span class="dictionary">recycling</span>. As used in this subsection, &#x201C;<span class="dictionary">recycling</span>&#x201D; means any process whereby <span class="dictionary">material</span> which would otherwise be solid waste is used or reused, or prepared for use or reuse, as an ingredient in an industrial process to make a product, or as an effective substitute for a commercial product. <a id="paragraph-299157" class="section-permalink" href="https://vacode.org/10.1-1408.1/#J"><i class="fa fa-link"/></a></p></section>
						<section id="K"><p><span class="prefix-number">K.</span> The <span class="dictionary">Board</span> shall provide for reasonable exemptions from the permitting requirements, both procedural and substantive, in <span class="dictionary">order</span> to encourage the development of <span class="dictionary">yard waste</span> <span class="dictionary">composting</span> facilities. To accomplish this, the <span class="dictionary">Board</span> is authorized to exempt such facilities from regulations governing the <span class="dictionary">treatment</span> of waste and to establish an expedited approval process. Agricultural operations receiving only <span class="dictionary">yard waste</span> for <span class="dictionary">composting</span> shall be exempt from permitting requirements provided that (i) the <span class="dictionary">composting</span> area is located not less than 300 feet from a property boundary, is located not less than 1,000 feet from an occupied dwelling not located on the same property as the <span class="dictionary">composting</span> area, and is not located within an area designated as a flood plain as defined in &#xA7; <a class="law" title="Definitions" href="/10.1-600/">10.1-600</a>; (ii) the agricultural operation has at least one acre of ground suitable to receive <span class="dictionary">yard waste</span> for each 150 cubic yards of finished compost generated; (iii) the total time for the <span class="dictionary">composting</span> process and storage of <span class="dictionary">material</span> that is being composted or has been composted shall not exceed eighteen months prior to its field application or sale as a horticultural or agricultural product; and (iv) the owner or operator of the agricultural operation notifies the <span class="dictionary">Director</span> in writing of his <span class="dictionary">intent</span> to operate a <span class="dictionary">yard waste</span> <span class="dictionary">composting</span> facility and the amount of land available for the receipt of <span class="dictionary">yard waste</span>. In addition to the requirements set forth in clauses (i) through (iv) of the preceding sentence, the owner and operator of any agricultural operation that receives more than 6,000 cubic yards of <span class="dictionary">yard waste</span> generated from property not within the control of the owner or the operator in any twelve-month period shall be exempt from permitting requirements provided (i) the owner and operator submit to the <span class="dictionary">Director</span> an annual report describing the volume and types of <span class="dictionary">yard waste</span> received by such operation for <span class="dictionary">composting</span> and (ii) the operator shall certify that the <span class="dictionary">yard waste</span> <span class="dictionary">composting</span> facility complies with local <span class="dictionary">ordinances</span>. The <span class="dictionary">Director</span> shall establish a procedure for the filing of the notices, annual reports and certificates required by this subsection and shall prescribe the forms for the annual reports and certificates. Nothing contained in this article shall prohibit the sale of composted <span class="dictionary">yard waste</span> for horticultural or agricultural use, provided that any composted <span class="dictionary">yard waste</span> sold as a commercial fertilizer with claims of specific nutrient values, promoting plant growth, or of conditioning soil shall be sold in accordance with Chapter 36 (&#xA7; <a class="law" title="Definitions" href="/3.2-3600/">3.2-3600</a> et seq.) of Title 3.2. As used in this subsection, &#x201C;agricultural operation&#x201D; shall have the same meaning ascribed to it in &#xA7; <a class="law" title="Definitions" href="/3.2-300/">3.2-300</a>.
