<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>57231</law_id><section_number>56-617</section_number><catch_line> Public rights-of-way use fee</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><structure><unit label="title" level="1" order_by="1" identifier="56">Public Service Companies</unit><unit label="chapter" level="2" order_by="1" identifier="29">Renewable Energy Co-Location of Distribution Facilities</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Notwithstanding any other provisions of <span class="dictionary">law</span>, there is hereby established a <span class="dictionary">public rights-of-way use fee</span> to be charged in lieu of any and all fees of general application, except for zoning, subdivision, site plan, and comprehensive plan fees of general application, otherwise chargeable to a <span class="dictionary">renewable generator</span> by the Department of Transportation or a <span class="dictionary">locality</span> in connection with a permit for such occupation and use granted in accordance with &#xA7; <a class="law" title=" Right to occupy rights-of-way; location of rights-of-way" href="/56-615/">56-615</a> or <a class="law" title=" Occupation of property of certain localities; imposition of terms and conditions as to use of property" href="/56-616/">56-616</a>. The <span class="dictionary">public rights-of-way use fee</span> established by this section is imposed on all <span class="dictionary">renewable generators</span> that occupy and use public rights-of-way in <span class="dictionary">order</span> to (i) supply electricity generated at its <span class="dictionary">renewable energy facility</span> to the electric distribution grid, (ii) distribute steam generated at its <span class="dictionary">renewable energy facility</span> to customers, or (iii) supply landfill gas to customers or to a natural gas distribution or transmission pipeline. <a id="paragraph-209652" class="section-permalink" href="https://vacode.org/56-617/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> The amount of the <span class="dictionary">public rights-of-way use fee</span> for a <span class="dictionary">renewable generator</span> shall be $1,500 per mile or any portion thereof over which the <span class="dictionary">renewable generator</span> has installed <span class="dictionary">distribution facilities</span>. <a id="paragraph-209653" class="section-permalink" href="https://vacode.org/56-617/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> A <span class="dictionary">renewable generator</span> shall remit its required <span class="dictionary">public rights-of-way use fee</span> to the <span class="dictionary">locality</span> or the Department of Transportation, as applicable, prior to initiation of construction, as follows: <a id="paragraph-209654" class="section-permalink" href="https://vacode.org/56-617/#C"><i class="fa fa-link"/></a></p></section>
						<section id="C1" class="indent-1"><p><span class="prefix-number">1.</span> The <span class="dictionary">renewable generator</span> shall remit directly to the applicable <span class="dictionary">locality</span> all <span class="dictionary">public rights-of-way use fees</span> billed in (i) cities, (ii) towns whose public streets and roads are not maintained by the Department of Transportation, and (iii) any county that has withdrawn or elects to withdraw from the secondary system of state highways under the provisions of &#xA7; 11 of Chapter 415 of the Acts of Assembly of 1932 and that has elected not to return. <a id="paragraph-209655" class="section-permalink" href="https://vacode.org/56-617/#C1"><i class="fa fa-link"/></a></p></section>
						<section id="C2" class="indent-1"><p><span class="prefix-number">2.</span> The <span class="dictionary">public rights-of-way use fees</span> in all other counties shall be remitted by each <span class="dictionary">renewable generator</span> to the Department of Transportation, and shall first be used to offset the administrative costs of processing the permit with the remaining fee being added to the secondary system construction improvement program funds of the counties where the facilities are located. <a id="paragraph-209656" class="section-permalink" href="https://vacode.org/56-617/#C2"><i class="fa fa-link"/></a></p></section></text><history>2009, c. 807, &#xA7; 67-1103; 2013, cc. 585, 646; 2021, Sp. Sess. I, c. 387.</history><metadata></metadata></law>
