<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>68698</law_id><section_number>45.2-1009</section_number><catch_line> Permit required for coal surface mining operation; term; transfer, etc</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>45.2-1000</reference><reference>45.2-501</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Coal Mining</unit><unit label="part" level="3" order_by="1" identifier="C">Surface Coal Mines</unit><unit label="chapter" level="4" order_by="1" identifier="10">Virginia Coal Surface Mining Control and Reclamation Act of 1979</unit><unit label="article" level="5" order_by="1" identifier="2">Regulation of Mining Activity</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> No <span class="dictionary">person</span> shall engage in or carry out any coal surface mining operation without having first obtained a <span class="dictionary">permit</span> to engage in such operation issued by the <span class="dictionary">Director</span> in accordance with <span class="dictionary">state regulations</span>. <a id="paragraph-248702" class="section-permalink" href="https://vacode.org/45.2-1009/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Each coal surface mining <span class="dictionary">permit</span> issued pursuant to the requirements of this chapter shall be for a term of five years. The rights granted under such <span class="dictionary">permit</span> shall not be transferred, assigned, or sold without the written approval of the <span class="dictionary">Director</span> in accordance with regulations adopted by the <span class="dictionary">Director</span>. The <span class="dictionary">Director</span> shall also adopt regulations meeting the requirements of &#xA7; 506 of the <span class="dictionary">federal act</span> for longer <span class="dictionary">permit</span> terms, successors in interest to the <span class="dictionary">permittee</span>, termination of the <span class="dictionary">permit</span> for failure to commence operation, right of and procedure for <span class="dictionary">permit</span> renewal, and extension of boundaries of a mining operation. <a id="paragraph-248703" class="section-permalink" href="https://vacode.org/45.2-1009/#B"><i class="fa fa-link"/></a></p></section></text><history>1979, c. 290, &#xA7; 45.1-234; 1980, c. 364; 1983, c. 134; 1984, c. 590; 2013, cc. 47, 129; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
