<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>69690</law_id><section_number>45.2-1631</section_number><catch_line> Permit required; gas, oil, or geophysical operations; coalbed methane gas wells; environmental assessment</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>45.2-1620</reference><reference>45.2-1646</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="1" identifier="IV">Gas and Oil</unit><unit label="chapter" level="3" order_by="1" identifier="16">Virginia Gas and Oil Act</unit><unit label="article" level="4" order_by="1" identifier="3">Regulation of Gas and Oil Development and Production</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> No person shall commence any <span class="dictionary">ground-disturbing</span> activity for a <span class="dictionary">well</span>, <span class="dictionary">gathering pipeline</span>, geophysical exploration, or associated activity, facility, or structure without first having obtained from the <span class="dictionary">Director</span> a permit to conduct such activity. Every permit application or permit modification application filed with the <span class="dictionary">Director</span> shall be verified by the permit applicant and shall contain all data, <span class="dictionary">maps</span>, <span class="dictionary">plats</span>, plans, and other information as required by regulation or the <span class="dictionary">Director</span>. <a id="paragraph-251925" class="section-permalink" href="https://vacode.org/45.2-1631/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> For each permit issued on or after July 1, 1996, a new permit issued by the <span class="dictionary">Director</span> shall be issued only for the following activities: <span class="dictionary">geophysical operations</span>, drilling, casing, equipping, stimulating, producing, reworking an initially productive zone, plugging a <span class="dictionary">well</span>, or construction and operation of a <span class="dictionary">gathering pipeline</span>. An application for a new permit to conduct <span class="dictionary">geophysical operations</span> shall be accompanied by an application fee of $130. An application for a new permit for any other activity shall be accompanied by an application fee of $600. <a id="paragraph-251926" class="section-permalink" href="https://vacode.org/45.2-1631/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> For a permit issued prior to July 1, 1996, prior to commencing any reworking, deepening, or plugging of a <span class="dictionary">well</span>, or other activity not previously approved on the permitted site, a <span class="dictionary">permittee</span> shall first obtain a permit modification from the <span class="dictionary">Director</span>. Each application for a permit modification shall be accompanied by a permit modification fee of $300. For a permit issued on or after July 1, 1996, prior to commencing any new zone completion, a <span class="dictionary">permittee</span> shall first obtain a permit modification from the <span class="dictionary">Director</span>. <a id="paragraph-251927" class="section-permalink" href="https://vacode.org/45.2-1631/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> Every permit and all operations provided for under this section shall conform to the regulations and <span class="dictionary">orders</span> of the <span class="dictionary">Director</span> and the <span class="dictionary">Board</span>. If permit terms or conditions required or provided for under this article are in conflict with any provision of a conservation <span class="dictionary">order</span> issued pursuant to the provisions of Article 2 (&#xA7; <a class="law" title=" Meetings of the Board; notice; general powers and duties" href="/45.2-1613/">45.2-1613</a> et seq.), the terms or conditions of the permit shall control. In such event, the operator shall return to the <span class="dictionary">Board</span> for reconsideration of the conservation <span class="dictionary">order</span> in light of the conflicting permit. Every <span class="dictionary">permittee</span> shall be responsible for all operations, activities, or disturbances associated with the permitted site. <a id="paragraph-251928" class="section-permalink" href="https://vacode.org/45.2-1631/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> No permit or permit modification shall be issued by the <span class="dictionary">Director</span> until he has received from the applicant a written certification that (i) all notice requirements of this article have been complied with, together with proof thereof, and (ii) the applicant has the right to conduct the operations as set forth in the application and operations plan. <a id="paragraph-251929" class="section-permalink" href="https://vacode.org/45.2-1631/#E"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> A permit is required to drill any <span class="dictionary"><span class="dictionary">coalbed methane gas</span> well</span> or to convert any methane drainage borehole into a <span class="dictionary"><span class="dictionary">coalbed methane gas</span> well</span>. In addition to the other requirements of this section, every permit application for a <span class="dictionary"><span class="dictionary">coalbed methane gas</span> well</span> shall include: <a id="paragraph-251930" class="section-permalink" href="https://vacode.org/45.2-1631/#F"><i class="fa fa-link"/></a></p></section>
						<section id="F1" class="indent-1"><p><span class="prefix-number">1.</span> The method that the <span class="dictionary"><span class="dictionary"><span class="dictionary">coalbed methane gas</span> well</span> operator</span> will use to stimulate the well. <a id="paragraph-251931" class="section-permalink" href="https://vacode.org/45.2-1631/#F1"><i class="fa fa-link"/></a></p></section>
						<section id="F2" class="indent-1"><p><span class="prefix-number">2.</span> a. A signed consent from the <span class="dictionary">coal operator</span> of each <span class="dictionary">coal seam</span> that is located within (i) 750 horizontal feet of the proposed well location that the applicant proposes to stimulate or (ii) 100 vertical feet above or below a coal-bearing stratum that the applicant proposes to stimulate.
