<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>62679</law_id><section_number>62.1-266</section_number><catch_line>Ground water withdrawal permits</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>10.1-1186.3:1</reference><reference>62.1-258.1</reference><reference>62.1-260</reference><reference>62.1-262</reference><reference>62.1-262.1</reference><reference>62.1-262.2</reference><reference>62.1-267</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="25">Ground Water Management Act of 1992</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> The <span class="dictionary">Board</span> may <span class="dictionary">issue</span> any <span class="dictionary">ground water withdrawal permit</span> upon terms, conditions, and limitations necessary for the protection of the public welfare, safety, and health. <a id="paragraph-228538" class="section-permalink" href="https://vacode.org/62.1-266/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Applications for <span class="dictionary">ground water withdrawal permits</span> shall be in a form prescribed by the <span class="dictionary">Board</span> and shall contain such information, consistent with this chapter, as the <span class="dictionary">Board</span> deems necessary. <a id="paragraph-228539" class="section-permalink" href="https://vacode.org/62.1-266/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> All <span class="dictionary">ground water withdrawal permits</span> issued by the <span class="dictionary">Board</span> under this chapter shall have a fixed term not to exceed 15 years. The term of a <span class="dictionary">ground water withdrawal permit</span> issued by the <span class="dictionary">Board</span> shall not be extended by modification beyond the maximum duration, and the permit shall expire at the end of the term unless a complete application for a new permit has been filed in a timely manner as required by the regulations of the <span class="dictionary">Board</span>, and the <span class="dictionary">Board</span> is unable, through no fault of the permittee, to <span class="dictionary">issue</span> a new permit before the expiration date of the previous permit. <a id="paragraph-228540" class="section-permalink" href="https://vacode.org/62.1-266/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> Renewed <span class="dictionary">ground water withdrawal permits</span> shall be for a withdrawal amount that includes such savings as can be demonstrated to have been achieved through water conservation, provided that a <span class="dictionary">beneficial use</span> of the permitted ground water can be demonstrated for the following permit term. <a id="paragraph-228541" class="section-permalink" href="https://vacode.org/62.1-266/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> Any permit issued by the <span class="dictionary">Board</span> under this chapter may, after notice and opportunity for a <span class="dictionary">hearing</span>, be amended or revoked on any of the following grounds or for good cause as may be provided by the regulations of the <span class="dictionary">Board</span>: <a id="paragraph-228542" class="section-permalink" href="https://vacode.org/62.1-266/#E"><i class="fa fa-link"/></a></p></section>
						<section id="E1" class="indent-1"><p><span class="prefix-number">1.</span> The permittee has violated any regulation or <span class="dictionary">order</span> of the <span class="dictionary">Board</span> pertaining to ground water, any condition of a <span class="dictionary">ground water withdrawal permit</span>, any provision of this chapter, or any <span class="dictionary">order</span> of a <span class="dictionary">court</span>, where such violation presents a hazard or potential hazard to human health or the environment or is representative of a pattern of serious or repeated violations that, in the <span class="dictionary">opinion</span> of the <span class="dictionary">Board</span>, demonstrates the permittee&#x2019;s disregard for or inability to comply with applicable <span class="dictionary">laws</span>, regulations, or requirements; <a id="paragraph-228543" class="section-permalink" href="https://vacode.org/62.1-266/#E1"><i class="fa fa-link"/></a></p></section>
						<section id="E2" class="indent-1"><p><span class="prefix-number">2.</span> The permittee has failed to disclose fully all relevant <span class="dictionary">material</span> <span class="dictionary">facts</span> or has misrepresented a <span class="dictionary">material</span> <span class="dictionary">fact</span> in applying for a permit, or in any other report or document required under this chapter or under the ground water withdrawal regulations of the <span class="dictionary">Board</span>; <a id="paragraph-228544" class="section-permalink" href="https://vacode.org/62.1-266/#E2"><i class="fa fa-link"/></a></p></section>
						<section id="E3" class="indent-1"><p><span class="prefix-number">3.</span> The activity for which the permit was issued endangers human health or the environment and can be regulated to acceptable levels by amendment or <span class="dictionary">revocation</span> of the permit; or <a id="paragraph-228545" class="section-permalink" href="https://vacode.org/62.1-266/#E3"><i class="fa fa-link"/></a></p></section>
