<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>72308</law_id><section_number>45.2-1301</section_number><catch_line> Dams and mine refuse piles; construction</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>10.1-604</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="1" identifier="III">Mineral Mines</unit><unit label="part" level="3" order_by="1" identifier="A">Mineral Mines Generally</unit><unit label="chapter" level="4" order_by="1" identifier="13">Mineral Mining Retaining Dams; Adjacent Owners</unit><unit label="article" level="5" order_by="1" identifier="1">Mineral Mining Retaining Dams and Refuse Piles</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Any water-retaining or <span class="dictionary">silt</span>-retaining dam or mine <span class="dictionary">refuse</span> pile or modification of an existing water-retaining or <span class="dictionary">silt</span>-retaining dam or mine <span class="dictionary">refuse</span> pile shall be designed and constructed by or under the direction of a qualified engineer if such dam or pile is designed to <span class="dictionary">impound water</span> or <span class="dictionary">silt</span> to a height of (i) five feet or more above the lowest natural ground level within the impounded area and has a storage volume of 50 acre-feet or more or (ii) 20 feet or more, regardless of storage volume. <a id="paragraph-260458" class="section-permalink" href="https://vacode.org/45.2-1301/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Designs, construction specifications, and other related data, including final abandonment plans, for a water-retaining or <span class="dictionary">silt</span>-retaining dam or mine <span class="dictionary">refuse</span> pile shall be approved and certified by the qualified engineer as specified in subsection A and by the licensed operator or his agent. <a id="paragraph-260459" class="section-permalink" href="https://vacode.org/45.2-1301/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> The designs, construction specifications, and other related data approved and certified in accordance with subsection B shall be submitted for approval to the <span class="dictionary">Director</span>. If the <span class="dictionary">Director</span> approves the submittal, he shall notify the licensed operator in writing. If the <span class="dictionary">Director</span> disapproves the submittal, he shall notify the licensed operator with his written objections and required amendments. The <span class="dictionary">Director</span> shall approve or disapprove the submittal within 30 days following receipt thereof. <a id="paragraph-260460" class="section-permalink" href="https://vacode.org/45.2-1301/#C"><i class="fa fa-link"/></a></p></section></text><history>1997, c. 390, &#xA7; 45.1-225.1; 1998, c. 695; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