				b. The consent required by this subsection may be (i) contained in a lease or other such agreement; (ii) contained in an instrument of title; or (iii) in any case where a <span class="dictionary">coal operator</span> cannot be located or identified and the operator has complied with &#xA7; <a class="law" title=" Notice of hearing; standing; form of hearing" href="/45.2-1618/">45.2-1618</a>, provided by a pooling <span class="dictionary">order</span> entered pursuant to &#xA7; <a class="law" title=" Pooling of interests in drilling units" href="/45.2-1620/">45.2-1620</a> or <a class="law" title=" Pooling of interests for coalbed methane gas wells; conflicting claims to ownership" href="/45.2-1622/">45.2-1622</a> if such <span class="dictionary">order</span> contains a <span class="dictionary">finding</span> that the operator has exercised due diligence in attempting to identify and locate the <span class="dictionary">coal operator</span>, contained in such <span class="dictionary">order</span>. The consent required by this subsection shall be deemed to be granted for any tract where title to the coal is held by multiple owners if the applicant has obtained consent to stimulate from the cotenants holding a majority interest in the tract and none of the coal cotenants has leased the tract for coal development. The requirement of signed consent contained in this subsection shall in no way be considered to impair, abridge, or affect any contractual rights or objections arising out of a <span class="dictionary">coalbed methane gas</span> <span class="dictionary">contract</span> or <span class="dictionary">coalbed methane gas</span> lease entered into prior to January 1, 1990, between the applicant and any <span class="dictionary">coal operator</span> or any extension or renewal thereto, and the existence of such lease or contractual arrangement and any extension or renewal thereto shall constitute a <span class="dictionary">waiver</span> of the requirement for the applicant to file an additional signed consent. <a id="paragraph-251932" class="section-permalink" href="https://vacode.org/45.2-1631/#F2"><i class="fa fa-link"/></a></p></section>
						<section id="F3" class="indent-1"><p><span class="prefix-number">3.</span> The unit <span class="dictionary">map</span>, if any, approved by the <span class="dictionary">Board</span>. <a id="paragraph-251933" class="section-permalink" href="https://vacode.org/45.2-1631/#F3"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> No permit that is required by this chapter for an activity to be conducted within an area of Tidewater Virginia where drilling is authorized under subsection B of &#xA7; <a class="law" title=" Tidewater Virginia; drilling for gas or oil prohibited in certain areas" href="/45.2-1646/">45.2-1646</a> shall be granted until the environmental impact assessment required by &#xA7; <a class="law" title=" Tidewater Virginia; drilling for gas or oil prohibited in certain areas" href="/45.2-1646/">45.2-1646</a> has been conducted and the assessment has been reviewed by the <span class="dictionary">Department</span>. <a id="paragraph-251934" class="section-permalink" href="https://vacode.org/45.2-1631/#G"><i class="fa fa-link"/></a></p></section>
						<section id="H"><p><span class="prefix-number">H.</span> The applicant for a permit for a <span class="dictionary">gathering pipeline</span>, <span class="dictionary">oil</span> or gas well, or coalbed methane well shall identify in the permit application any cemetery, as identified on a United States Geological Survey topographic <span class="dictionary">map</span> or located by routine field review, within 100 feet of the permitted activity. <a id="paragraph-251935" class="section-permalink" href="https://vacode.org/45.2-1631/#H"><i class="fa fa-link"/></a></p></section>
						<section id="I"><p><span class="prefix-number">I.</span> The operator of any coalbed methane well drilled within 250 feet of a cemetery shall comply with a written request of any person owning an interest in a private cemetery or the authorized agent of a public cemetery that the operator of such well suspend operations for a period from two hours before to two hours after any burial service that takes place on the surface area of such cemetery. However, if the well operator or a <span class="dictionary">mine</span> operator determines that such suspension of operations will have an adverse effect on the safety of the well operations or mining operations, the operator shall be under no obligation to comply with the request, and operation of the well shall continue. <a id="paragraph-251936" class="section-permalink" href="https://vacode.org/45.2-1631/#I"><i class="fa fa-link"/></a></p></section></text><history>1982, c. 347, &#xA7; 45.1-311; 1985, c. 601; 1987, c. 452; 1988, c. 160, &#xA7; 45.1-311.1; 1990, cc. 92, 967, &#xA7; 45.1-361.29; 1994, c. 957; 1995, c. 269; 1996, c. 854; 1997, cc. 759, 765; 1998, c. 229; 2003, cc. 542, 550; 2008, c. 227; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
