<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>81349</law_id><section_number>58.1-2636</section_number><catch_line>Revenue share for solar energy projects and energy storage systems</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>58.1-2606.1</reference><reference>58.1-3660</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="58.1">Taxation</unit><unit label="subtitle" level="2" order_by="1" identifier="II">Taxes Administered by Other Agencies</unit><unit label="chapter" level="3" order_by="1" identifier="26">Taxation of Public Service Corporations</unit><unit label="article" level="4" order_by="1" identifier="2">License Tax on Telegraph, Telephone, Water, Heat, Light, Power and Pipeline Companies</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> 1. Any locality may by <span class="dictionary">ordinance</span> assess a revenue share of (i) up to $1,400 per megawatt, as measured in alternating current (AC) generation capacity of the nameplate capacity of the facility based on submissions by the facility owner to the interconnecting utility, on any solar photovoltaic (electric energy) project, or (ii) up to $1,400 per megawatt, as measured in alternating current (AC) storage capacity, on any energy storage system. <a id="paragraph-291542" class="section-permalink" href="https://vacode.org/58.1-2636/#A"><i class="fa fa-link"/></a></p></section>
						<section id="A2" class="indent-1"><p><span class="prefix-number">2.</span> Except as prohibited by subdivision 3, the maximum amount of the revenue share that may be imposed shall be increased on July 1, 2026, and every five years thereafter by 10 percent. <a id="paragraph-291543" class="section-permalink" href="https://vacode.org/58.1-2636/#A2"><i class="fa fa-link"/></a></p></section>
						<section id="A3" class="indent-1"><p><span class="prefix-number">3.</span> The provisions of subdivision 2 shall not apply to solar photovoltaic projects or energy storage systems for which an application has been filed with the locality, as defined by subsection D of &#xA7; <a class="law" title="Certified pollution control equipment and facilities" href="/58.1-3660/">58.1-3660</a>, and such application has been approved by the locality prior to January 1, 2021. The provisions of subdivision 2 shall apply to all such projects and systems for which an application is approved by the locality on or after January 1, 2021. <a id="paragraph-291544" class="section-permalink" href="https://vacode.org/58.1-2636/#A3"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> For purposes of this section, &#x201C;solar photovoltaic (electric energy) project&#x201D; shall not include any project that is (i) described in &#xA7; <a class="law" title="Net energy metering provisions" href="/56-594/">56-594</a>, <a class="law" title="Net energy metering provisions for electric cooperative service territories" href="/56-594.01/">56-594.01</a>, <a class="law" title="Solar-powered or wind-powered electricity generation; power purchase agreements; pilot programs" href="/56-594.02/">56-594.02</a>, or <a class="law" title="Small agricultural generators" href="/56-594.2/">56-594.2</a>; (ii) 20 megawatts or less, as measured in alternating current (AC) generation capacity, for which an initial interconnection request form has been filed with an electric utility or a regional transmission organization on or before December 31, 2018; or (iii) five megawatts or less. <a id="paragraph-291545" class="section-permalink" href="https://vacode.org/58.1-2636/#B"><i class="fa fa-link"/></a></p></section></text><history>2020, cc. 1224, 1270; 2021, Sp. Sess. I, cc. 49, 50, 429.</history><metadata></metadata></law>
