<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>56867</law_id><section_number>10.1-605</section_number><catch_line>Promulgation of regulations by the Board; guidance document</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>10.1-604.1</reference><reference>10.1-605.1</reference><reference>10.1-609</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="10.1">Conservation</unit><unit label="subtitle" level="2" order_by="1" identifier="I">Activities Administered by the Department of Conservation and Recreation</unit><unit label="chapter" level="3" order_by="1" identifier="6">Flood Protection and Dam Safety</unit><unit label="article" level="4" order_by="1" identifier="2">Dam Safety Act</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> The <span class="dictionary">Board</span> shall adopt regulations to ensure that <span class="dictionary">impounding structures</span> in the Commonwealth are properly and safely constructed, maintained and operated. Dam safety regulations promulgated by the State Water Control <span class="dictionary">Board</span> shall remain in full force until amended in accordance with applicable procedures. <a id="paragraph-208285" class="section-permalink" href="https://vacode.org/10.1-605/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> The <span class="dictionary">Board</span>&#x2019;s <span class="dictionary">Impounding Structure</span> Regulations shall not require any <span class="dictionary">impounding structure</span> in existence or under a <span class="dictionary">construction</span> permit prior to July 1, 2010, that is currently classified as high hazard, or is subsequently found to be high hazard through reclassification, to upgrade its spillway to pass a rainfall event greater than the maximum recorded within the Commonwealth, which shall be deemed to be 90 percent of the probable maximum precipitation. <a id="paragraph-208286" class="section-permalink" href="https://vacode.org/10.1-605/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> Such an <span class="dictionary">impounding structure</span> shall be determined to be in compliance with the spillway requirements of the regulations provided that (i) the <span class="dictionary">impounding structure</span> will pass two-thirds of the reduced probable maximum precipitation requirement described in this subsection and (ii) the dam <span class="dictionary">owner</span> certifies annually and by January 15 that such <span class="dictionary">impounding structure</span> meets each of the following conditions:
				a. The <span class="dictionary">owner</span> has a current emergency action plan that is approved by the <span class="dictionary">Board</span> and that is developed and updated in accordance with the regulations;
				b. The <span class="dictionary">owner</span> has exercised the emergency action plan in accordance with the regulations and conducts a table-top exercise at least once every two years;
				c. The <span class="dictionary">Department</span> has verification that both the local emergency management coordinator and the Virginia <span class="dictionary">Department</span> of Emergency Management have on file current emergency action plans and updates for the <span class="dictionary">impounding structure</span>;
				d. That conditions at the <span class="dictionary">impounding structure</span> are monitored on a daily basis and as dictated by the emergency action plan;
				e. The <span class="dictionary">impounding structure</span> is inspected at least annually by a professional engineer and all observed deficiencies are addressed within 120 days of such inspection;
				f. The <span class="dictionary">owner</span> has a <span class="dictionary">dam break inundation zone</span> map developed in accordance with the regulations that is acceptable to the <span class="dictionary">Department</span>;
				g. The <span class="dictionary">owner</span> is insured in an amount that will substantially cover the costs of downstream property losses to others that may result from a dam failure; and
				h. The <span class="dictionary">owner</span> shall post the dam&#x2019;s emergency action plan on his website, or upon the request of the <span class="dictionary">owner</span>, the <span class="dictionary">Department</span> or another state agency responsible for providing emergency management services to citizens agrees to post the plan on its website. If the <span class="dictionary">Department</span> or another state agency agrees to post the plan on its website, the <span class="dictionary">owner</span> shall provide the plan in a format suitable for posting. <a id="paragraph-208287" class="section-permalink" href="https://vacode.org/10.1-605/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> A dam <span class="dictionary">owner</span> who meets the conditions of subdivisions 1 a through 1 h, but has not provided record drawings to the <span class="dictionary">Department</span> for his <span class="dictionary">impounding structure</span>, shall submit a complete record report developed in accordance with the <span class="dictionary">construction</span> permit requirements of the <span class="dictionary">Impounding Structure</span> Regulations, excluding the required submittal of the record drawings. <a id="paragraph-208288" class="section-permalink" href="https://vacode.org/10.1-605/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="B3" class="indent-1"><p><span class="prefix-number">3.</span> A dam <span class="dictionary">owner</span> who fails to submit certifications required by subdivisions 1 a through 1 h in a timely fashion shall not enjoy the <span class="dictionary">presumption</span> that such <span class="dictionary">impounding structure</span> is deemed to be in compliance with the spillway requirements of the <span class="dictionary">Board</span>&#x2019;s <span class="dictionary">Impounding Structure</span> Regulations (4VAC50-20). <a id="paragraph-208289" class="section-permalink" href="https://vacode.org/10.1-605/#B3"><i class="fa fa-link"/></a></p></section>
						<section id="B4" class="indent-1"><p><span class="prefix-number">4.</span> Any dam <span class="dictionary">owner</span> who has submitted the certifications required by subdivisions 1 a through 1 h shall make (i) such certifications, (ii) the emergency action plan required by subdivision 1 a, and (iii) the certificate of insurance required by subdivision 1 g available, upon request and within five business days, to any person. A dam <span class="dictionary">owner</span> may comply with the requirements of this subdivision by providing the same information on a website and directing the requestor to such website. A dam <span class="dictionary">owner</span> who fails to comply with this subdivision shall be subject to a civil <span class="dictionary">penalty</span> pursuant to &#xA7; <a class="law" title="Unsafe dams presenting nonimminent danger; civil penalty" href="/10.1-609/">10.1-609</a>. <a id="paragraph-208290" class="section-permalink" href="https://vacode.org/10.1-605/#B4"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> The <span class="dictionary">Board</span>&#x2019;s regulations shall establish an incremental damage analysis procedure that permits the spillway design flood requirement for an <span class="dictionary">impounding structure</span> to be reduced to the level at which dam failure shall not significantly increase downstream hazard to life or property, provided that the spillway design flood requirement shall not be reduced to below the 100-year flood event for high or significant hazard <span class="dictionary">impounding structures</span>, or to below the 50-year flood event for low hazard potential <span class="dictionary">impounding structures</span>. <a id="paragraph-208291" class="section-permalink" href="https://vacode.org/10.1-605/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> The <span class="dictionary">Board</span> shall consider the impact of limited-use or private roadways with low traffic volume and low public safety risk that are downstream from or across an <span class="dictionary">impounding structure</span> in the determination of the hazard potential classification of an <span class="dictionary">impounding structure</span>. <a id="paragraph-208292" class="section-permalink" href="https://vacode.org/10.1-605/#D"><i class="fa fa-link"/></a></p></section></text><history>1982, c. 583, &#xA7; 62.1-115.2; 1986, c. 9; 1988, c. 891; 2010, cc. 249, 270; 2011, c. 323; 2025, cc. 228, 241.</history><metadata></metadata></law>
