<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>61394</law_id><section_number>45.2-774</section_number><catch_line> Electricity</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><structure><unit label="title" level="1" order_by="1" identifier="45.2">Mines, Minerals, and Energy</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Coal Mining</unit><unit label="part" level="3" order_by="1" identifier="B">Underground Coal Mines</unit><unit label="chapter" level="4" order_by="1" identifier="7">Requirements Applicable to Underground Coal Mines; Mine Construction</unit><unit label="article" level="5" order_by="1" identifier="9">Surface Areas</unit></structure><text>
						<section><p>The provisions of Article 9 (&#xA7;&#xA0;<a class="law" title=" Overhead high-potential power lines; surface transmission lines; electric wiring in surface buildings" href="/45.2-926/">45.2-926</a> et seq.) of Chapter 9 shall apply with respect to any power line, <span class="dictionary">circuit</span>, transformer, or other electrical equipment at any surface area of an underground coal mine.</p></section></text><history>1994, c. 28, &#xA7; 45.1-161.246; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
