<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>60555</law_id><section_number>56-603</section_number><catch_line>Definitions</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><structure><unit label="title" level="1" order_by="1" identifier="56">Public Service Companies</unit><unit label="chapter" level="2" order_by="1" identifier="26">Steps to Advance Virginia's Energy Plan (SAVE) Act</unit></structure><text>
						<section><p>As used in this chapter:
		&#x201C;<span class="dictionary">Commission</span>&#x201D; means the State <span class="dictionary">Corporation</span> <span class="dictionary">Commission</span>.
		&#x201C;<span class="dictionary">Eligible infrastructure replacement</span>&#x201D; means <span class="dictionary"><span class="dictionary">natural gas utility</span> facility replacement projects</span> that: (i) enhance safety or reliability by reducing system integrity risks associated with customer outages, corrosion, equipment failures, <span class="dictionary">material</span> failures, or natural forces; (ii) do not increase revenues by directly connecting the infrastructure replacement to new customers; (iii) reduce or have the potential to reduce greenhouse gas emissions; (iv) are commenced on or after January 1, 2010; and (v) are not included in the <span class="dictionary">natural gas utility</span>&#x2019;s <span class="dictionary">rate</span> base in its most recent <span class="dictionary">rate</span> case using the cost of service methodology set forth in &#xA7;&#xA0;<a class="law" title="All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies" href="/56-235.2/">56-235.2</a>, or the <span class="dictionary">natural gas utility</span>&#x2019;s <span class="dictionary">rate</span> base included in the <span class="dictionary">rate</span> base <span class="dictionary">schedules</span> filed with a performance-based regulation plan authorized by &#xA7;&#xA0;<a class="law" title="Optional performance-based regulation of certain utilities" href="/56-235.6/">56-235.6</a>, if the plan did not include the <span class="dictionary">rate</span> base. &#x201C;<span class="dictionary">Eligible infrastructure replacement</span>&#x201D; includes <span class="dictionary"><span class="dictionary">natural gas utility</span> facility replacement projects</span> that are identified as a result of an <span class="dictionary">enhanced leak detection and repair program</span>.
		&#x201C;<span class="dictionary"><span class="dictionary">Eligible infrastructure replacement</span> costs</span>&#x201D; includes the following:</p></section>
						<section id="1"><p><span class="prefix-number">1.</span> Return on the <span class="dictionary">investment</span>. In calculating the return on the <span class="dictionary">investment</span>, the <span class="dictionary">Commission</span> shall use the <span class="dictionary">natural gas utility</span>&#x2019;s regulatory capital structure as calculated utilizing the weighted average cost of capital, including the cost of debt and the cost of <span class="dictionary">equity</span> used in determining the <span class="dictionary">natural gas utility</span>&#x2019;s base <span class="dictionary">rates</span> in effect during the construction period of the <span class="dictionary">eligible infrastructure replacement</span> project. If the <span class="dictionary">natural gas utility</span>&#x2019;s cost of capital underlying the base <span class="dictionary">rates</span> in effect at the time its proposed <span class="dictionary">SAVE plan</span> is filed has not been changed by <span class="dictionary">order</span> of the <span class="dictionary">Commission</span> within the preceding five years, the <span class="dictionary">Commission</span> may require the <span class="dictionary">natural gas utility</span> to file an updated weighted average cost of capital, and the <span class="dictionary">natural gas utility</span> may propose an updated weighted average cost of capital. The <span class="dictionary">natural gas utility</span> may recover the external costs associated with establishing its updated weighted average cost of capital through the <span class="dictionary">SAVE rider</span>. Such external costs shall include legal costs and consultant costs; <a id="paragraph-221359" class="section-permalink" href="https://vacode.org/56-603/#1"><i class="fa fa-link"/></a></p></section>
						<section id="2"><p><span class="prefix-number">2.</span> A revenue conversion factor, including income taxes and an allowance for bad debt expense, shall be applied to the required operating income resulting from the <span class="dictionary"><span class="dictionary">eligible infrastructure replacement</span> costs</span>; <a id="paragraph-221360" class="section-permalink" href="https://vacode.org/56-603/#2"><i class="fa fa-link"/></a></p></section>
						<section id="3"><p><span class="prefix-number">3.</span> Depreciation. In calculating depreciation, the <span class="dictionary">Commission</span> shall use the <span class="dictionary">natural gas utility</span>&#x2019;s current depreciation <span class="dictionary">rates</span>; <a id="paragraph-221361" class="section-permalink" href="https://vacode.org/56-603/#3"><i class="fa fa-link"/></a></p></section>
						<section id="4"><p><span class="prefix-number">4.</span> Property taxes; <a id="paragraph-221362" class="section-permalink" href="https://vacode.org/56-603/#4"><i class="fa fa-link"/></a></p></section>
						<section id="5"><p><span class="prefix-number">5.</span> Carrying costs on the over- or under-recovery of the <span class="dictionary"><span class="dictionary">eligible infrastructure replacement</span> costs</span>. In calculating the carrying costs, the <span class="dictionary">Commission</span> shall use the <span class="dictionary">natural gas utility</span>&#x2019;s regulatory capital structure as determined in subdivision 1 of the definition of <span class="dictionary"><span class="dictionary">eligible infrastructure replacement</span> costs</span>; and <a id="paragraph-221363" class="section-permalink" href="https://vacode.org/56-603/#5"><i class="fa fa-link"/></a></p></section>
						<section id="6"><p><span class="prefix-number">6.</span> <span class="dictionary">Enhanced leak detection and repair program</span> costs. Such costs shall include the costs of operating an <span class="dictionary">enhanced leak detection and repair program</span>.
