<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>83209</law_id><section_number>10.1-1435</section_number><catch_line>Certification of site approval required; &amp;#8220;construction&amp;#8221; defined; remedies</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><structure><unit label="title" level="1" order_by="1" identifier="10.1">Conservation</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Activities Administered by Other Entities</unit><unit label="chapter" level="3" order_by="1" identifier="14">Virginia Waste Management Act</unit><unit label="article" level="4" order_by="1" identifier="6">Siting of Hazardous Waste Facilities</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> No <span class="dictionary">person</span> shall <span class="dictionary">construct</span> or commence <span class="dictionary">construction</span> of a <span class="dictionary">hazardous waste facility</span> without first obtaining a <span class="dictionary">certification</span> of site approval by the <span class="dictionary">Board</span> in the manner prescribed herein. For the purpose of this section, &#x201C;<span class="dictionary">construct</span>&#x201D; and &#x201C;<span class="dictionary">construction</span>&#x201D; mean (i) with respect to new facilities, the significant alteration of a site to install permanent equipment or structures or the installation of permanent equipment or structures; (ii) with respect to existing facilities, the alteration or expansion of existing structures or facilities to initially accommodate hazardous waste, any expansion of more than fifty percent of the area or capacity of an existing <span class="dictionary">hazardous waste facility</span>, or any change in design or process of a <span class="dictionary">hazardous waste facility</span> that will, in the <span class="dictionary">opinion</span> of the <span class="dictionary">Board</span>, result in a substantially different type of facility. <span class="dictionary">Construction</span> does not include preliminary engineering or site surveys, environmental studies, site acquisition, acquisition of an option to purchase or activities normally incident thereto. <a id="paragraph-298127" class="section-permalink" href="https://vacode.org/10.1-1435/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Upon receiving a written request from the <span class="dictionary">owner</span> or <span class="dictionary">operator</span> of the facility, the <span class="dictionary">Board</span> may allow, without going through the procedures of this article, any changes in the facilities which are designed to: <a id="paragraph-298128" class="section-permalink" href="https://vacode.org/10.1-1435/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> Prevent a threat to human health or the environment because of an emergency situation; <a id="paragraph-298129" class="section-permalink" href="https://vacode.org/10.1-1435/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> Comply with federal or state <span class="dictionary">laws</span> and regulations; or <a id="paragraph-298130" class="section-permalink" href="https://vacode.org/10.1-1435/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="B3" class="indent-1"><p><span class="prefix-number">3.</span> Demonstrably result in safer or environmentally more acceptable processes. <a id="paragraph-298131" class="section-permalink" href="https://vacode.org/10.1-1435/#B3"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> Any <span class="dictionary">person</span> violating this section may be enjoined by the <span class="dictionary">circuit</span> <span class="dictionary">court</span> of the <span class="dictionary">jurisdiction</span> wherein the facility is located or the proposed facility is to be located. Such an action may be instituted by the <span class="dictionary">Board</span>, the <span class="dictionary">Attorney General</span>, or the political subdivision in which the violation occurs. In any such action, it shall not be necessary for the <span class="dictionary">plaintiff</span> to plead or prove irreparable harm or lack of an adequate remedy at <span class="dictionary">law</span>. No <span class="dictionary">person</span> shall be required to post any <span class="dictionary">injunction</span> <span class="dictionary">bond</span> or other security under this section. No action may be brought under this section after a <span class="dictionary">certification</span> of site approval has been issued by the <span class="dictionary">Board</span>, notwithstanding the pendency of any <span class="dictionary">appeals</span> or other challenges to the <span class="dictionary">Board</span>&#x2019;s action. In any action under this section, the <span class="dictionary">court</span> may award reasonable costs of <span class="dictionary">litigation</span>, including attorney and <span class="dictionary">expert witness</span> fees, to any <span class="dictionary">party</span> if the <span class="dictionary">party</span> substantially prevails on the merits of the case and if in the determination of the <span class="dictionary">court</span> the <span class="dictionary">party</span> against whom the costs are awarded has acted unreasonably. <a id="paragraph-298132" class="section-permalink" href="https://vacode.org/10.1-1435/#C"><i class="fa fa-link"/></a></p></section></text><history>1986, c. 492, &#xA7; 10-291; 1988, c. 891.</history><metadata></metadata></law>
