<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>83894</law_id><section_number>2.2-4380</section_number><catch_line>Construction management or design-build contracts for state public bodies authorized</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>2.2-4383</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="2.2">Administration of Government</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Administration of State Government</unit><unit label="part" level="3" order_by="1" identifier="B">Transaction of Public Business</unit><unit label="chapter" level="4" order_by="1" identifier="43.1">Construction Management and Design-Build Contracting</unit><unit label="article" level="5" order_by="1" identifier="2">Procedures for State Public Bodies</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Any <span class="dictionary">state public body</span> may enter into a <span class="dictionary">contract</span> for construction on a fixed price or not-to-exceed price construction management or design-build basis, provided that (i) the <span class="dictionary">Department</span> has approved the use of construction management or <span class="dictionary">design-build contracts</span> and (ii) such public body complies with the requirements of this article and the procedures adopted by the Secretary of Administration for using construction management or <span class="dictionary">design-build contracts</span>. <a id="paragraph-300650" class="section-permalink" href="https://vacode.org/2.2-4380/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Procedures adopted by a <span class="dictionary">state public body</span> pursuant to this article shall include the following requirements: <a id="paragraph-300651" class="section-permalink" href="https://vacode.org/2.2-4380/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> A written determination is made in advance by the <span class="dictionary">state public body</span> that the <span class="dictionary">design-bid-build</span> project delivery method is not practicable or fiscally advantageous, and such writing shall document the basis for the determination to use construction management or design-build. The determination shall be included in the Request for Qualifications and maintained in the procurement file; <a id="paragraph-300652" class="section-permalink" href="https://vacode.org/2.2-4380/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> Prior to making a determination as to the use of construction management or design-build for a specific construction project, a <span class="dictionary">state public body</span> shall have in its employ or under <span class="dictionary">contract</span> a licensed architect or engineer with professional competence appropriate to the project who shall (i) advise the public body regarding the use of construction management or design-build for that project and (ii) assist the public body with the preparation of the Request for Proposal and the evaluation of such proposals; <a id="paragraph-300653" class="section-permalink" href="https://vacode.org/2.2-4380/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="B3" class="indent-1"><p><span class="prefix-number">3.</span> Public notice of the Request for Qualifications is posted on the <span class="dictionary">Department</span>&#x2019;s central electronic procurement website, known as eVA, at least 30 days prior to the date set for receipt of qualification proposals; <a id="paragraph-300654" class="section-permalink" href="https://vacode.org/2.2-4380/#B3"><i class="fa fa-link"/></a></p></section>
						<section id="B4" class="indent-1"><p><span class="prefix-number">4.</span> For <span class="dictionary">construction management contracts</span>, the <span class="dictionary">contract</span> is entered into no later than the completion of the schematic phase of design, unless prohibited by authorization of funding restrictions; <a id="paragraph-300655" class="section-permalink" href="https://vacode.org/2.2-4380/#B4"><i class="fa fa-link"/></a></p></section>
						<section id="B5" class="indent-1"><p><span class="prefix-number">5.</span> Prior construction management or design-build experience or previous experience with the <span class="dictionary">Division</span> shall not be considered as a prerequisite or factor considered for prequalification or award of a <span class="dictionary">contract</span>. However, in the selection of a contractor, a <span class="dictionary">state public body</span> may consider the experience of each contractor on comparable projects of similar complexity and size; <a id="paragraph-300656" class="section-permalink" href="https://vacode.org/2.2-4380/#B5"><i class="fa fa-link"/></a></p></section>
						<section id="B6" class="indent-1"><p><span class="prefix-number">6.</span> <span class="dictionary">Construction management contracts</span> shall require that (i) no more than 10 percent of the construction work, as measured by the cost of the work, be performed by the construction manager with its own forces and (ii) the remaining 90 percent of the construction work, as measured by the cost of the work, be performed by subcontractors of the construction manager, which the construction manager shall procure by publicly advertised, competitive <span class="dictionary">sealed</span> bidding to the maximum extent practicable; <a id="paragraph-300657" class="section-permalink" href="https://vacode.org/2.2-4380/#B6"><i class="fa fa-link"/></a></p></section>
						<section id="B7" class="indent-1"><p><span class="prefix-number">7.</span> The procedures allow for a two-step competitive negotiation process; and <a id="paragraph-300658" class="section-permalink" href="https://vacode.org/2.2-4380/#B7"><i class="fa fa-link"/></a></p></section>
						<section id="B8" class="indent-1"><p><span class="prefix-number">8.</span> The procedures allow the <span class="dictionary">state public body</span> to post on the <span class="dictionary">Department</span>&#x2019;s central electronic procurement website known as eVA when and where the general contractor plans to advertise bid packages for subcontracting opportunities when appropriate. <a id="paragraph-300659" class="section-permalink" href="https://vacode.org/2.2-4380/#B8"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> The <span class="dictionary">Department</span> shall evaluate the proposed procurement method selected by the <span class="dictionary">state public body</span> and make its recommendation as to whether the use of the construction management or design-build procurement method is appropriate for the specific project. In its review, the <span class="dictionary">Department</span> shall also consider: <a id="paragraph-300660" class="section-permalink" href="https://vacode.org/2.2-4380/#C"><i class="fa fa-link"/></a></p></section>
						<section id="C1" class="indent-1"><p><span class="prefix-number">1.</span> The written determination of the <span class="dictionary">state public body</span>; <a id="paragraph-300661" class="section-permalink" href="https://vacode.org/2.2-4380/#C1"><i class="fa fa-link"/></a></p></section>
						<section id="C2" class="indent-1"><p><span class="prefix-number">2.</span> The compliance by the <span class="dictionary">state public body</span> with subdivisions B 1, 2, and 7; <a id="paragraph-300662" class="section-permalink" href="https://vacode.org/2.2-4380/#C2"><i class="fa fa-link"/></a></p></section>
						<section id="C3" class="indent-1"><p><span class="prefix-number">3.</span> The project cost, expected timeline, and use; <a id="paragraph-300663" class="section-permalink" href="https://vacode.org/2.2-4380/#C3"><i class="fa fa-link"/></a></p></section>
						<section id="C4" class="indent-1"><p><span class="prefix-number">4.</span> Whether the project is a <span class="dictionary">complex project</span>; and <a id="paragraph-300664" class="section-permalink" href="https://vacode.org/2.2-4380/#C4"><i class="fa fa-link"/></a></p></section>
						<section id="C5" class="indent-1"><p><span class="prefix-number">5.</span> Any other criteria established by the <span class="dictionary">Department</span> to evaluate the proposed procurement method for the project. <a id="paragraph-300665" class="section-permalink" href="https://vacode.org/2.2-4380/#C5"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> The <span class="dictionary">Department</span> shall conduct its review within five working days after receipt of the written determination and render its written approval or denial within such five-working-day period. The written approval or denial of the <span class="dictionary">Department</span> shall be maintained in the procurement file. <a id="paragraph-300666" class="section-permalink" href="https://vacode.org/2.2-4380/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> All documents open to public inspection pursuant to &#xA7; <a class="law" title="Public inspection of certain records" href="/2.2-4342/">2.2-4342</a> that are issued or received by the <span class="dictionary">Department</span> shall be posted on the <span class="dictionary">Department</span>&#x2019;s central electronic procurement website known as eVA. <a id="paragraph-300667" class="section-permalink" href="https://vacode.org/2.2-4380/#E"><i class="fa fa-link"/></a></p></section></text><history>2017, cc. 699, 704; 2024, cc. 469, 490.</history><metadata></metadata></law>