						<section id="E4" class="indent-1"><p><span class="prefix-number">4.</span> There exists a <span class="dictionary">material</span> change in the basis on which the permit was issued that requires either a temporary or a permanent reduction or elimination of the withdrawal controlled by the permit necessary to protect human health or the environment. <a id="paragraph-228546" class="section-permalink" href="https://vacode.org/62.1-266/#E4"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> No application for a <span class="dictionary">ground water withdrawal permit</span> shall be considered complete unless the applicant has provided the Executive Director of the <span class="dictionary">Board</span> with notification from the governing body of the locality in which the withdrawal is to occur that the location and operation of the withdrawing facility is in compliance with all <span class="dictionary">ordinances</span> adopted pursuant to Chapter 22 (&#xA7; <a class="law" title="Declaration of legislative intent" href="/15.2-2200/">15.2-2200</a> et seq.) of Title 15.2. The provisions of this subsection shall not apply to any applicant exempt from compliance under Chapter 22 (&#xA7; <a class="law" title="Declaration of legislative intent" href="/15.2-2200/">15.2-2200</a> et seq.) of Title 15.2. <a id="paragraph-228547" class="section-permalink" href="https://vacode.org/62.1-266/#F"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> A <span class="dictionary">ground water withdrawal permit</span> shall authorize withdrawal of a specific amount of ground water through a single well or system of wells, including a backup well or wells, or such other means as the withdrawer specifies. <a id="paragraph-228548" class="section-permalink" href="https://vacode.org/62.1-266/#G"><i class="fa fa-link"/></a></p></section>
						<section id="H"><p><span class="prefix-number">H.</span> The <span class="dictionary">Board</span> may adopt regulations to develop a general permit for the regulation of <span class="dictionary">irrigation</span> withdrawals from the <span class="dictionary">surficial aquifer</span> greater than 300,000 gallons in any one month. Regulations adopted pursuant to this subsection shall provide that withdrawals from the <span class="dictionary">surficial aquifer</span> may be permitted under either a general permit developed pursuant to this subsection or another <span class="dictionary">ground water withdrawal permit</span>. <a id="paragraph-228549" class="section-permalink" href="https://vacode.org/62.1-266/#H"><i class="fa fa-link"/></a></p></section>
						<section id="I"><p><span class="prefix-number">I.</span> The <span class="dictionary">Board</span> shall promulgate regulations establishing criteria for determining whether the quantity or quality of the ground water in a <span class="dictionary">surficial aquifer</span> is adequate to meet a proposed <span class="dictionary">beneficial use</span>. Such regulations shall specify the information required to be submitted to the <span class="dictionary">Department</span> by a golf course or any other <span class="dictionary">person</span> seeking a determination from the <span class="dictionary">Department</span> that either the quantity or quality of the ground water in a <span class="dictionary">surficial aquifer</span> is not adequate to meet a proposed <span class="dictionary">beneficial use</span>. Such regulations shall require the <span class="dictionary">Department</span>, within 30 days of receipt of a complete request, to make a determination as to the adequacy of the quantity or quality of the ground water in a <span class="dictionary">surficial aquifer</span>. <a id="paragraph-228550" class="section-permalink" href="https://vacode.org/62.1-266/#I"><i class="fa fa-link"/></a></p></section>
						<section id="J"><p><span class="prefix-number">J.</span> If the proposed permit will allow for ground water withdrawals greater than 365 million gallons per year in a locality identified by the Ombudsman for Tribal Consultation pursuant to subdivision B 2 of &#xA7; <a class="law" title="Liaison to Virginia Indian tribes; Ombudsman for Tribal Consultation; Virginia Indigenous People's Trust Fund" href="/2.2-401.01/">2.2-401.01</a>, the <span class="dictionary">Board</span> shall ensure that the <span class="dictionary">Department</span> consults with any potentially impacted federally recognized Tribal Nations in the Commonwealth pursuant to the policies and procedures adopted by the <span class="dictionary">Department</span> pursuant to &#xA7; <a class="law" title="Policies for consultation with federally recognized Tribal Nations in the Commonwealth" href="/10.1-1186.3_1/">10.1-1186.3:1</a>. Should feedback from potentially impacted federally recognized Tribal Nations in the Commonwealth not be received by the deadline established in the <span class="dictionary">Department</span>&#x2019;s policies and procedures, the consultation provisions of this section shall be deemed fulfilled. <a id="paragraph-228551" class="section-permalink" href="https://vacode.org/62.1-266/#J"><i class="fa fa-link"/></a></p></section></text><history>1992, c. 812; 2018, c. 424; 2020, c. 670; 2024, c. 830.</history><metadata></metadata></law>
