<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>79543</law_id><section_number>28.2-614</section_number><catch_line>Requiring lessee or transferor to have ground surveyed and plat recorded; canceling lease for failure of lessee to have survey</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>28.2-615</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="28.2">Fisheries and Habitat of the Tidal Waters</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Tidal Fisheries</unit><unit label="chapter" level="3" order_by="1" identifier="6">Planting Grounds</unit><unit label="article" level="4" order_by="1" identifier="2">General Oyster-Planting Grounds</unit></structure><text>
						<section><p>If the <span class="dictionary">Commissioner</span> determines that in any past assignment of or in any attempt to transfer oyster ground, a survey, or a recorded plat, does not accurately describe the metes and bounds of the leased ground, the <span class="dictionary">Commissioner</span> shall require the lessee, the transferor, or both to have the ground surveyed and the plat recorded.
		If the lessee fails to <span class="dictionary">order</span> the survey or resurvey within six months after date of notification to the lessee or transferor, by certified mail, the <span class="dictionary">Commissioner</span> shall cancel the lease and may accept applications for this ground from the general public.</p></section></text><history>Code 1950, &#xA7; 28-124; 1954, c. 352; 1958, c. 183; 1960, c. 517; 1962, c. 406, &#xA7; 28.1-109(12b); 1964, c. 393; 1966, c. 684; 1970, c. 726; 1972, c. 644; 1973, c. 14; 1978, cc. 546, 548; 1980, cc. 34, 609; 1984, c. 259; 1992, c. 836.</history><metadata></metadata></law>
