<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>71170</law_id><section_number>56-46.1</section_number><catch_line>Commission to consider environmental, economic, and improvements in service reliability factors in approving construction of electrical utility facilities; approval required for construction of certain electrical transmission lines; notice and hearings</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>10.1-1186.3:1</reference><reference>10.1-1197.8</reference><reference>15.2-5406</reference><reference>56-265.2</reference><reference>56-578</reference><reference>56-580</reference><reference>56-585.1:5</reference><reference>62.1-44.15:21</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="56">Public Service Companies</unit><unit label="chapter" level="2" order_by="1" identifier="1">General Provisions</unit><unit label="article" level="3" order_by="1" identifier="6">Companies in Which Commonwealth Is Interested</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Whenever the <span class="dictionary">Commission</span> is required to approve the construction of any electrical utility facility, it shall give consideration to the effect of that facility on the environment and establish such conditions as may be desirable or necessary to minimize adverse environmental impact. In <span class="dictionary">order</span> to avoid duplication of governmental activities, any valid permit or approval required for an electric generating plant and associated facilities issued or granted by a federal, state, or local governmental entity charged by <span class="dictionary">law</span> with responsibility for issuing permits or approvals regulating environmental impact and mitigation of adverse environmental impact or for other specific public interest <span class="dictionary">issues</span> such as building codes, transportation plans, and public safety, whether such permit or approval is granted prior to or after the <span class="dictionary">Commission</span>&#x2019;s decision, shall be deemed to satisfy the requirements of this section with respect to all matters that (i) are governed by the permit or approval or (ii) are within the authority of, and were considered by, the governmental entity in issuing such permit or approval, and the <span class="dictionary">Commission</span> shall impose no additional conditions with respect to such matters. Nothing in this section shall affect the ability of the <span class="dictionary">Commission</span> to keep the record of a case open. Nothing in this section shall affect any right to <span class="dictionary">appeal</span> such permits or approvals in accordance with applicable <span class="dictionary">law</span>. In the case of a proposed facility located in a region that was designated as of July 1, 2001, as serious nonattainment for the one-hour ozone standard as set forth in the federal Clean Air Act, the <span class="dictionary">Commission</span> shall not <span class="dictionary">issue</span> a decision approving such proposed facility that is conditioned upon issuance of any environmental permit or approval. In every proceeding under this subsection, the <span class="dictionary">Commission</span> shall receive and give consideration to all reports that relate to the proposed facility by state agencies concerned with environmental protection; and if requested by any county or <span class="dictionary">municipality</span> in which the facility is proposed to be built, to local comprehensive plans that have been adopted pursuant to Article 3 (&#xA7; <a class="law" title="Comprehensive plan to be prepared and adopted; scope and purpose" href="/15.2-2223/">15.2-2223</a> et seq.) of Chapter 22 of Title 15.2. Additionally, the <span class="dictionary">Commission</span> (a) shall consider the effect of the proposed facility on economic development within the Commonwealth, including but not limited to furtherance of the economic and job creation objectives of the Commonwealth Clean Energy Policy set forth in &#xA7; <a class="law" title=" Commonwealth Clean Energy Policy" href="/45.2-1706.1/">45.2-1706.1</a>, and (b) shall consider any improvements in service reliability that may result from the construction of such facility. <a id="paragraph-256546" class="section-permalink" href="https://vacode.org/56-46.1/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Subject to the provisions of subsection J, no electrical transmission line of 138 kilovolts or more shall be constructed unless the State <span class="dictionary">Corporation</span> <span class="dictionary">Commission</span> shall, after at least 30 days&#x2019; advance notice by (i) publication in a newspaper or newspapers of general circulation in the counties and municipalities through which the line is proposed to be built, (ii) written notice to the governing body of each such county and <span class="dictionary">municipality</span>, and (iii) causing to be sent a copy of the notice by first class <span class="dictionary">mail</span> to all owners of property within the route of the proposed line, as indicated on the map or sketch of the route filed with the <span class="dictionary">Commission</span>, which requirement shall be satisfied by mailing the notice to such <span class="dictionary">persons</span> at such addresses as are indicated in the land books maintained by the commissioner of revenue, director of finance or treasurer of the county or <span class="dictionary">municipality</span>, approve such line. Such notices shall include a written description of the proposed route the line is to follow, as well as a map or sketch of the route including a digital geographic information system (GIS) map provided by the <span class="dictionary">public utility</span> showing the location of the proposed route. The <span class="dictionary">Commission</span> shall make GIS maps provided under this subsection available to the public on the <span class="dictionary">Commission</span>&#x2019;s website. Such notices shall be in addition to the advance notice to the chief administrative officer of the county or <span class="dictionary">municipality</span> required pursuant to &#xA7; <a class="law" title="Duties of state agencies; electric utilities" href="/15.2-2202/">15.2-2202</a>.