			The operation of a <span class="dictionary">composting</span> facility as provided in this subsection shall not relieve the owner or operator of such a facility from liability for any violation of this chapter. <a id="paragraph-299158" class="section-permalink" href="https://vacode.org/10.1-1408.1/#K"><i class="fa fa-link"/></a></p></section>
						<section id="L"><p><span class="prefix-number">L.</span> The <span class="dictionary">Board</span> shall provide for reasonable exemptions from the permitting requirements, both procedural and substantive, in <span class="dictionary">order</span> to encourage the development of facilities for the decomposition of <span class="dictionary">vegetative waste</span>. To accomplish this, the <span class="dictionary">Board</span> shall approve an expedited approval process. As used in this subsection, the decomposition of <span class="dictionary">vegetative waste</span> means a natural aerobic or anaerobic process, active or passive, which results in the decay and chemical breakdown of the <span class="dictionary">vegetative waste</span>. Nothing in this subsection shall be construed to prohibit a city or county from exercising its existing authority to regulate such facilities by requiring, among other things, permits and proof of financial security. <a id="paragraph-299159" class="section-permalink" href="https://vacode.org/10.1-1408.1/#L"><i class="fa fa-link"/></a></p></section>
						<section id="M"><p><span class="prefix-number">M.</span> In receiving and processing applications for permits required by this section, the <span class="dictionary">Director</span> shall assign top priority to applications which (i) agree to accept nonhazardous <span class="dictionary">recycling residues</span> and (ii) pledge to charge tipping fees for <span class="dictionary">disposal</span> of nonhazardous <span class="dictionary">recycling residues</span> which do not exceed those charged for nonhazardous municipal solid waste. Applications meeting these requirements shall be acted upon no later than six months after they are deemed complete. <a id="paragraph-299160" class="section-permalink" href="https://vacode.org/10.1-1408.1/#M"><i class="fa fa-link"/></a></p></section>
						<section id="N"><p><span class="prefix-number">N.</span> Every <span class="dictionary">solid waste management facility</span> shall be operated in compliance with the regulations promulgated by the <span class="dictionary">Board</span> pursuant to this chapter. To the extent consistent with federal <span class="dictionary">law</span>, those facilities which were permitted prior to March 15, 1993, and upon which solid waste has been disposed of prior to October 9, 1993, may continue to receive solid waste until they have reached their vertical design capacity, provided that the facility is in compliance with the requirements for liners and leachate control in effect at the time of permit issuance, and further provided that on or before October 9, 1993, the owner or operator of the <span class="dictionary">solid waste management facility</span> submits to the <span class="dictionary">Director</span>: <a id="paragraph-299161" class="section-permalink" href="https://vacode.org/10.1-1408.1/#N"><i class="fa fa-link"/></a></p></section>
						<section id="N1" class="indent-1"><p><span class="prefix-number">1.</span> An acknowledgement that the owner or operator is familiar with state and federal <span class="dictionary">law</span> and regulations pertaining to solid waste management facilities operating after October 9, 1993, including postclosure care, corrective action and financial responsibility requirements; <a id="paragraph-299162" class="section-permalink" href="https://vacode.org/10.1-1408.1/#N1"><i class="fa fa-link"/></a></p></section>
						<section id="N2" class="indent-1"><p><span class="prefix-number">2.</span> A statement signed by a registered professional engineer that he has reviewed the regulations established by the <span class="dictionary">Department</span> for solid waste management facilities, including the <span class="dictionary">open dump</span> criteria contained therein; that he has inspected the facility and examined the monitoring data compiled for the facility in accordance with applicable regulations; and that, on the basis of his inspection and review, he has concluded that: (i) the facility is not an <span class="dictionary">open dump</span>, (ii) the facility does not pose a substantial present or potential hazard to human health and the environment, and (iii) the leachate or residues from the facility do not pose a threat of contamination or pollution of the air, surface water or ground water in a manner constituting an <span class="dictionary">open dump</span> or resulting in a substantial present or potential hazard to human health or the environment; and <a id="paragraph-299163" class="section-permalink" href="https://vacode.org/10.1-1408.1/#N2"><i class="fa fa-link"/></a></p></section>
						<section id="N3" class="indent-1"><p><span class="prefix-number">3.</span> A statement signed by the owner or operator (i) that the facility complies with applicable financial assurance regulations and (ii) estimating when the facility will reach its vertical design capacity.
				The facility may not be enlarged prematurely to avoid compliance with state or federal regulations when such enlargement is not consistent with past operating practices, the permit or modified operating practices to ensure good management.
				Facilities which are authorized by this subsection to accept waste for <span class="dictionary">disposal</span> beyond the waste boundaries existing on October 9, 1993, shall be as follows:
				Category 1: Nonhazardous industrial waste facilities that are located on property owned or controlled by the generator of the waste disposed of in the facility;
				Category 2: Nonhazardous industrial waste facilities other than those that are located on property owned or controlled by the generator of the waste disposed of in the facility, provided that the facility accepts only industrial waste streams which the facility has lawfully accepted prior to July 1, 1995, or other nonhazardous industrial waste as approved by the <span class="dictionary">Department</span> on a case-by-case basis; and
				Category 3: Facilities that accept only construction-demolition-debris waste as defined in the <span class="dictionary">Board</span>&#x2019;s regulations.
				The <span class="dictionary">Director</span> may prohibit or restrict the <span class="dictionary">disposal</span> of waste in facilities described in this subsection which contains hazardous constituents as defined in applicable regulations which, in the <span class="dictionary">opinion</span> of the <span class="dictionary">Director</span>, would pose a substantial risk to health or the environment. Facilities described in category 3 may expand laterally beyond the waste <span class="dictionary">disposal</span> boundaries existing on October 9, 1993, provided that there is first installed, in such expanded areas, liners and leachate control systems meeting the applicable performance requirements of the <span class="dictionary">Board</span>&#x2019;s regulations, or a demonstration is made to the satisfaction of the <span class="dictionary">Director</span> that such facilities satisfy the applicable variance criteria in the <span class="dictionary">Board</span>&#x2019;s regulations.