			&#x201C;<span class="dictionary">Enhanced leak detection and repair program</span>&#x201D; means a program that is designed to allow a <span class="dictionary">natural gas utility</span> to deploy advanced leak detection technologies to more accurately identify active leaks as part of the <span class="dictionary">natural gas utility</span>&#x2019;s leak management program and to prioritize the repair of leaks that present a risk to safety or the environment. A <span class="dictionary">natural gas utility</span> may <span class="dictionary">amend</span> its <span class="dictionary">SAVE plan</span> to include an <span class="dictionary">enhanced leak detection and repair program</span> by filing an application to <span class="dictionary">amend</span> its previously approved <span class="dictionary">SAVE plan</span>, as set forth in subsection B of &#xA7; <a class="law" title="Filing of petition with Commission to establish or amend a SAVE plan; recovery of certain costs; procedure" href="/56-604/">56-604</a>.
			&#x201C;<span class="dictionary">Investment</span>&#x201D; means costs incurred on <span class="dictionary">eligible infrastructure replacement</span> projects including planning, development, and construction costs; costs of infrastructure associated therewith; and an allowance for funds used during construction. In calculating the allowance for funds used during construction, the <span class="dictionary">Commission</span> shall use the <span class="dictionary">natural gas utility</span>&#x2019;s actual regulatory capital structure as determined in subdivision 1 of the definition of <span class="dictionary"><span class="dictionary">eligible infrastructure replacement</span> costs</span>.
			&#x201C;<span class="dictionary">Natural gas utility</span>&#x201D; means any investor-owned <span class="dictionary">public service company</span> engaged in the business of furnishing natural gas service to the public.
			&#x201C;<span class="dictionary"><span class="dictionary">Natural gas utility</span> facility replacement project</span>&#x201D; means the replacement of storage, peak shaving, transmission or distribution facilities used in the delivery of natural gas, or supplemental or substitute forms of gas sources by a <span class="dictionary">natural gas utility</span>.
			&#x201C;SAVE&#x201D; means Steps to Advance Virginia&#x2019;s Energy Plan.
			&#x201C;<span class="dictionary">SAVE plan</span>&#x201D; means a plan filed by a <span class="dictionary">natural gas utility</span> that identifies proposed <span class="dictionary">eligible infrastructure replacement</span> projects and a <span class="dictionary">SAVE rider</span>.
			&#x201C;<span class="dictionary">SAVE rider</span>&#x201D; means a recovery mechanism that will allow for recovery of the <span class="dictionary"><span class="dictionary">eligible infrastructure replacement</span> costs</span>, through a separate mechanism from the customer <span class="dictionary">rates</span> established in a <span class="dictionary">rate</span> case using the cost of service methodology set forth in &#xA7; <a class="law" title="All rates, tolls, etc., to be just and reasonable to jurisdictional customers; findings and conclusions to be set forth; alternative forms of regulation for electric companies" href="/56-235.2/">56-235.2</a>, or a performance-based regulation plan authorized by &#xA7; <a class="law" title="Optional performance-based regulation of certain utilities" href="/56-235.6/">56-235.6</a>. <a id="paragraph-221364" class="section-permalink" href="https://vacode.org/56-603/#6"><i class="fa fa-link"/></a></p></section></text><history>2010, cc. 142, 514; 2022, cc. 728, 759.</history><metadata></metadata></law>