			As a condition to approval the <span class="dictionary">Commission</span> shall determine that the line is needed and that the corridor or route chosen for the line will avoid or reasonably minimize adverse impact to the greatest extent reasonably practicable on the scenic <span class="dictionary">assets</span>, historic and cultural resources recorded with the Department of Historic Resources, cultural resources identified by federally recognized Tribal Nations in the Commonwealth, and environment of the area concerned. To assist the <span class="dictionary">Commission</span> in this determination, as part of the application for <span class="dictionary">Commission</span> approval of the line, the applicant shall summarize its efforts to avoid or reasonably minimize adverse impact to the greatest extent reasonably practicable on the scenic <span class="dictionary">assets</span>, historic resources recorded with the Department of Historic Resources, and environment of the area concerned. In making the determinations about need, corridor or route, and method of installation, the <span class="dictionary">Commission</span> shall verify the applicant&#x2019;s load flow modeling, contingency analyses, and reliability needs presented to justify the new line and its proposed method of installation. If the local comprehensive plan of an affected county or <span class="dictionary">municipality</span> designates corridors or routes for electric transmission lines and the line is proposed to be constructed outside such corridors or routes, in any <span class="dictionary">hearing</span> the county or <span class="dictionary">municipality</span> may provide adequate <span class="dictionary">evidence</span> that the existing planned corridors or routes designated in the plan can adequately serve the needs of the <span class="dictionary">company</span>. Additionally, the <span class="dictionary">Commission</span> shall consider, upon the request of the governing body of any county or <span class="dictionary">municipality</span> in which the line is proposed to be constructed, (a) the costs and economic benefits likely to result from requiring the underground placement of the line and (b) any potential impediments to timely construction of the line. <a id="paragraph-256547" class="section-permalink" href="https://vacode.org/56-46.1/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> If, prior to such approval, any interested <span class="dictionary">party</span> shall request a public <span class="dictionary">hearing</span>, the <span class="dictionary">Commission</span> shall, as soon as reasonably practicable after such request, hold such <span class="dictionary">hearing</span> or <span class="dictionary">hearings</span> at such place as may be designated by the <span class="dictionary">Commission</span>. In any <span class="dictionary">hearing</span>, the <span class="dictionary">public service company</span> shall provide adequate <span class="dictionary">evidence</span> that existing rights-of-way cannot adequately serve the needs of the company.
			If, prior to such approval, written requests therefor are received from the governing body of any county or <span class="dictionary">municipality</span> through which the line is proposed to be built or from 20 or more <span class="dictionary">interested parties</span>, the <span class="dictionary">Commission</span> shall hold at least one <span class="dictionary">hearing</span> in the area that would be affected by construction of the line, for the purpose of receiving public comment on the proposal. If any <span class="dictionary">hearing</span> is to be held in the area affected, the <span class="dictionary">Commission</span> shall direct that a copy of the <span class="dictionary">transcripts</span> of any previous <span class="dictionary">hearings</span> held in the case be made available for public inspection at a convenient location in the area for a reasonable time before such local <span class="dictionary">hearing</span>. <a id="paragraph-256548" class="section-permalink" href="https://vacode.org/56-46.1/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> As used in this section, unless the context requires a different meaning:
			&#x201C;Environment&#x201D; or &#x201C;environmental&#x201D; shall be deemed to include in meaning &#x201C;historic,&#x201D; as well as a consideration of the probable effects of the line on the health and safety of the <span class="dictionary">persons</span> in the area concerned.
			&#x201C;<span class="dictionary">Interested parties</span>&#x201D; includes the governing bodies of any counties or municipalities through which the line is proposed to be built and <span class="dictionary">persons</span> residing or owning property in each such county or <span class="dictionary">municipality</span>.