				Owners or operators of facilities which are authorized under this subsection to accept waste for <span class="dictionary">disposal</span> beyond the waste boundaries existing on October 9, 1993, shall ensure that such expanded <span class="dictionary">disposal</span> areas maintain setback distances applicable to such facilities under the <span class="dictionary">Board</span>&#x2019;s current regulations and local <span class="dictionary">ordinances</span>. Prior to the expansion of any facility described in category 2 or 3, the owner or operator shall provide the <span class="dictionary">Director</span> with written notice of the proposed expansion at least sixty days prior to commencement of construction. The notice shall include recent groundwater monitoring data sufficient to determine that the facility does not pose a threat of contamination of groundwater in a manner constituting an <span class="dictionary">open dump</span> or creating a substantial present or potential hazard to human health or the environment. The <span class="dictionary">Director</span> shall evaluate the data included with the notification and may advise the owner or operator of any additional requirements that may be necessary to ensure compliance with applicable <span class="dictionary">laws</span> and prevent a substantial present or potential hazard to health or the environment.
				Facilities, or portions thereof, which have reached their vertical design capacity shall be closed in compliance with regulations promulgated by the <span class="dictionary">Board</span>.
				Nothing in this subsection shall alter any requirement for groundwater monitoring, financial responsibility, operator certification, closure, postclosure care, operation, maintenance or corrective action imposed under state or federal <span class="dictionary">law</span> or regulation, or impair the powers of the <span class="dictionary">Director</span> pursuant to &#xA7; <a class="law" title="Revocation or amendment of permits" href="/10.1-1409/">10.1-1409</a>. <a id="paragraph-299164" class="section-permalink" href="https://vacode.org/10.1-1408.1/#N3"><i class="fa fa-link"/></a></p></section>
						<section id="O"><p><span class="prefix-number">O.</span> Portions of a permitted <span class="dictionary">solid waste management facility</span> used solely for the storage of <span class="dictionary">household hazardous waste</span> may store <span class="dictionary">household hazardous waste</span> for a period not to exceed one year, provided that such <span class="dictionary">wastes</span> are properly contained and are segregated to prevent mixing of incompatible <span class="dictionary">wastes</span>. <a id="paragraph-299165" class="section-permalink" href="https://vacode.org/10.1-1408.1/#O"><i class="fa fa-link"/></a></p></section>
						<section id="P"><p><span class="prefix-number">P.</span> Any permit for a new municipal solid waste landfill, and any permit amendment authorizing expansion of an existing municipal solid waste landfill, shall incorporate conditions to require that capacity in the landfill will be available to localities within the Commonwealth that choose to <span class="dictionary">contract</span> for and reserve such capacity for <span class="dictionary">disposal</span> of such localities&#x2019; solid waste in accordance with solid waste management plans developed by such localities pursuant to &#xA7; <a class="law" title="Regional and local solid waste management plans" href="/10.1-1411/">10.1-1411</a>. This provision shall not apply to permit applications from one or more political subdivisions for new landfills or expanded landfills that will only accept municipal solid waste generated within the political subdivision or subdivisions&#x2019; <span class="dictionary">jurisdiction</span> or municipal solid waste generated within other political subdivisions pursuant to an interjurisdictional agreement. <a id="paragraph-299166" class="section-permalink" href="https://vacode.org/10.1-1408.1/#P"><i class="fa fa-link"/></a></p></section>
						<section id="Q"><p><span class="prefix-number">Q.</span> No application for coverage under a permit-by-rule or for modification of coverage under a permit-by-rule shall be complete unless it contains certification from the governing body of the locality in which the facility is to be located that the facility is consistent with the solid waste management plan developed and approved in accordance with &#xA7; <a class="law" title="Regional and local solid waste management plans" href="/10.1-1411/">10.1-1411</a>. <a id="paragraph-299167" class="section-permalink" href="https://vacode.org/10.1-1408.1/#Q"><i class="fa fa-link"/></a></p></section></text><history>1988, cc. 696, 891; 1989, c. 623; 1990, cc. 360, 781, 919; 1992, c. 286; 1993, cc. 214, 469, 476, 496; 1994, c. 614; 1995, c. 442; 1996, c. 236; 1997, c. 875; 1999, cc. 580, 584, 611, 613, 947; 2000, cc. 420, 422; 2006, c. 62; 2007, c. 23; 2012, c. 581; 2020, c. 621.</history><metadata></metadata></law>