			&#x201C;<span class="dictionary">Public utility</span>&#x201D; means a <span class="dictionary">public utility</span> as defined in &#xA7;&#xA0;<a class="law" title="Definitions" href="/56-265.1/">56-265.1</a>.
			&#x201C;<span class="dictionary">Qualifying facilities</span>&#x201D; means a cogeneration or small power production facility that meets the criteria of 18 C.F.R. Part 292.
			&#x201C;Reasonably accommodate requests to wheel or transmit power&#x201D; means: <a id="paragraph-256549" class="section-permalink" href="https://vacode.org/56-46.1/#D"><i class="fa fa-link"/></a></p></section>
						<section id="D1" class="indent-1"><p><span class="prefix-number">1.</span> That the applicant will make available to new electric generation facilities constructed after January 9, 1991, <span class="dictionary">qualifying facilities</span> and other nonutilities, a minimum of one-fourth of the total megawatts of the additional transmission capacity created by the proposed line, for the purpose of wheeling to <span class="dictionary">public utility</span> purchasers the power generated by such <span class="dictionary">qualifying facilities</span> and other nonutility facilities which are awarded a power purchase <span class="dictionary">contract</span> by a <span class="dictionary">public utility</span> purchaser in compliance with applicable state <span class="dictionary">law</span> or regulations governing bidding or capacity acquisition programs for the purchase of electric capacity from nonutility sources, provided that the obligation of the applicant will extend only to those requests for wheeling service made within the 12 months following certification by the State <span class="dictionary">Corporation</span> <span class="dictionary">Commission</span> of the transmission line and with effective dates for commencement of such service within the 12 months following completion of the transmission line; and <a id="paragraph-256550" class="section-permalink" href="https://vacode.org/56-46.1/#D1"><i class="fa fa-link"/></a></p></section>
						<section id="D2" class="indent-1"><p><span class="prefix-number">2.</span> That the wheeling service offered by the applicant, pursuant to subdivision 1, will reasonably further the purposes of the Public Utilities Regulatory Policies Act of 1978 (P. L. 95-617), as demonstrated by submitting to the <span class="dictionary">Commission</span>, with its application for approval of the line, the cost methodologies, terms, conditions, and dispatch and interconnection requirements the applicant intends, subject to any applicable requirements of the Federal Energy Regulatory <span class="dictionary">Commission</span>, to include in its agreements for such wheeling service. <a id="paragraph-256551" class="section-permalink" href="https://vacode.org/56-46.1/#D2"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> In the event that, at any time after the giving of the notice required in subsection B, it appears to the <span class="dictionary">Commission</span> that consideration of a route or routes significantly different from the route described in the notice is desirable, the <span class="dictionary">Commission</span> shall cause notice of the new route or routes to be published and mailed in accordance with subsection B. The <span class="dictionary">Commission</span> shall thereafter comply with the provisions of this section with respect to the new route or routes to the full extent necessary to give affected localities, federally recognized Tribal Nations in the Commonwealth, and <span class="dictionary">interested parties</span> in the newly affected areas the same protection afforded to affected localities and <span class="dictionary">interested parties</span> affected by the route described in the original notice. <a id="paragraph-256552" class="section-permalink" href="https://vacode.org/56-46.1/#E"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> Approval of a transmission line pursuant to this section shall be deemed to satisfy the requirements of &#xA7; <a class="law" title="Legal status of plan" href="/15.2-2232/">15.2-2232</a> and local zoning <span class="dictionary">ordinances</span> with respect to such transmission line. <a id="paragraph-256553" class="section-permalink" href="https://vacode.org/56-46.1/#F"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> The <span class="dictionary">Commission</span> shall enter into a <span class="dictionary">memorandum</span> of agreement with the Department of Environmental Quality regarding the coordination of their reviews of the environmental impact of electric generating plants and associated facilities. If the proposed plants or associated facilities are in a locality identified by the Ombudsman for Tribal Consultation pursuant to subdivision B 2 of &#xA7; <a class="law" title="Liaison to Virginia Indian tribes; Ombudsman for Tribal Consultation; Virginia Indigenous People's Trust Fund" href="/2.2-401.01/">2.2-401.01</a>, such consultation information shall be included in the <span class="dictionary">memorandum</span> of agreement. <a id="paragraph-256554" class="section-permalink" href="https://vacode.org/56-46.1/#G"><i class="fa fa-link"/></a></p></section>
						<section id="H"><p><span class="prefix-number">H.</span> An applicant that is required to obtain (i) a certificate of public convenience and necessity from the <span class="dictionary">Commission</span> for any electric generating facility, electric transmission line, natural or manufactured gas transmission line as defined in 49 C.F.R. &#xA7; 192.3, or natural or manufactured gas storage facility (hereafter, an energy facility) and (ii) an environmental permit for the energy facility that is subject to issuance by any agency or board within the Secretariat of Natural and Historic Resources, may request a pre-application planning and review process. In any such request to the <span class="dictionary">Commission</span> or the Secretariat of Natural and Historic Resources, the applicant shall identify the proposed energy facility for which it requests the pre-application planning and review process. The <span class="dictionary">Commission</span>, the Department of Environmental Quality, the Marine Resources <span class="dictionary">Commission</span>, the Department of Wildlife Resources, the Department of Historic Resources, the Department of Conservation and Recreation, and other appropriate agencies of the Commonwealth shall participate in the pre-application planning and review process. Participation in such process shall not limit the authority otherwise provided by <span class="dictionary">law</span> to the <span class="dictionary">Commission</span> or other agencies or boards of the Commonwealth. The <span class="dictionary">Commission</span> and other participating agencies and boards of the Commonwealth may invite federal and local governmental entities charged by <span class="dictionary">law</span> with responsibility for issuing permits or approvals and potentially impacted federally recognized Tribal Nations in the Commonwealth to participate in the pre-application planning and review process. Through the pre-application planning and review process, the applicant, the <span class="dictionary">Commission</span>, participating agencies and boards of the Commonwealth, and potentially impacted federally recognized Tribal Nations in the Commonwealth shall identify the potential impacts and approvals that may be required and shall develop a plan that will provide for an efficient and coordinated review of the proposed energy facility. The plan shall include (a) a list of the permits or other approvals likely to be required based on the information available, (b) a specific plan and preliminary schedule for the different reviews, (c) a plan for coordinating those reviews and the related public comment process, and (d) designation of points of contact, either within each agency or for the Commonwealth as a whole, to facilitate this coordination. The plan shall be made readily available to the public and shall be maintained on a dedicated website to provide current information on the status of each component of the plan and each approval process including opportunities for public comment. <a id="paragraph-256555" class="section-permalink" href="https://vacode.org/56-46.1/#H"><i class="fa fa-link"/></a></p></section>
						<section id="I"><p><span class="prefix-number">I.</span> The provisions of this section shall not apply to the construction and operation of a small renewable energy project, as defined in &#xA7; <a class="law" title="(Effective July 1, 2026) Definitions" href="/10.1-1197.5/">10.1-1197.5</a>, by a utility regulated pursuant to this title for which the Department of Environmental Quality has issued a permit by rule pursuant to Article 5 (&#xA7; <a class="law" title="(Effective July 1, 2026) Definitions" href="/10.1-1197.5/">10.1-1197.5</a> et seq.) of Chapter 11.1 of Title 10.1. <a id="paragraph-256556" class="section-permalink" href="https://vacode.org/56-46.1/#I"><i class="fa fa-link"/></a></p></section>
						<section id="J"><p><span class="prefix-number">J.</span> Approval under this section shall not be required for any transmission line for which a certificate of public convenience and necessity is not required pursuant to subdivision A of &#xA7; <a class="law" title="Certificate of convenience and necessity required for acquisition, etc., of new facilities" href="/56-265.2/">56-265.2</a>. <a id="paragraph-256557" class="section-permalink" href="https://vacode.org/56-46.1/#J"><i class="fa fa-link"/></a></p></section></text><history>1972, c. 652; 1973, c. 307; 1974, c. 498; 1983, c. 438; 1984, cc. 287, 562; 1985, c. 282; 1991, cc. 90, 148; 1996, c. 254; 2001, c. 758; 2002, c. 483; 2007, cc. 756, 761, 776, 825; 2009, cc. 808, 854; 2011, cc. 236, 243; 2012, cc. 54, 284; 2016, cc. 192, 276; 2020, cc. 450, 958; 2021, Sp. Sess. I, c. 327; 2024, c. 830.</history><metadata></metadata></law>